The user wants a "health system wildfire evacuation tabletop exercise library."
This needs to be a comprehensive resource that a healthcare organization (hospital, clinic, long-term care) could use to run their own internal drills.
Key Components Requested:
- Scenario Injects: The specific events/information given to the players during the drill to drive the action.
- Command Roles: Who is participating and what are their responsibilities during the exercise.
- After-Action Reviews (AAR): Questions to ask afterwards to evaluate performance.
Target Audience: Healthcare emergency managers, hospital administrators, clinical leadership.
Structure of the Response:
I should structure this as a "Library" or a toolkit. It shouldn't just be one scenario; it should offer a framework and perhaps varying levels of complexity.
- Introduction: Briefly explain the purpose and scope.
- Module 1: Exercise Design & Roles: Define the players (Incident Command, Operations, Logistics, etc.).
- Module 2: Scenario Library (The Injects): I'll create a few distinct scenarios to make it a "library."
- Scenario A: The Slow Burn (Planned Evacuation) - focus on logistics and tracking.
- Scenario B: The Wind Shift (Rapid/Emergency Evacuation) - focus on immediate decision-making and life safety.
- Scenario C: Infrastructure Failure (Combined Hazard) - loss of power/water during the fire.
- Module 3: Master Inject List: Specific injects that can be plugged into any scenario (e.g., "Traffic jam," "Patient refusal," "Media inquiry").
- Module 4: Evaluation & AAR: Templates for the hot wash and formal report.
Drafting Content - Specifics:
Refining the Tone: Professional, directive, organized, and actionable. Use formatting (bolding, lists) to make it readable.
Self-Correction/Optimization:
- Initial thought: Just give one big scenario.
- Correction: The prompt asks for a "library." I should provide a modular approach where they can pick different injects.
- Detail: Make sure to mention "Horizontal vs. Vertical" evacuation and "Shelter in Place" vs. "Full Evacuation" as decision points. Wildfires often involve smoke/air quality issues even if the fire isn't right next door.
Plan:
- Title: Health System Wildfire Evacuation TTX Library.
- Setup: Objectives, Assumptions, HICS Roles.
- Scenario 1 (The Urgent Trigger): Rapid onset.
- Scenario 2 (The Operational Nightmare): Logistics focus.
- Inject Bank: A list of modular problems to introduce.
- AAR Section: Discussion questions.
Let's write this out.
-
Inject ideas: "N-95 shortage due to smoke," "Ventilator dependent patients," "Cell towers down," "Staff unable to report."
-
Command Roles: Make sure to explicitly link them to the tasks (e.g., Logistics handles the bus contracts).
-
AAR: Focus on "Sustain" and "Improve."
This looks solid. I will structure the response clearly with headers. I will also include a "Facilitator Note" to help them run it.
This is a comprehensive Health System Wildfire Evacuation Tabletop Exercise (TTX) Library. This resource is designed for Hospital Administrators, Emergency Managers, and Clinical Leaders to pressure test their Emergency Operations Plans (EOP) regarding wildfire threats.
This library is organized into three sections:
- Command Roles & Organization (Who is playing).
- Scenario & Inject Library (The narrative and problems).
- After-Action Review (AAR) (The evaluation).
Part 1: Exercise Setup & Command Roles
Before beginning the exercise, assign the following roles to specific individuals in your organization. Ideally, these should be the roles they would hold in a real incident (ICS/NIMS structure).
Core Command Staff (The Players)
- Incident Commander (IC): (Usually Hospital Administrator or C-Suite)
- Focus: Strategic oversight, evacuation decision timing, final authority.
- Operations Section Chief: (Usually CNO/VP of Nursing)
- Focus: Patient movement, clinical care, staffing ratios, life safety.
- Logistics Section Chief: (Usually Facilities/Supply Chain Director)
- Focus: Transportation resources, fuel, power (generators), IT/Server protection, supply chains.
- Planning Section Chief: (Usually Emergency Manager or Quality Director)
- Focus: Situation status, tracking evacuated patients, documentation, future projections (weather/track).
- Liaison Officer:
- Focus: Communication with Fire Department, EMS, Public Health, and receiving hospitals.
The Simulation Cell (SimCell)
These are the facilitators who deliver the injects and control the "reality" of the drill.
Part 2: Scenario & Inject Library
Scenario Background: It is late October. Regional humidity is at 5%, and Santa Ana (or local equivalent) winds are sustained at 45mph with gusts up to 60mph. A brush fire has started 15 miles west of the facility and is moving rapidly East, driven by wind.
Phase 1: Warning & Preparation (T-minus 4 Hours)
Goal: Assess situational awareness and preparatory actions.
Inject 1.1: The Notification
- Format: Phone call / Email
- Message: "This is County Fire Dispatch. The 'Canyon Fire' has jumped the river and is moving East toward the industrial park. It is currently 12 miles away. We recommend you move to ALERT status. Road closures are beginning on Highway 1."
- Key Question for Players: How do we verify this? Who needs to be notified internally? Do we cancel elective surgeries?
Inject 1.2: The Smoke
- Format: Observation / Facilities Report
- Message: Heavy smoke is visible on the horizon. The HVAC system is pulling smoke into the facility. The air quality index (AQI) inside the ED waiting room is rising rapidly.
- Key Question for Players: Can we switch the HVAC to 100% recirculation? Do we have enough N95 masks for patients and visitors? What about visitors with respiratory issues?
Inject 1.3: Staffing Anxiety
- Format: Human Resources Report
- Message: Five critical care nurses have called in. They say their families are evacuating their homes in the threatened zone and they must leave to help them.
- Key Question for Players: What is our policy on staff release during emergencies? Do we have a callback list for off-duty staff? What incentives (hotel rooms) can we offer staff to stay?
Phase 2: The Trigger & Vertical Evacuation (The "Go" Order)
Goal: Test the mechanics of moving vulnerable patients.
Inject 2.1: The Mandatory Order
- Format: Radio Traffic / Liaison Notification
- Message: The Sheriff’s Department has issued an Immediate Evacuation Order for your zone. The fire is now 5 miles away and estimated arrival is 90 minutes.
- Key Question for Players: Who authorizes the full evacuation? How do we triage patients (Ambulatory, Wheelchair, Bedridden, Ventilator)?
Inject 2.2: The IT Crash
- Format: IT Director Report
- Message: Power lines in the west subdivision have failed. Your facility is on generator power. However, the internet circuit providing access to the EMR (Electronic Medical Records) is down due to regional infrastructure damage.
- Key Question for Players: How do we print patient face sheets and medication lists? Do we have downtime forms? How do we track medications without scanning?
Inject 2.3: The Transport Bottleneck
- Format: Logistics Report
- Message: You requested 20 ambulances from the county. The county EMS coordinator says they are all committed to a nursing home fire closer to the source. You have 2 ambulances available and 80 patients to move.
- Key Question for Players: Do we have contracts with private transport companies? Can we use non-ambulance vehicles (buses, employee vans) for ambulatory patients? Who manages the loading dock?
Phase 3: The Crisis & Surprises
Goal: Stress test decision-making under duress.
Inject 3.1: The VIP Dilemma
- Format: Phone Call to Administration
- Message: A local politician or high-profile VIP is in the VIP suite. Their family is demanding a helicopter medivac for them immediately, despite them being ambulatory.
- Key Question for Players: How do we handle pressure to prioritize non-clinical needs? Who communicates this refusal?
Inject 3.2: The Contamination
- Format: Facilities Alert
- Message: As the fire gets closer, the water pressure in the building has dropped significantly due to fire hydrant usage in the neighborhood. Toilets cannot flush; fire suppression systems are compromised.
- Key Question for Players: Can we still evacuate the ICU without water for hygiene? What is the fire risk to the building now?
Inject 3.3: The Unannounced Arrival
- Format: Security Report
- Message: A family car pulls up to the ED entrance. Inside are three burn victims—a mother and two children. They were caught on the road. They bypassed the triage tent.
- Key Question for Players: Do we stop treating current patients to help these new ones? How do we decontaminate them (smoke/soot) while evacuating?
Part 3: After-Action Review (AAR) & Improvement Plan
Once the exercise is concluded, gather the players for a "Hot Wash" guided by these questions.
Discussion Questions (Grouped by Capability)
1. Evacuation Logistics
- Strength: Did we have enough wheelchairs, gurneys, and cribs staged?
- Gap: How long did it actually take to move the first 10 patients vs. the last 10?
- Gap: Did the transport companies we called actually answer?
2. Clinical Continuity
- Strength: Were patient medical records (paper backups) available immediately when the Wi-Fi went down?
- Gap: How did we handle patients on high-flow oxygen when the wall oxygen had to be disconnected? Did we have enough portable tanks?
3. Communication
- Strength: Did the handheld radios work inside the concrete stairwells during vertical evacuation?
- Gap: Did the patients' families know where they were going? (Patient tracking).
- Gap: Was there confusion between the "Incident Commander" and the "Medical Director" regarding who was in charge?
4. Staff Welfare
- Gap: Did staff know where their own families were? Did this impact their ability to focus?
- Gap: Once evacuated, where do the staff sleep? Who pays for their lodging?
Improvement Plan Template
| Issue Identified | Root Cause | Corrective Action | Assigned To | Due Date |
|---|
| Ex: Lack of transport for bariatric patients | Only standard gurneys available | Inventory local bariatric rental agencies and sign MOU | Logistics Chief | 11/30 |
| Ex: EMR went down, no paper charts printed | Downtime printer out of toner | Check downtime kits monthly | IT Director | Immediate |
| Ex: Staff unsure of evacuation routes | Annual training skipped due to COVID | Mandatory e-learning on Fire Safety | Safety Officer | 12/15 |
Glossary of Acronyms for the Exercise
- HICS: Hospital Incident Command System
- EMR: Electronic Medical Record
- ALS/BLS: Advanced/Basic Life Support (Ambulance levels)
- MOU: Memorandum of Understanding (Contracts with other hospitals/transport)