Compose a health system wildfire evacuation tabletop exercise library with scenario…
- User
Compose a health system wildfire evacuation tabletop exercise library with scenario injects, command roles, and after-action reviews.
- Assistant
Health System Wildfire Evacuation Tabletop Exercise (TTX) Library
Overview and Purpose
This TTX library is designed for healthcare systems (hospitals, clinics, long-term care facilities) to practice wildfire evacuation response. It uses the Incident Command System (ICS) framework tailored to healthcare operations. The exercises simulate real-world wildfire threats, emphasizing patient safety, resource allocation, inter-agency coordination, and recovery.
Objectives:
- Test evacuation decision-making and execution.
- Identify gaps in plans, communication, and logistics.
- Build muscle memory for ICS roles.
- Prepare for cascading effects (e.g., power outages, patient surges).
Target Audience: Hospital leadership, emergency managers, clinical staff, public health officials, EMS, fire departments, and local/state agencies.
Exercise Format:
- Duration: 4-6 hours.
- Participants: 20-40 players in command roles; observers/facilitators.
- Materials: Inject packets, maps, flipcharts, ICS forms (e.g., IAPs), scenario maps.
- Facilitator Role: Reads injects at timed intervals; moderates discussion.
Library Structure:
- Base Scenario: "Operation Ember Shield" (primary exercise).
- Variants: Scalable add-ons (e.g., urban vs. rural, mass casualty).
- Command Roles (detailed below).
- Inject Library (timed events).
- After-Action Review (AAR) Template.
Command Roles (ICS-Adapted for Healthcare)
Assign players to these roles. Use vests/badges for identification. Rotate roles across exercises.
Section Role Responsibilities Command Incident Commander (IC) Overall authority; sets objectives; approves IAPs. (CEO or EOC Director) Deputy IC Assists IC; assumes role if needed. Safety Officer Monitors hazards (smoke, ashfall); enforces PPE. Public Information Officer (PIO) Manages media/social media; internal comms. Liaison Officer Coordinates with external agencies (fire, EMS, Red Cross). Operations Operations Chief Oversees tactical ops: patient triage, shelter-in-place vs. evacuate. Evacuation Branch Director Plans/routes transports; tracks patient movement. Medical Ops Branch Director Manages patient care continuity; surge staffing. Facility Security Branch Director Perimeter control; access management. Planning Planning Chief Develops IAPs; tracks situation/status. Situation Unit Leader Maintains wildfire map, weather intel, patient census. Resource Unit Leader Inventories beds/transports/supplies. Logistics Logistics Chief Procures fuel, generators, food, O2. Facilities Unit Leader Sets up alternate care sites (ACS). Medical Supply Unit Leader Tracks meds, ventilators, PPE. Finance/Admin Finance/Admin Chief Tracks costs; mutual aid billing. Technical Experts Wildfire SME (Fire Agency Rep) Provides fire behavior intel. Public Health Rep Monitors air quality, vulnerable populations. IT/Comms Specialist Manages radios, EHR downtime procedures. Hot Seat Players: 1-2 per role for discussion; others observe/note.
Base Scenario: Operation Ember Shield
Setting: MountainView Health System (3 hospitals, 5 clinics) in wildfire-prone California foothills. Dry season; high winds forecast. System serves 500K population; 1,200 beds total.
Synopsis: A 5,000-acre wildfire ignites at 0800 near Hospital A (rural, 200 beds, high ventilator dependency). Winds push it toward urban Hospital B (400 beds) and Clinic Cluster C. Evacuation orders issued; complications include smoke infiltration, power grid threats, and interstate traffic gridlock.
Exercise Timeline: 0900-1500 (simulated time compression: 1 hour real = 4-6 hours sim).
Success Metrics:
- 100% patient accountability.
- No simulated fatalities.
- IAPs issued every 2 sim-hours.
Scenario Inject Library
Injects are timed (real-time delivery). Facilitator reads verbatim; players discuss/respond (10-20 min per inject). Use maps (Google Earth wildfire overlays) and props (patient lists).
Time (Real/Sim) Inject # Event Summary Key Challenges Expected Actions 0 min / 0800 1 Fire reported 5 miles from Hospital A. Red Flag Warning issued. Air quality index (AQI) 150 (unhealthy). Initial denial; business as usual. Activate EOC; monitor weather/fire cams. PIO draft messaging. 30 min / 0830 2 Fire grows to 2,000 acres; spot fires near roads. Voluntary evac for Hospital A catchment. Clinic C reports ashfall. Patient family panic calls. Triage patients (vertical evac priorities: vents, neonates). Request fire brief. 60 min / 0900 3 Sheriff's order: Shelter-in-place for Hospital A; prepare to evacuate. Winds 25mph; Hospital B smoke plume visible. Power flicker warning. Generator test fails on 2 units. Develop IAP-1: Patient census; fuel trucks inbound. Logistics secure generators. 90 min / 0930 4 Fire crosses highway; mandatory evac Hospital A (150 patients). EMS en route (10 ambulances). Surge: 50 walk-ins fearing smoke. Traffic jams block access; O2 shortages. Evac Branch: Load vents first; heli-lift criticals? PIO: "Stay calm" presser. 120 min / 1000 5 Hospital A 50% evacuated. Power outage at Clinic C (dialysis patients). Hospital B AQI 300; NICU alerts. EHR downtime; manual charting. Comms overload. Planning: Track convoy (GPS). Medical Ops: Transfer vents to Hospital B? 180 min / 1030 6 Fire flanks Hospital B; evac order for 200 non-criticals. Red Cross offers 100 shelter beds. Fuel shortage for ambulances. Vulnerable pops (dementia wing) slow. Media frenzy. Ops Chief: Reverse evac? Logistics: Mutual aid fuel. Liaison: FEMA request. 240 min / 1100 7 Full system evac: 800 patients to ACS (stadium/arena). Injury spike: 20 burns from spot fires. Ash clogs HVAC. Resource depletion; staff fatigue. Safety: PPE mandates. Finance: Cost tracking. Full IAP-2. 300 min / 1130 8 Fire 20% contained; rain chance 20%. Repopulation starts for Clinic C. Cyber rumor: "Hospital hacked." Demob planning; mental health surge. Planning: Demob checklist. PIO: Rumor control. 360 min / 1200 9 (Hotwash Trigger) All clear; after-action discussion. Simulated stats: 2% patient loss if poor decisions. N/A Debrief. Variant Injects (Swap for Customization):
- Mass Casualty: +50 burn victims at Inject 7.
- Rural Twist: No helipad; use school buses for low-acuity.
- Night Fire: Inject 5: Darkness reduces visibility 50%.
After-Action Review (AAR) Template
Conduct immediately post-exercise (60-90 min). Use this structure; capture on flipchart/shared doc.
1. What Was Planned?
- List objectives/exercise goals.
2. What Actually Occurred?
- Timeline recap: Wins (e.g., "Evac IAP issued in 45 min").
- Simulated outcomes (e.g., "Patient accountability: 98%").
3. What Went Well and Why?
- Discussion prompts:
Strength Example Sustain Comms PIO social posts reduced calls 40%. Train all staff. Logistics Generator fuel pre-staged. Annual drills.
4. What Needs Improvement and Why?
Gap Root Cause Improve By EHR Downtime No backups tested. Q2: Redundant servers. | Slow Triage | Unclear priorities. | Revise evac playbook. |5. Lessons Learned and Recommendations
- Top 3 actionable items with owners/deadlines (e.g., "Logistics: Stock 72hr O2 – Due Q1").
- Rate objectives (Met/Partially/Not Met).
6. Next Steps
- Schedule full-scale exercise.
- Update plans (HICS, COOP).
AAR Output: Distribute report within 72 hours.
Facilitator Notes
- Safety: Emphasize this is discussion-only; no real actions.
- Scalability: For smaller groups, combine roles.
- Resources: FEMA TTX Guide, NWCG Wildfire Playbooks, ASHE Healthcare Evac Tools.
- Debrief: End positive; recognize efforts.
This library can be expanded with local data (e.g., real facility maps). Repeat quarterly for proficiency. For customizations, provide your health system's details.
Other models, same or similar prompt
Responses were produced in different, uncontrolled contexts (system prompts, settings, prior turns). This is not a benchmark.