Risk Assessment Document
Corrective & Preventive Action (CAPA) – Installation of Chilled-Water Temperature & Flow Interlocks on Blister-Pack Machine
1. Purpose
To evaluate and document the product‐quality, patient-safety, compliance and business risks linked to:
- The current non-conformity (improper blister sealing & crushed tablets caused by loss of chilled-water supply to the Cooling-Sealing Roller, “CSR”).
- The proposed CAPA (automatic temperature & flow interlocks that shut the blister machine down and alarm when chilled-water conditions are out of specification).
2. Scope
• Blister-packaging lines handling finished solid-dose products at Site XXX.
• From chilled-water supply to final primary packaging.
• Covers pre-CAPA (existing state) and post-CAPA (residual) risk.
3. Assessment Methodology
Failure Mode & Effects Analysis (FMEA):
Severity (S), Occurrence (O) and Detection (D) are each ranked 1-10 (10 = worst).
Risk Priority Number (RPN) = S × O × D.
Risk acceptance criterion:
• RPN ≤ 40 → Acceptable / Low
• 40 < RPN ≤ 80 → Medium; mitigation recommended
• RPN > 80 → High; mitigation required
Severity table, occurrence table, detection table are provided in Appendix A.
4. Team & Date
| Name | Function | Signature / Date |
|---|
| A. Engineer | Packaging Engineering | |
| B. Quality | QA Validation | |
| C. Production | Blister-Line Supervisor | |
| D. EHS | EHS Specialist | |
| … | … | … |
Assessment date: DD-MMM-YYYY
5. Process Flow Diagram (Simplified)
- Tablet feeding →
- Forming web heating →
- Cooling-Sealing Roller (CSR) with chilled-water loop →
- Blister pocket sealing →
- Vision/inspection →
- Cartoning →
- Palletisation
6. FMEA – Pre-CAPA (“As-Is”)
| # | Process Step | Potential Failure Mode | Potential Effect(s) | Current Control(s) | S | O | D | RPN |
|---|
| 1 | CSR sealing | Interruption or ≥ 8 °C rise in chilled-water temp → CSR overheats | • Forming web sticks to roller → drag & damaged pockets • Tablets crushed or exposed • Sub-potency or contamination • Patient harm, recall | • Manual temp gauge (every 2 h) • Operator visual check every 30 min | 9 | 6 | 7 | 378 |
| 2 | CSR sealing | Operator misses damaged blisters | Same as above | • Off-line in-process inspection 1 h | 9 | 5 | 6 | 270 |
Both RPN > 80 → High Risk → Immediate action required.
7. CAPA Description
Install:
- Chilled-water Temperature Interlock (setpoint e.g., 4–8 °C).
- Chilled-water Flow Interlock (min. 15 L min⁻¹).
Logic: Deviation beyond limits triggers automatic machine stop + audio/visual alarm; event recorded in SCADA.
Validation: IQ/OQ/PQ of sensors & PLC logic; alarm challenge tests each batch.
8. FMEA – Post-CAPA (“To-Be / Residual”)
| # | Process Step | New/Modified Controls | S | O | D | New RPN |
|---|
| 1 | CSR sealing | Automatic temp & flow interlocks; alarm; batch release linked to alarm log review | 9 | 2 | 2 | 36 (Low) |
| 2 | CSR sealing | Same as above; vision system rejection remains | 9 | 2 | 3 | 54 (Medium–Low, acceptable per site policy) |
Note: Severity remains 9 (patient safety) but Occurrence & Detection rankings improve markedly.
9. Residual Risk Statement
After implementation and successful qualification of the interlocks, the RPN for critical failure modes falls below the corporate action limit (≤ 80). Residual risk is judged acceptable provided:
• Preventive Maintenance (PM) on sensors every 6 months.
• Alarm challenge test at each batch start-up.
• Trending of alarm frequency (Quality Metrics dashboard).
10. Action Plan & Responsibilities
| Task | Owner | Target Date | Status/Comments |
|---|
| URS & Functional Spec for sensors/PLC | Eng. | DD-MM-YY | |
| Design review & HAZOP | Eng./QA | | |
| Procurement & installation | Eng. | | |
| IQ/OQ protocols & execution | QA Validation | | |
| SOP revision (Line Clearance & Alarms) | QA Doc. Control | | |
| Training of operators & maintenance | Production | | |
| Effectiveness check (next 3 lots) | QA Ops | | |
| Close CAPA in TrackWise | CAPA Owner | | |
11. Monitoring & Effectiveness Criteria
• Zero critical complaints (crushed/poorly sealed blisters) in next rolling 12 months.
• Alarm trend: < 1 nuisance trip / 10 batches.
• Quarterly review of CSR temperature/flow data by Engineering & QA.
If above thresholds are exceeded → escalate to CAPA Review Board.
12. Approval
| Function | Name | Signature | Date |
|---|
| Quality Assurance | | | |
| Engineering | | | |
| Production | | | |
Appendix A – Ranking Scales
Severity (S)
10 = Regulatory recall / life-threatening; 9 = Serious injury; 8 = Dose failure requiring medical attention; … 1 = No effect.
Occurrence (O)
10 = > 1 in 10 batches; 8 = 1 in 50; 6 = 1 in 200; 4 = 1 in 2 000; 2 = 1 in 20 000; 1 = 1 in 200 000.
Detection (D)
10 = Impossible to detect before patient use; 7 = Likely missed in routine in-process checks; 4 = Automatic online detection with manual review; 2 = Interlocked shutdown; 1 = Error proofed (Poka-yoke).