combine this into one clear statement: 4. After all lockout devices are verified,…

  1. User

    combine this into one clear statement:

    1. After all lockout devices are verified, attempt to start the cooling tower. The cooling tower should NOT start. After VERIFICATION, move to next step.

    2. Verify the water tower is OFF, no pumps should be running (audible), no water should be flowing (visible and audible). Touch PLC screen or try power switch (temporarily remove LOTO device for test) to confirm no operation starts. After VERIFICATION, move to next step.

  2. Assistant

    Here are a few options for combining these statements, depending on the desired level of detail and emphasis on sequence:

    Option 1 (Focus on sequential steps):

    First, verify the cooling tower is OFF by confirming no pumps are running (audible) and no water is flowing (visible/audible). Attempt to start the tower via normal controls (PLC screen or power switch - temporarily removing LOTO device for this initial test if already applied) to confirm no operation starts. After all lockout devices have been applied and verified, attempt to start the cooling tower again to confirm it positively does NOT start, verifying the effectiveness of the lockout. Proceed only after these verifications are complete.

    Option 2 (More concise):

    Verify the cooling tower is OFF, ensuring no pumps are running or water is flowing. Confirm normal operation cannot be started by attempting to use controls (PLC/power switch - temporarily removing LOTO for this initial test if necessary). After verifying all lockout devices are in place and effective, attempt to start the tower one final time to confirm it absolutely does NOT start.

    Choose the option that best fits the overall style and context of your document. Option 1 is more explicit about the two distinct verification stages. Option 2 is slightly shorter.

  3. User

    does this sound cluncky: COOLING WATER ON/OFF button on E-02 Control Panel PLC touch screen located in Building 1 Boiler Room.

  4. Assistant

    Yes, it does sound a bit clunky.

    Here's why:

    1. "button on... PLC touch screen": A "button" on a physical control panel usually implies a physical push-button. A "button" on a touch screen is a virtual element of the interface. While understandable, saying "button on... touch screen" is slightly awkward. "Control," "option," or "virtual button" on the touch screen is more precise.
    2. Stringing descriptors: Listing "E-02 Control Panel," "PLC touch screen," and "located in Building 1 Boiler Room" all as modifiers in one long noun phrase feels a bit heavy.

    Here are some smoother ways to phrase it, depending on context:

    Option 1 (Describing where the control is):

    The COOLING WATER ON/OFF control is on the PLC touch screen of the E-02 Control Panel, located in the Building 1 Boiler Room.

    Option 2 (Focusing on the action/interface):

    Use the COOLING WATER ON/OFF option on the PLC touch screen of the E-02 Control Panel in Building 1 Boiler Room.

    Option 3 (Slightly breaking down the location):

    On the E-02 Control Panel in the Building 1 Boiler Room, use the PLC touch screen to find the COOLING WATER ON/OFF control.

    Any of these options improve the flow and clarity compared to the original phrasing.

  5. User

    I need it to be for "Energy Isolation Point/Location"

  6. Assistant

    Okay, for an "Energy Isolation Point/Location" description in a procedure like LOTO, you need to be very clear, specific, and structured. The original phrasing is indeed clunky and not ideal for this purpose.

    Here are several options, focusing on clarity and the standard information needed for an isolation point:

    Option 1 (Standard & Clear):

    E-02 Control Panel (PLC Touch Screen) - Building 1 Boiler Room

    • Why it works: It identifies the specific panel (the physical object where you interact), specifies the interface type (PLC Touch Screen, also often called HMI), and gives the exact location. You would typically find the "Cooling Water" system listed elsewhere in the procedure, implying you need to find the relevant control on this touch screen.

    Option 2 (More Detail, if multiple systems on panel):

    E-02 Control Panel (PLC Touch Screen) - Cooling Water Control - Building 1 Boiler Room

    • Why it works: Adds the specific function you'll use on that touch screen, which is helpful if the panel controls multiple different pieces of equipment.

    Option 3 (Location First):

    Building 1 Boiler Room - E-02 Control Panel (PLC Touch Screen)

    • Why it works: Starts with the room, which can be helpful for navigation, then specifies the panel.

    Option 4 (Very Concise):

    B1 Boiler Room - E-02 PLC Panel

    • Why it works: Uses common abbreviations (B1 for Building 1), simplifies "Control Panel" to "Panel", and implies it's the one with the PLC. Assumes the worker knows it has a touch screen and they need to find the Cooling Water control. Use this if space is limited and workers are familiar with the location/panels.

    Which one is best?

    • For most standard LOTO procedures, Option 1 is a great balance of detail and conciseness.
    • If the E-02 panel controls many things and you need to be specific about which control isolates the cooling water, Option 2 is better.
    • If the procedure organizes points by room, Option 3 fits well.
    • If you use abbreviations and have experienced personnel, Option 4 is efficient.

    Choose the option that best fits the overall format and level of detail of your LOTO procedures or safety documentation. Avoid the "button on... touch screen" phrasing. Focus on the physical panel and its location.

  7. User

    and then how would the Isolation Method and Lockout device look?

  8. Assistant

    Okay, this is a crucial distinction for LOTO procedures.

    You typically do not list the PLC touch screen itself as the Isolation Point or the Isolation Method for LOTO.

    Here's why:

    1. Not a True Isolation: A touch screen control only sends a signal to the PLC. The PLC then controls a relay or contactor that actually interrupts the power. This is a control function, not a physical break in the energy source. A touch screen can be easily reactivated, bypassed, or a PLC program could be changed.
    2. LOTO Requires Positive Isolation: LOTO requires a physical device that positively prevents the energy from being restored. This is usually an electrical disconnect switch, circuit breaker, valve, etc., that is designed to be locked in the "OFF" or "Closed" position.

    Therefore, the PLC touch screen is usually part of the Shutdown step and the Verification step in a LOTO procedure, but not the Isolation Point where the lock is applied.

    The actual Isolation Point for the Cooling Tower's energy (electrical power for pumps/fans) would be a physical electrical disconnect or breaker located elsewhere.

    Here's how the Isolation Point, Isolation Method, and Lockout Device would look for the actual energy source controlled by that PLC touch screen:

    Assuming the Isolation Point is the Main Electrical Disconnect:

    • Energy Isolation Point/Location: Cooling Tower Main Electrical Disconnect (Specify location, e.g., "Located on the south wall of the Building 1 Boiler Room," or "Adjacent to Cooling Tower Base")
    • Isolation Method: De-energize electrical power by placing the disconnect switch in the "OFF" position.
    • Lockout Device: Standard Electrical Disconnect Lockout Device (plus personal lock and tag)

    Assuming the Isolation Point is a Circuit Breaker in a Panel:

    • Energy Isolation Point/Location: Electrical Panel CR-03, Breaker #15 (Cooling Tower Pumps) - (Specify panel location, e.g., "Located in Electrical Room B1-A")
    • Isolation Method: Open circuit breaker #15.
    • Lockout Device: Circuit Breaker Lockout Device (specific type, e.g., "Clamp-on Breaker Lockout"), plus personal lock and tag.

    In summary:

    • The PLC touch screen (E-02 Control Panel) is where you might perform the initial shutdown of the equipment.
    • The Verification Step involves attempting to start the equipment using the PLC touch screen after LOTO has been applied at the actual isolation point, confirming it cannot start.
    • The Isolation Method and Lockout Device descriptions apply to the physical energy isolation device (like a disconnect or breaker), not the control screen.
  9. User

    so you would put this in the testing a verification of lockout/try section and not in the table of isolation steps

  10. Assistant

    Exactly! You've got it right.

    The action of attempting to start the equipment using the PLC touch screen (or any other normal control) is part of the Testing and Verification of Lockout/Try Section.

    Here's the breakdown:

    1. Isolation Steps Table (or similar section):

      • This table/section lists the physical energy isolation points.
      • It identifies what specific device needs to be manipulated to physically isolate the energy (e.g., "Cooling Tower Main Electrical Disconnect," "Pump Motor Breaker #7," "Water Supply Valve").
      • It identifies where that device is located.
      • It specifies the isolation method (e.g., "Open Disconnect Switch," "Turn Valve to Closed," "Open Breaker").
      • It specifies the lockout device to be applied there (e.g., "Electrical Disconnect Lockout," "Valve Cover Lockout," "Breaker Lockout").
      • The PLC touch screen is NOT listed here, because it's a control interface, not the isolation device itself.
    2. Testing and Verification of Lockout / Try Section:

      • This section details the steps to confirm that the isolation and lockout/tagout have been effective.
      • This is where you would instruct the worker to "Attempt to start the equipment using its normal operating controls (e.g., press the START button on the E-02 Control Panel PLC touch screen)."
      • The expected outcome is explicitly stated: "The equipment (Cooling Tower) should NOT start."
      • This step proves that the energy isolation performed at the physical isolation point is successful.

    So, your original points 1 and 4 describe actions that belong in the "Testing and Verification" section of the procedure, using the PLC touch screen as the means to attempt the start, thereby verifying the effectiveness of the LOTO applied elsewhere.

  11. User

    so something like this: 1. Before working on E-02 Cooling Tower, ENSURE that manufacturing equipment in Building 1 is not operating or dependent on the cooling water system during the lockout. 2. Verify the cooling tower is OFF by confirming no pumps are running (audible), no water is flowing (visible and audible). Try to turn on cooling tower from the PLC screen - the cooling tower should NOT start. Return PLC to OFF. After complete verification, move to the next step.

  12. Assistant

    Okay, let's analyze that revised sequence.

    1. Before working on E-02 Cooling Tower, ENSURE that manufacturing equipment in Building 1 is not operating or dependent on the cooling water system during the lockout.

      • Analysis: This is a very good and important step. It fits perfectly into the Preparation or Planning phase of a LOTO procedure. It ensures you don't negatively impact other operations or create hazards elsewhere by taking the cooling tower offline. Its placement before the physical isolation steps is correct.
    2. Verify the cooling tower is OFF by confirming no pumps are running (audible), no water is flowing (visible and audible). Try to turn on cooling tower from the PLC screen - the cooling tower should NOT start. Return PLC to OFF. After complete verification, move to the next step.

      • Analysis: This step combines two different stages and places the crucial "Try/Verify" step incorrectly for standard LOTO.
        • "Verify the cooling tower is OFF..." - This is part of the Shutdown or initial verification that the equipment is in a stopped state. This is correct.
        • "Try to turn on cooling tower from the PLC screen - the cooling tower should NOT start." - This is the Testing and Verification of Lockout / Try step.
        • The Problem: The "Try/Verify" step MUST be done after you have physically isolated the energy source(s) and applied your personal lockout/tagout device(s). Doing it before physical isolation only confirms the machine is currently off, perhaps by the control system, but doesn't verify that your LOTO measures are effective at preventing it from starting.

    So, while the individual actions are correct (checking dependencies, verifying it's off, trying the controls), their sequence in step 2 is incorrect for a standard LOTO procedure.

    How it should typically flow:

    1. (Preparation/Planning): Check dependencies (Your Step 1).
    2. (Notification): Inform affected personnel.
    3. (Shutdown): Use normal controls (like the PLC screen) to shut down the equipment. Verify it is in a stopped state (Your initial part of Step 2: check for running pumps, water flow). You might even verify here that the control system shows it as off.
    4. (Isolation): Go to the physical energy isolation point(s) (e.g., main electrical disconnect, pump breaker) and physically isolate the energy.
    5. (Lockout/Tagout): Apply your personal LOTO device(s) to the isolation point(s).
    6. (Stored Energy): Address any stored energy.
    7. (Testing and Verification / Try): Now, go back to the normal operating controls (the PLC screen) and attempt to start the equipment.
    8. (Verification Outcome): The equipment (Cooling Tower) should NOT start. This verifies that your LOTO applied in step 5 is effective.
    9. (Return Controls to Normal): Return the controls (PLC screen) to the "OFF" or "STOP" position after the failed start attempt. (This is where your "Return PLC to OFF" instruction fits).
    10. (Proceed with Work): The area is now safe for authorized personnel to work.

    Revised Step 2 (for the Shutdown/Initial Verification phase):

    1. Verify the cooling tower is OFF by confirming no pumps are running (audible), and no water is flowing (visible and audible). Confirm the PLC screen indicates the cooling tower and associated pumps are in the OFF/STOP status. After complete initial verification, move to the next step.

    Then, later in the procedure, after the Isolation and Lockout steps, you would have:

    Testing and Verification of Lockout:

    1. Attempt to start the cooling tower using the normal operating controls on the E-02 Control Panel PLC touch screen located in the Building 1 Boiler Room.
    2. VERIFY the cooling tower does NOT start.
    3. Return the controls on the PLC screen to the OFF/STOP position.
    4. The lockout is verified. Proceed with maintenance/service.

    Conclusion: Your Step 1 is good and correctly placed. Your Step 2 combines actions that should be in different parts of the LOTO procedure, and crucially, misplaces the "Try/Verify" step. That vital test belongs after the physical lockout devices are applied, not before.

  13. User

    here is there entire try section so far:

    1. Before working on E-02 Cooling Tower, ENSURE that manufacturing equipment in Building 1 is not operating or dependent on the cooling water system during the lockout.
    2. Verify the cooling tower is OFF by confirming no pumps are running (audible), no water is flowing (visible and audible). Try to turn on cooling tower from the PLC screen - the cooling tower should NOT start. Return PLC to OFF. After complete verification, move to the next step.
    3. Using the Left-Hand Rule, try to turn on each disconnect. No motion or energization should be possible. Pull firmly on lock/hasp to confirm each lock cannot be opened.
    4. Try to open City Water Supply Valve. Valve should not open. Pull firmly on lock/hasp to confirm lock cannot be opened. Verify that water flow to the cooling tower has stopped. After VERIFICATION, move to next step.
    5. If the job DOES NOT involve any exposed wiring and VERIFICATION of LOCKOUT/TRY is completed, proceed to perform the job. If the job involves any exposed wiring move to next step.
    6. If exposed wiring is involved or if electrical components are part of the job, use a voltage measurement device to test for ZERO ENERGY. VERIFY that there is no electrical voltage flowing to or from the equipment. After VERIFICATION, move to next step.
    7. After ALL applicable TESTING steps have been VERIFIED (all energy sources isolated), work may proceed.
  14. Assistant

    Okay, let's break down this "try section".

    Overall, it's a decent start for a verification process, but the sequence and phrasing of some steps need adjustment to align with standard LOTO procedures and ensure clarity and safety.

    Here's a step-by-step analysis:

    1. Before working on E-02 Cooling Tower, ENSURE that manufacturing equipment in Building 1 is not operating or dependent on the cooling water system during the lockout.

      • Analysis: This is an excellent and crucial step, but it belongs in the Preparation/Planning phase of the LOTO procedure, before any shutdown or verification testing begins. It's about coordinating with others and assessing the impact before you isolate the equipment. It's not part of the "Try/Verification" after LOTO is applied.
      • Recommendation: Move this step to an earlier section of the procedure (e.g., "Preparation," "Planning," or "Coordination").
    2. Verify the cooling tower is OFF by confirming no pumps are running (audible), no water is flowing (visible and audible). Try to turn on cooling tower from the PLC screen - the cooling tower should NOT start. Return PLC to OFF. After complete verification, move to the next step.

      • Analysis: This step incorrectly combines the Shutdown/Initial Verification part with the Testing & Verification of Lockout (The "Try").
        • The first part ("Verify the cooling tower is OFF...") is part of the initial shutdown process, performed before applying locks.
        • The second part ("Try to turn on cooling tower from the PLC screen...") is the crucial "Try" step that verifies the effectiveness of the LOTO. This step must be done after all physical energy isolation points have been isolated and locked out (Steps 3 & 4 in your list, and any others) to confirm that your locks are preventing operation.
      • Problem: As written, doing the PLC "Try" before checking the disconnects and valves (Steps 3 & 4) defeats the purpose of verifying your lockout. It only verifies it was off before you applied locks.
      • Recommendation:
        • Keep the first part ("Verify the cooling tower is OFF...") in an earlier "Shutdown" or "Initial Verification" step.
        • Move the "Try to turn on cooling tower from the PLC screen..." part later in this section, after you've physically verified the isolation points and their locks (Steps 3 & 4 below).
        • Rephrase the "Try" step to clearly state you are attempting to start it via normal controls to verify the lockout is effective.
    3. Using the Left-Hand Rule, try to turn on each disconnect. No motion or energization should be possible. Pull firmly on lock/hasp to confirm each lock cannot be opened.

      • Analysis: This is a standard and correct Testing and Verification step for electrical isolation points after LOTO has been applied. It directly tests the physical isolation device and the lock. Using the Left-Hand Rule for electrical checks is good practice.
      • Recommendation: Keep this step.
    4. Try to open City Water Supply Valve. Valve should not open. Pull firmly on lock/hasp to confirm lock cannot be opened. Verify that water flow to the cooling tower has stopped. After VERIFICATION, move to next step.

      • Analysis: This is a standard and correct Testing and Verification step for fluid/pressure isolation points (a valve) after LOTO has been applied. It directly tests the physical isolation device and the lock, and verifies the result (no flow).
      • Recommendation: Keep this step.
    5. If the job DOES NOT involve any exposed wiring and VERIFICATION of LOCKOUT/TRY is completed, proceed to perform the job. If the job involves any exposed wiring move to next step.

      • Analysis: This is a correct decision point within the verification process, leading to the zero-energy test if required.
      • Recommendation: Keep this step.
    6. If exposed wiring is involved or if electrical components are part of the job, use a voltage measurement device to test for ZERO ENERGY. VERIFY that there is no electrical voltage flowing to or from the equipment. After VERIFICATION, move to next step.

      • Analysis: This is a mandatory and correct Zero Energy Test step when working with potentially exposed electrical conductors after isolation and lockout.
      • Recommendation: Keep this step.
    7. After ALL applicable TESTING steps have been VERIFIED (all energy sources isolated), work may proceed.

      • Analysis: This is a correct concluding statement for the verification phase.
      • Recommendation: Keep this step.

    Proposed Reorganization and Rewording for the "Testing and Verification of Lockout" Section:

    This assumes the initial shutdown and verification of the equipment being stopped have already occurred before this section.

    TESTING AND VERIFICATION OF LOCKOUT

    1. Using the Left-Hand Rule, verify each electrical disconnect used for isolation is in the OFF position. Attempt to turn on each disconnect - no motion or energization should be possible. Pull firmly on each lock and hasp to confirm they cannot be opened.
    2. Verify each valve used for isolation (e.g., City Water Supply Valve) is in the closed position. Attempt to open each valve - it should not open. Pull firmly on each lock and hasp to confirm they cannot be opened. Verify that associated water/fluid flow to the cooling tower has stopped.
    3. Attempt to start the Cooling Tower using the normal operating controls (e.g., press the START button on the E-02 Control Panel PLC touch screen located in the Building 1 Boiler Room).
    4. VERIFY the Cooling Tower DOES NOT start. This confirms the effectiveness of the applied lockout.
    5. Return the controls on the PLC screen to the OFF/STOP position.
    6. If the job DOES NOT involve any exposed wiring or electrical components, the lockout/try verification is complete. Proceed to perform the job.
    7. If the job involves any exposed wiring or electrical components, proceed to the next step for Zero Energy Testing.
    8. If required due to exposed wiring or electrical components, use a properly tested voltage measurement device to test all potentially exposed conductors and connection points for ZERO ENERGY. VERIFY that there is no electrical voltage present.
    9. After ALL applicable TESTING and VERIFICATION steps have been successfully completed (all energy sources isolated and verified), work may safely proceed.

    Key Changes and Why:

    • Step 1 (original) is removed as it's a planning step.
    • Step 2 (original) is split. The initial "Verify OFF" belongs earlier. The "Try PLC" is moved to Step 3 after the physical checks (Steps 1 & 2 in the revised list).
    • The sequence now flows logically: Verify physical isolation points are locked -> Attempt to start using controls (should fail) -> Check for zero voltage if needed -> Confirm completion.
    • Phrasing is made clearer ("Attempt to start... VERIFY does NOT start").
    • The "Left-Hand Rule" is specifically mentioned for electrical checks.
    • Step 5 is rephrased slightly for better flow within the sequence.

    This revised structure makes it clear what is being tested at each stage and ensures the crucial "Try" step using the control system is performed after the physical energy sources have been isolated and locked out, confirming the LOTO's effectiveness.

  15. User

    but i was told by a mechanic they want it to be a habit to turn off the tower first

  16. Assistant

    Okay, that makes sense. The mechanic wants to ensure the habit of using the standard controls (the PLC) to turn the equipment OFF is the first step in preparing for lockout, immediately after checking system dependencies. This is a valid and important part of the Shutdown phase in LOTO.

    The confusion arises because the same action (trying to start the system via the PLC) is used for two different purposes at different points in the LOTO process:

    1. Initial Shutdown (using controls to turn OFF): This is the mechanic's desired habit. You use the controls to bring the equipment to a stopped state before you physically isolate energy.
    2. Verification/Try (attempting to start using controls after LOTO): This is the safety test to confirm your physical isolation and locks are effective.

    You are correct that the PLC "Try" step from your original Step 2 should be in the Testing and Verification of Lockout section. However, the mechanic's request highlights that the initial action of using the PLC to command the system OFF needs to be documented earlier.

    Here's how you can structure the LOTO procedure steps to accommodate this, maintaining the mechanic's desired habit while adhering to LOTO safety principles:

    Revised LOTO Procedure Flow (incorporating the mechanic's point):

    Let's assume the procedure has standard sections like:

    • Preparation & Planning
    • Notification
    • Shutdown
    • Isolation
    • Lockout/Tagout
    • Testing & Verification of Lockout (The "Try")
    • Performing Work
    • Restoration

    Here's where your points fit:

    SECTION: Preparation & Planning

    • (Include your original Step 1 here): Before working on E-02 Cooling Tower, ENSURE that manufacturing equipment in Building 1 is not operating or dependent on the cooling water system during the lockout.

    SECTION: Shutdown

    • 1. Use the normal operating controls to stop the Cooling Tower system.
      • Locate the E-02 Control Panel PLC touch screen in the Building 1 Boiler Room.
      • Press the appropriate button or control on the touch screen to command the Cooling Tower and associated pumps to stop.
      • Verify the touch screen indicates the system is in the OFF or STOP status.
    • 2. Verify the Cooling Tower is OFF.
      • Visually and audibly confirm no pumps are running.
      • Visually and audibly confirm no water is flowing.

    (After Shutdown, the procedure would then cover physical Isolation and Lockout/Tagout at the actual energy sources - disconnects, valves, etc.)

    SECTION: Testing & Verification of Lockout (The "Try")

    • 1. Attempt to Start Using Controls (The "Try"):
      • Return to the E-02 Control Panel PLC touch screen in the Building 1 Boiler Room.
      • Attempt to start the Cooling Tower system by pressing the appropriate button or control on the touch screen.
    • 2. VERIFY the Cooling Tower DOES NOT start. This confirms that the physical isolation and lockout devices are effective.
    • 3. Return Controls to OFF:
      • Return the button or control on the PLC touch screen back to the OFF or STOP position.
    • 4. Verify Physical Isolation Points:
      • Using the Left-Hand Rule, verify each electrical disconnect used for isolation is in the OFF position. Attempt to turn on each disconnect - no motion or energization should be possible. Pull firmly on each lock and hasp to confirm they cannot be opened. (Your original Step 3)
      • Verify each valve used for isolation (e.g., City Water Supply Valve) is in the closed position. Attempt to open each valve - it should not open. Pull firmly on each lock and hasp to confirm they cannot be opened. Verify that associated water/fluid flow to the cooling tower has stopped. (Your original Step 4)
    • 5. Assess Need for Zero Energy Test:
      • If the job DOES NOT involve any exposed wiring or electrical components, the lockout/try verification is complete.
      • If the job involves any exposed wiring or electrical components, proceed to the Zero Energy Test step. (Your original Step 5 adapted)
    • 6. Perform Zero Energy Test (If required):
      • If required, use a properly tested voltage measurement device to test all potentially exposed conductors and connection points for ZERO ENERGY. VERIFY that there is no electrical voltage present. (Your original Step 6 adapted)
    • 7. Final Verification Complete:
      • After ALL applicable TESTING and VERIFICATION steps have been successfully completed (all energy sources isolated and verified), work may safely proceed. (Your original Step 7 adapted)

    Summary for the Mechanic:

    You can explain to the mechanic: "Yes, using the PLC screen to shut it off first is the correct way to start the LOTO process – that's the 'Shutdown' step. Then, after we go and physically lock out the power at the disconnects and valves, we come back to the PLC screen and try to start it again. That second 'try' is the safety check to prove our physical locks worked. We use the screen for two different purposes at two different times."

    This structure incorporates the mechanic's good habit (using the PLC to stop the equipment initially) into the Shutdown phase and correctly places the crucial "Try" step using the PLC (to verify the lockout) into the Testing & Verification phase, after the physical isolation and lockout.

  17. User

    the issue is the template does not acutally havea shutdown section

  18. Assistant

    Okay, this clarifies the situation. If your template has a section titled "Try" and these are the steps within it, and there's no separate "Shutdown" section beforehand, then the structure is a bit non-standard, but we can work with it.

    The key is still to perform the "try" (attempting to start using controls) after the physical energy isolation and lockout devices have been applied.

    Here's how we can structure those steps within your "Try" section, addressing the mechanic's point about using the PLC initially, while maintaining the correct LOTO sequence:

    TESTING AND VERIFICATION OF LOCKOUT (The "Try")

    1. (Pre-work Check/Dependency - Note: This step is typically performed during Planning/Preparation, before starting the LOTO process, but is included here as per your template.): Before working on E-02 Cooling Tower, ENSURE that manufacturing equipment in Building 1 is not operating or dependent on the cooling water system during the lockout.
    2. (Initial Shutdown and Verification of STOPPED state): Use the normal operating controls on the E-02 Control Panel PLC touch screen located in the Building 1 Boiler Room to command the Cooling Tower and associated pumps OFF. Verify the Cooling Tower is in a stopped state by confirming no pumps are running (audible), and no water is flowing (visible and audible). Confirm the PLC screen indicates the system is OFF/STOP.
      • (Note: Physical Isolation and Lockout steps at the actual energy sources - electrical disconnects, valves, etc. - MUST be completed after this step and before proceeding with the verification steps below. These steps should ideally be detailed elsewhere in the procedure, e.g., in an "Isolation" section.)
    3. (Verify Physical Electrical Isolation & Lockout): Using the Left-Hand Rule, verify each electrical disconnect used for isolation is in the OFF position. Attempt to turn on each disconnect - no motion or energization should be possible. Pull firmly on each lock and hasp to confirm they cannot be opened.
    4. (Verify Physical Non-Electrical Isolation & Lockout): Verify each valve used for isolation (e.g., City Water Supply Valve) is in the closed position. Attempt to open each valve - it should not open. Pull firmly on each lock and hasp to confirm they cannot be opened. Verify that associated water/fluid flow to the cooling tower has stopped.
    5. (Attempt to Start Using Controls - The Main "Try"): Return to the normal operating controls (the E-02 Control Panel PLC touch screen). Attempt to start the Cooling Tower system by pressing the appropriate button or control.
    6. (VERIFY Lockout Effectiveness): VERIFY the Cooling Tower DOES NOT start. This confirms that the physical isolation and lockout devices are effective.
    7. (Return Controls to OFF): Return the button or control on the PLC touch screen back to the OFF or STOP position after the failed start attempt.
    8. (Assess Need for Zero Energy Test): If the job DOES NOT involve any exposed wiring or electrical components, the lockout/try verification is complete. Proceed to perform the job.
    9. (Perform Zero Energy Test - If required): If the job involves exposed wiring or electrical components, use a properly tested voltage measurement device to test all potentially exposed conductors and connection points for ZERO ENERGY. VERIFY that there is no electrical voltage present.
    10. (Final Verification Complete): After ALL applicable TESTING and VERIFICATION steps have been successfully completed (all energy sources isolated and verified), work may safely proceed.

    Explanation for the Mechanic (and anyone using this procedure):

    • Step 2 fulfills the mechanic's request to start by turning the equipment OFF using the normal controls (the PLC screen). This ensures it's stopped initially.
    • The crucial difference for LOTO is that the attempt to start it again (Step 5) happens after all the physical disconnects and valves have been isolated and locked out (Steps 3 & 4).
    • This sequence verifies two things:
      • That the equipment is indeed stopped initially (Step 2).
      • That the locks you applied are effective at preventing it from being restarted via its normal controls (Steps 3-7).

    This revised structure within your "Try" section incorporates all your original points, satisfies the mechanic's habit, and puts the critical "Try" step (verifying the lockout) in the correct sequence after physical isolation and lockout have been applied and checked. Remember to emphasize that the physical isolation and lockout steps happen between Step 2 and Step 3 in this sequence, even if not explicitly detailed in this specific list of "Try" steps.

  19. User

    so i can add maybe a shutdown step in the header

  20. Assistant

    That's a good idea given the template's constraints. Since your template forces the "Shutdown" and "Verification of Lockout" into one section, adding a label or clear first step indicating the initial shutdown makes the sequence much clearer and respects the mechanic's point about the habit.

    Here are a few ways you could implement adding a "shutdown step" concept, either in the header or as the very first step within that section:

    Option 1: Use a Clear First Step (Most Recommended within the constraint)

    This makes the initial shutdown action the explicit starting point of this combined section.

    TESTING AND VERIFICATION OF LOCKOUT (The "Try")

    1. (Initial System Shutdown): Before proceeding with isolation, use the normal operating controls on the E-02 Control Panel PLC touch screen located in the Building 1 Boiler Room to command the Cooling Tower and associated pumps OFF. Verify the Cooling Tower system indicates OFF/STOP status on the screen.
    2. (Initial Verification of Stopped State): Visually and audibly verify the Cooling Tower is OFF by confirming no pumps are running and no water is flowing.
      • (Note: Physical Isolation and Lockout steps at the actual energy sources - electrical disconnects, valves, etc. - MUST be completed after these initial shutdown steps and before proceeding with the lockout verification steps below. These physical isolation steps should be detailed elsewhere in the procedure.)
    3. (Verify Physical Electrical Isolation & Lockout): Using the Left-Hand Rule, verify each electrical disconnect used for isolation is in the OFF position. Attempt to turn on each disconnect... (continue with the rest of your original steps 3 through 10 from the previous refined list)...

    Option 2: Add a Subheading within the Section (If template allows)

    If your template allows for subheadings within a section, this provides excellent visual separation.

    TESTING AND VERIFICATION OF LOCKOUT (The "Try")

    Phase 1: Initial Shutdown & Verification

    1. (Pre-work Check/Dependency - Move if this belongs earlier): Before working on E-02 Cooling Tower, ENSURE that manufacturing equipment in Building 1 is not operating or dependent on the cooling water system during the lockout.
    2. Use the normal operating controls on the E-02 Control Panel PLC touch screen located in the Building 1 Boiler Room to command the Cooling Tower and associated pumps OFF. Verify the Cooling Tower system indicates OFF/STOP status on the screen.
    3. Visually and audibly verify the Cooling Tower is OFF by confirming no pumps are running and no water is flowing.

    Phase 2: Physical Isolation, Lockout, and Verification

    • (Note: Physical Isolation and Lockout steps at the actual energy sources must be completed before proceeding with the verification steps below. These should be detailed elsewhere.)
    1. (Verify Physical Electrical Isolation & Lockout): Using the Left-Hand Rule, verify each electrical disconnect used for isolation is in the OFF position. Attempt to turn on each disconnect... (continue with the rest of your steps 3 through 10 from the previous refined list)...

    Option 3: Modify the Section Header (Less ideal for clear sequence)

    You could change the title, but it doesn't guide the user through the steps as effectively as the options above.

    TESTING AND VERIFICATION OF LOCKOUT (Including Initial Shutdown) (The "Try")

    (Then start with the initial shutdown step as #1)

    Which is best?

    • Option 1 (making the initial shutdown step #1) is the most practical way to guide the user if you must put everything in one numbered list within the "Try" section. It clearly starts the sequence with the action the mechanic wants to prioritize.
    • Option 2 (using subheadings) is the clearest way to visually represent the different phases happening within this single section, if your template supports it.
    • Option 3 (modifying the header) is the weakest, as it doesn't clearly delineate the sequence within the section.

    I recommend Option 1 or Option 2. Both effectively incorporate the "shutdown step" idea while maintaining the correct LOTO sequence logic within the constraints of your template. Option 1 is probably the easiest to implement in most basic templates.

  21. User

    well there is a lockout application process. can i add it here?

  22. Assistant

    Yes, you absolutely can and should include the "Lockout Application Process" within this combined section, as it's a crucial step that happens after the initial shutdown and before the "Testing and Verification" (the "Try") makes sense.

    Given your template's structure, this section needs to logically flow through:

    1. Initial Shutdown (Using controls, as the mechanic wants)
    2. Initial Verification (Equipment is off)
    3. Physical Isolation (Operating the disconnects, valves, etc.)
    4. Lockout & Tagout Application (Applying your locks and tags)
    5. Stored Energy (Addressing any stored energy - important if applicable)
    6. Testing & Verification (Attempting start, checking physical locks, zero energy test)

    Here's a revised structure for your "TESTING AND VERIFICATION OF LOCKOUT (The "Try")" section, incorporating the Lockout Application steps logically within the sequence:

    TESTING AND VERIFICATION OF LOCKOUT (The "Try")

    1. (Pre-work Check/Dependency - Place elsewhere if possible): Before working on E-02 Cooling Tower, ENSURE that manufacturing equipment in Building 1 is not operating or dependent on the cooling water system during the lockout.
    2. (Initial System Shutdown): Use the normal operating controls on the E-02 Control Panel PLC touch screen located in the Building 1 Boiler Room to command the Cooling Tower and associated pumps OFF. Verify the Cooling Tower system indicates OFF/STOP status on the screen.
    3. (Initial Verification of Stopped State): Visually and audibly verify the Cooling Tower is OFF by confirming no pumps are running and no water is flowing.
    4. (Physical Energy Isolation): Identify and locate ALL energy isolation points for the E-02 Cooling Tower system. These typically include electrical disconnects for pumps/fans and isolation valves for water supply/return. Operate each isolation device to place it in the safe (isolated) position (e.g., electrical disconnect OFF, valves closed).
      • (Detail specific isolation points and their locations here or refer to an appendix/list if available in the procedure).
    5. (Apply Lockout and Tagout Devices):
      • At each energy isolation point identified in Step 4, apply your personal assigned lock and tag.
      • Ensure the lock securely prevents the isolation device from being operated (e.g., prevents the disconnect handle from being moved, prevents the valve from being opened).
      • Ensure the tag is clearly attached and filled out completely, identifying the person who applied the lock, the date, and the equipment being locked out.
      • (If multiple people are working on the equipment requiring LOTO, ensure a lockout hasp is used where necessary to allow each person to apply their own lock.)
    6. (Address Stored Energy - Add this crucial step if applicable): Check for and safely relieve or control any stored energy (e.g., trapped pressure, residual electrical charge, suspended parts).
      • (Detail specific stored energy checks or relief procedures here).
    7. (Verify Physical Electrical Isolation & Lockout): Using the Left-Hand Rule, verify each electrical disconnect used for isolation is in the OFF position. Attempt to turn on each disconnect - no motion or energization should be possible. Pull firmly on each lock and hasp to confirm they cannot be opened.
    8. (Verify Physical Non-Electrical Isolation & Lockout): Verify each valve used for isolation (e.g., City Water Supply Valve) is in the closed position. Attempt to open each valve - it should not open. Pull firmly on each lock and hasp to confirm they cannot be opened. Verify that associated water/fluid flow to the cooling tower has stopped.
    9. (Attempt to Start Using Controls - The Main "Try"): Return to the normal operating controls (the E-02 Control Panel PLC touch screen). Attempt to start the Cooling Tower system by pressing the appropriate button or control.
    10. (VERIFY Lockout Effectiveness): VERIFY the Cooling Tower DOES NOT start. This confirms that the physical isolation and lockout devices are effective.
    11. (Return Controls to OFF): Return the button or control on the PLC touch screen back to the OFF or STOP position after the failed start attempt.
    12. (Assess Need for Zero Energy Test): If the job DOES NOT involve any exposed wiring or electrical components, the lockout/try verification is complete. Proceed to perform the job.
    13. (Perform Zero Energy Test - If required): If the job involves exposed wiring or electrical components, use a properly tested voltage measurement device to test all potentially exposed conductors and connection points for ZERO ENERGY. VERIFY that there is no electrical voltage present.
    14. (Final Verification Complete): After ALL applicable TESTING and VERIFICATION steps have been successfully completed (all energy sources isolated and verified), work may safely proceed.

    Explanation:

    By adding Steps 4, 5, and potentially 6 (Stored Energy), you create a complete logical flow within this section: you shut down the equipment (2, 3), physically isolate the energy sources (4), apply the locks/tags to those isolation points (5), handle stored energy (6), and then perform the tests (7-13) to verify that those locks (applied in step 5) successfully prevent the equipment from starting.

    This is a much safer and more accurate representation of the LOTO process, even if combined into a single section due to template limitations. Ensure the detail about identifying all energy isolation points is clear, as missing one is a major LOTO failure point.

  23. User

    heres the template:

  24. Assistant

    Okay, let's integrate these steps into a typical LOTO template structure, making logical sections for Shutdown, Isolation, Lockout Application, and Verification ("The Try"). We'll place the steps based on standard LOTO sequence, while accounting for the mechanic's point and your template constraints.

    Since you mentioned the template doesn't have a dedicated "Shutdown" section, the initial shutdown action (using the PLC) needs to fit logically before the physical isolation. It often gets placed at the beginning of the "Energy Isolation Procedure" section, or sometimes just before the "Verification" if those sections are grouped.

    Here's a possible structure, distributing your points across likely template sections:


    LOTO PROCEDURE: E-02 COOLING TOWER

    (Section 1: Preparation & Notification)

    • (Include initial planning steps here)
    • Notify all affected personnel that the E-02 Cooling Tower will be shut down and locked out.
    • Dependency Check: Before working on E-02 Cooling Tower, ENSURE that manufacturing equipment in Building 1 is not operating or dependent on the cooling water system during the lockout. (Your original Step 1)

    (Section 2: Shutdown Procedure) (Note: If your template doesn't have a dedicated Shutdown section, these steps might be the first items listed under "Energy Isolation Procedure")

    • Use the normal operating controls to bring the E-02 Cooling Tower system to a complete stop.
      • Locate the E-02 Control Panel PLC touch screen in the Building 1 Boiler Room.
      • Press the appropriate button or control on the touch screen (e.g., COOLING WATER ON/OFF) to command the Cooling Tower and associated pumps to turn OFF.
    • Verify the Cooling Tower system is in a stopped state.
      • Visually and audibly confirm no pumps are running.
      • Visually and audibly confirm no water is flowing.
      • Confirm the PLC screen indicates the system status is OFF/STOP.

    (Section 3: Energy Isolation Procedure)

    • Identify and locate ALL energy isolation points for the E-02 Cooling Tower system. (Examples may include: Main Electrical Disconnect for Tower Fans/Pumps, Individual Pump Breakers/Disconnects, City Water Supply Valve, Drain Valves, Chemical Feed Pumps, etc.)
      • (List specific isolation points, locations, and device type here. E.g., "Cooling Tower Main Electrical Disconnect, South wall of Building 1 Boiler Room", "Circulating Pump #1 Breaker #15, Electrical Panel CR-03, Room B1-A", "City Water Supply Isolation Valve, Pipe chase near tower base").
    • Operate each identified energy isolation device to physically place it in the safe (isolated) position (e.g., Electrical Disconnects/Breakers in OFF/OPEN position, Valves in CLOSED position).

    (Section 4: Application of Lockout/Tagout Devices) (This is where you'd detail applying the locks)

    • At each energy isolation point identified and placed in the safe position in the previous steps, apply your personal assigned lock and tag.
    • Ensure each lock securely prevents the isolation device from being operated.
    • Ensure each tag is clearly attached and filled out completely with required information (Name, Date, Equipment Locked Out, Reason).
    • (Include procedures for Group Lockout/Hasp use if applicable).

    (Section 5: Stored Energy Control) (Crucial step, may be part of Isolation or Verification)

    • Check for and safely relieve or control any stored energy sources associated with the E-02 Cooling Tower (e.g., release pressure from lines, block suspended parts, discharge capacitors if applicable).
      • (Detail specific steps for addressing known stored energy sources for this equipment).

    (Section 6: Verification of Isolation (The "Try")) (This is where the testing happens)

    • Purpose: To confirm that the equipment is fully de-energized and cannot be operated before beginning work.
    • Verify Physical Electrical Isolation & Lockout:
      • Using the Left-Hand Rule, verify each electrical disconnect/breaker used for isolation is in the OFF/OPEN position.
      • Try to turn on each disconnect/breaker: Attempt to operate each isolation device. No motion or energization should be possible.
      • Pull firmly on each lock and hasp to confirm each lock cannot be opened. (Matches your original Step 3 adapted)
    • Verify Physical Non-Electrical Isolation & Lockout:
      • Verify each valve used for isolation (e.g., City Water Supply Valve) is in the closed position.
      • Try to open each valve: Attempt to operate each isolation valve. Valve should not open.
      • Pull firmly on each lock and hasp to confirm each lock cannot be opened.
      • Verify that associated water/fluid flow to the cooling tower has stopped. (Matches your original Step 4 adapted)
    • Attempt to Start Using Normal Controls (The Main "Try"):
      • Return to the E-02 Control Panel PLC touch screen in the Building 1 Boiler Room.
      • Attempt to start the Cooling Tower system by pressing the appropriate button or control.
    • VERIFY Lockout Effectiveness: VERIFY the Cooling Tower DOES NOT start. This confirms that the physical isolation and lockout devices are effective at preventing unexpected startup via normal controls. (Incorporates your original Step 2's "Try" and Step 4's verification after lockout).
    • Return Controls to OFF: Return the button or control on the PLC touch screen back to the OFF or STOP position after the failed start attempt.
    • Assess Need for Zero Energy Test:
      • If the job DOES NOT involve any exposed wiring and VERIFICATION of LOCKOUT/TRY is completed (Steps above successful), proceed to perform the job.
      • If the job involves any exposed wiring or electrical components move to the next step. (Matches your original Step 5 adapted)
    • Perform Zero Energy Test (If required):
      • If exposed wiring is involved or if electrical components are part of the job, use a properly tested voltage measurement device to test all potentially exposed conductors and connection points for ZERO ENERGY.
      • VERIFY that there is no electrical voltage flowing to or from the equipment. (Matches your original Step 6 adapted)
    • Final Verification Complete:
      • After ALL applicable TESTING steps (physical checks, control test, zero energy test) have been successfully VERIFIED (all energy sources isolated and confirmed de-energized), work may safely proceed. (Matches your original Step 7 adapted)

    (Section 7: Performing Work)

    • (Details about the work to be done)

    (Section 8: Release from Lockout / Return to Service)

    • (Steps for clearing the work area, removing tools, removing LOTO devices in order, notifying personnel, restoring energy, and testing startup)

    This revised structure provides a clear, chronological flow, incorporates all your original points and the mechanic's preference, and places the critical verification steps (especially the "Try" via the PLC) after the physical isolation and lockout have been applied. Remember to fill in the specific details about the isolation points themselves (what they are and exactly where they are located) in the "Energy Isolation Procedure" section.

  25. User
    1. Fill out all necessary permits needed to perform scope of work BEFORE beginning any work. (LOTO, Safe Work are always required. If entire room is not to remain down, a supplemental LOTO procedure may be required and you must engage your supervisor.)
    2. Perform a Pre-Job discussion with team involved with performing the work.
    3. Notify all affected personnel (operators) not directly working on equipment before starting the LOCKOUT PROCEDURE. Be sure to verify process has been shut down following operating procedure. Clarify power will be totally isolated to a de-energized condition and operations will not be available. Document with operator signature on the LOTO permit.
    4. Isolate energy sources at control points and apply Lockout devices, locks, and tags following the written procedure steps below.
    5. All locks applied to isolation points must be personally identified and in the “SECURED” position.
    6. Authorized master lock holder must perform a group LOCKOUT controlling the key(s) for each isolation lock applied.
    7. DO NOT allow work to be performed by anyone who has not applied own personal lock to the group LOCKOUT BOX. where can i add 1 and 2 from the verify section
  26. Assistant

    Okay, let's look at where to best integrate the "verify" steps from your original points 1 and 2 into the provided template outline (steps 1-7).

    Remembering the refined steps from our previous discussion:

    • Original point 1 included: Verify OFF (audible/visible), Try PLC (should NOT start - this was the initial try/verify).
    • Original point 4 (from initial prompt) and later refined: After LOTO, Try PLC (should NOT start - this is the post-LOTO verification).

    Your template list (1-7) outlines key actions and rules within the LOTO process. It doesn't fully detail the verification tests themselves.

    Here's the breakdown of where your "verify" actions fit logically:

    1. Initial Verification (Confirming it's OFF before LOTO): This should happen after notifying affected personnel (Step 3) but before you begin physically isolating energy sources (Step 4). This is the step where you confirm the equipment is in a stopped state via normal means.

    2. Attempting to Start via PLC (Initial Check in original point 1): The idea of trying the PLC before LOTO was flagged as non-standard for verifying LOTO effectiveness. However, if the intent is to confirm that the normal controls can bring the machine to a stop, or that they register as "OFF", this action might be part of the Shutdown or Initial Verification process. Given Step 3 says "verify process has been shut down following operating procedure," this initial PLC check could potentially tie in there, although it's still safer practice to only do the "Try" after LOTO. Let's focus on the core verification first.

    3. Attempting to Start via PLC (After LOTO - the crucial "Try"): This is the vital step that verifies your lockout is effective. This MUST happen after Step 4 (Isolate energy sources and apply LOTO) and its subsequent detailed steps (which aren't fully listed in your 1-7 but are implied by "following the written procedure steps below").

    Adding to your template list (1-7):

    Based on standard LOTO flow and your template's structure, the initial verification of the equipment being OFF fits best after notification (Step 3) and before physical isolation (Step 4). The critical post-LOTO verification steps, including the "Try" using the PLC, belong after Step 4, likely in a section detailing the actual Isolation and Verification process which is implied by "following the written procedure steps below".

    Let's integrate the initial verification into Step 3:

    • Original Step 3: Notify all affected personnel (operators) not directly working on equipment before starting the LOCKOUT PROCEDURE. Be sure to verify process has been shut down following operating procedure. Clarify power will be totally isolated to a de-energized condition and operations will not be available. Document with operator signature on the LOTO permit.

    • Revised Step 3 (adding initial verification details): Notify all affected personnel (operators) not directly working on equipment before starting the LOCKOUT PROCEDURE. Verify the Cooling Tower is OFF by confirming no pumps are running (audible) and no water is flowing (visible and audible). Ensure the process has been shut down following the operating procedure. Clarify power will be totally isolated to a de-energized condition and operations will not be available. Document with operator signature on the LOTO permit.

    Now, regarding the "Try PLC" action:

    • The initial "Try PLC" from your original point 1 (where it shouldn't start before LOTO, implying a control system stop) is less critical and could be confusing. It's better handled by simply verifying the stopped state (as added to Step 3) and ensuring the PLC indicates OFF (which could also be added to Step 3 or a preceding "Shutdown" step if you had one).
    • The post-LOTO "Try PLC" is essential and belongs in the Verification section after the physical isolation and lockout (Steps 4, 5, 6).

    Where to put the main "Try PLC" and other post-LOTO verifications?

    Step 4 says "Isolate energy sources... following the written procedure steps below." This strongly suggests that after your numbered list (1-7), there is a section detailing:

    • Specific Energy Isolation Points (Where are the disconnects, valves?)
    • Specific Isolation Steps (Turn off Disconnect A, close Valve B)
    • Specific Lockout Steps (Apply lock here, here, and here)
    • Specific Stored Energy Steps (Bleed line C)
    • Specific Verification Steps (The "Try" section we discussed earlier)

    Your original points 3, 4, 5, 6, and 7 (from the "verify" section you provided) fit perfectly into that "Specific Verification Steps" section that comes after your list 1-7 and the physical isolation/lockout details. This is where you verify the physical locks (your original points 3, 4), attempt the start via controls (the crucial post-LOTO "Try"), do the zero energy test (your original point 6), and conclude verification (your original points 5, 7).

    Conclusion:

    • Add the initial verification of the stopped state (audible/visible check for pumps/flow) to Step 3.
    • The "Attempt to Start using PLC" (the crucial verification "Try") and all other physical verification checks (checking locks, zero energy test) should go in the detailed Verification of Isolation section that follows your list 1-7, as implied by Step 4.

    This structure keeps the immediate "is it off?" check near the notification and before isolation, while placing the critical "did my lockout work?" check after the lockout application.

  27. User

    no the 1 -7 i gave is the lockout application

  28. Assistant

    Okay, thank you for clarifying that the 1-7 list is the "Lockout Application Process" section itself. This means the steps for physically isolating energy and applying locks are integrated within this list, rather than it just being a lead-in.

    This is a slightly less conventional structure than a standard LOTO procedure (which typically has distinct sections for Shutdown, Isolation, Lockout Application, and Verification), but we can work with it.

    Given this structure, the steps for verifying the equipment is off and performing the crucial "Try" step need to be placed logically within this flow.

    Here's where your "verify" points fit:

    1. Initial Verification (Confirming it's OFF - audible/visible checks): This needs to happen after the notification (Step 3) and after the system has been commanded off, but before you start the physical isolation (part of Step 4). Step 3 already mentions verifying the process has been shut down.

    2. Attempting to Start via PLC (The crucial post-LOTO "Try"): This is the key test of the effectiveness of your lockout. It must happen after you have physically isolated the energy sources and applied your locks (Steps 4 and 5/6/7 regarding application).

    Let's integrate these points into your 1-7 list:

    LOCKOUT APPLICATION PROCESS

    1. Fill out all necessary permits needed to perform scope of work BEFORE beginning any work. (LOTO, Safe Work are always required. If entire room is not to remain down, a supplemental LOTO procedure may be required and you must engage your supervisor.) (This is a planning/preparation step, but listed first in your "Application" section)
    2. Perform a Pre-Job discussion with team involved with performing the work. (Communication/Planning)
    3. Notify all affected personnel (operators) not directly working on equipment before starting the LOCKOUT PROCEDURE. Verify the Cooling Tower system has been commanded to the OFF state following the operating procedure. Visually and audibly verify the Cooling Tower is OFF by confirming no pumps are running and no water is flowing. Clarify power will be totally isolated to a de-energized condition and operations will not be available. Document with operator signature on the LOTO permit. (Notification & Initial Verification of Stopped State)
    4. Identify and locate ALL energy isolation points for the E-02 Cooling Tower system. Operate each control point (isolation device) to place it in the safe (isolated) position (e.g., electrical disconnects OFF, valves closed). Apply Lockout devices, locks, and tags following the written procedure steps below. (Isolation & Lockout Application begins here)
      • (Detail the specific isolation points [disconnects, valves] and how to operate them here or reference a detailed list).
    5. All locks applied to isolation points must be personally identified and in the “SECURED” position. (Detail of Lockout Application)
    6. Authorized master lock holder must perform a group LOCKOUT controlling the key(s) for each isolation lock applied. (Detail of Lockout Application for Group LOTO)
    7. DO NOT allow work to be performed by anyone who has not applied own personal lock to the group LOCKOUT BOX. (Rule for Lockout Application)
    8. (Address Stored Energy - Crucial step, add if applicable): Check for and safely relieve or control any stored energy (e.g., trapped pressure, residual electrical charge). (This step logically comes after physical isolation and lockout, before testing).
      • (Detail specific stored energy checks/relief procedures here).
    9. (Verify Physical Isolation & Lockout): Using the Left-Hand Rule, verify each electrical disconnect/breaker used for isolation is in the OFF position. Attempt to turn on each disconnect/breaker - no motion or energization should be possible. Pull firmly on each lock and hasp to confirm each lock cannot be opened. (Verification of physical locks - Your original Step 3 from "verify")
    10. (Verify Physical Non-Electrical Isolation & Lockout): Verify each valve used for isolation (e.g., City Water Supply Valve) is in the closed position. Attempt to open each valve - it should not open. Pull firmly on each lock/hasp to confirm lock cannot be opened. Verify that associated water/fluid flow to the cooling tower has stopped. (Verification of physical locks & result - Your original Step 4 from "verify")
    11. (Attempt to Start Using Normal Controls - The Main "Try"): Return to the normal operating controls (the E-02 Control Panel PLC touch screen located in the Building 1 Boiler Room). Attempt to start the Cooling Tower system by pressing the appropriate button or control. (This is the key "Try" step, placed after physical isolation/lockout)
    12. (VERIFY Lockout Effectiveness): VERIFY the Cooling Tower DOES NOT start. This confirms that the physical isolation and lockout devices (applied in Steps 4-7/8) are effective. (Verification result)
    13. (Return Controls to OFF): Return the button or control on the PLC touch screen back to the OFF or STOP position after the failed start attempt. (Cleanup after the "Try")
    14. (Assess Need for Zero Energy Test): If the job DOES NOT involve any exposed wiring and VERIFICATION of LOCKOUT/TRY is completed (Steps 9-13 successful), the lockout application and verification process is complete. Proceed to perform the job. (Decision point - Your original Step 5 adapted)
    15. (Perform Zero Energy Test - If required): If the job involves exposed wiring or electrical components, use a properly tested voltage measurement device to test all potentially exposed conductors and connection points for ZERO ENERGY. VERIFY that there is no electrical voltage present. (Zero Energy Test - Your original Step 6 adapted)
    16. (Final Verification Complete): After ALL applicable TESTING and VERIFICATION steps (Steps 9-15) have been successfully VERIFIED (all energy sources isolated and confirmed de-energized), the equipment is safe to work on. (Concluding statement - Your original Step 7 adapted)

    Explanation of Placement:

    • The initial verification (checking for running pumps/flow) is integrated into Step 3 because that's where you are verifying the shutdown before physical isolation begins.
    • The core "Try" step using the PLC (Step 11) and the verification checks of the physical locks (Steps 9-10) and zero energy (Step 15) are placed after the steps detailing the physical isolation and lockout application (Steps 4-7, plus the added Stored Energy Step 8).
    • This sequence is crucial: You shut down -> isolate energy -> apply locks -> then test if the locks worked by trying to restart it, checking the locks, and verifying zero energy.

    This integrates your verification needs into the existing template structure, making it follow the safer, standard LOTO sequence within the constraints of the combined "Lockout Application Process" section. Remember to add the specific details about which isolation points to use under or near Step 4.

  29. User

    basically number 3 covers the PLC screen

  30. Assistant

    Okay, let's refine that based on the understanding that your 1-7 list is the "Lockout Application Process" section.

    If Step 3 is intended to cover the initial interaction with the PLC screen to shut the equipment down and confirm it's off, then we can phrase it more explicitly.

    However, it's essential to remember that the main "Try" step (attempting to start the equipment via the PLC after locks are applied) is a separate and critical verification step that happens later in the sequence.

    Here's how you could word Step 3 to specifically mention the PLC for the initial shutdown, while still preserving the later steps for the post-LOTO verification:

    LOCKOUT APPLICATION PROCESS

    1. Fill out all necessary permits needed to perform scope of work BEFORE beginning any work. (LOTO, Safe Work are always required. If entire room is not to remain down, a supplemental LOTO procedure may be required and you must engage your supervisor.)
    2. Perform a Pre-Job discussion with team involved with performing the work.
    3. Notify all affected personnel (operators) not directly working on equipment before starting the LOCKOUT PROCEDURE. Use the normal operating controls on the E-02 Control Panel PLC touch screen located in the Building 1 Boiler Room to command the Cooling Tower and associated pumps OFF. Verify the Cooling Tower is in a stopped state by confirming no pumps are running (audible) and no water is flowing (visible and audible). Ensure the process indicates OFF/STOP status on the PLC screen. Clarify power will be totally isolated to a de-energized condition and operations will not be available. Document with operator signature on the LOTO permit. (This explicitly covers the initial PLC interaction and verification of the stopped state)
    4. Identify and locate ALL energy isolation points for the E-02 Cooling Tower system. Operate each control point (isolation device) to place it in the safe (isolated) position (e.g., electrical disconnects OFF, valves closed). Apply Lockout devices, locks, and tags following the written procedure steps below.
      • (Detail the specific isolation points and how to operate them here).
    5. All locks applied to isolation points must be personally identified and in the “SECURED” position.
    6. Authorized master lock holder must perform a group LOCKOUT controlling the key(s) for each isolation lock applied.
    7. DO NOT allow work to be performed by anyone who has not applied own personal lock to the group LOCKOUT BOX.
    8. (Address Stored Energy - Add if applicable): Check for and safely relieve or control any stored energy (e.g., trapped pressure, residual electrical charge).
      • (Detail specific stored energy checks/relief procedures here).
    9. (Verify Physical Isolation & Lockout): Using the Left-Hand Rule, verify each electrical disconnect/breaker used for isolation is in the OFF position. Attempt to turn on each disconnect/breaker - no motion or energization should be possible. Pull firmly on each lock and hasp to confirm each lock cannot be opened.
    10. (Verify Physical Non-Electrical Isolation & Lockout): Verify each valve used for isolation is in the closed position. Attempt to open each valve - it should not open. Pull firmly on each lock/hasp to confirm lock cannot be opened. Verify that associated water/fluid flow to the cooling tower has stopped.
    11. (Attempt to Start Using Normal Controls - The Main "Try"): Return to the E-02 Control Panel PLC touch screen. Attempt to start the Cooling Tower system by pressing the appropriate button or control. (This is the crucial post-LOTO "Try")
    12. (VERIFY Lockout Effectiveness): VERIFY the Cooling Tower DOES NOT start. This confirms that the physical isolation and lockout devices (applied in Steps 4-8) are effective.
    13. (Return Controls to OFF): Return the button or control on the PLC touch screen back to the OFF or STOP position after the failed start attempt.
    14. (Assess Need for Zero Energy Test): If the job DOES NOT involve any exposed wiring and VERIFICATION of LOCKOUT/TRY is completed (Steps 9-13 successful), the lockout application and verification process is complete. Proceed to perform the job.
    15. (Perform Zero Energy Test - If required): If the job involves exposed wiring or electrical components, use a properly tested voltage measurement device to test all potentially exposed conductors and connection points for ZERO ENERGY. VERIFY that there is no electrical voltage present.
    16. (Final Verification Complete): After ALL applicable TESTING and VERIFICATION steps (Steps 9-15) have been successfully VERIFIED, the equipment is safe to work on.

    By explicitly mentioning the PLC touch screen in the revised Step 3, you satisfy the need to show that's where the initial shutdown command happens. The subsequent steps (9-16) then provide the necessary and correctly sequenced verification steps after the lockout, including the essential "Try" using the PLC again to confirm the lockout's effectiveness.

  31. User

    i just put it as its onwn atep:

    1. Fill out all necessary permits needed to perform scope of work BEFORE beginning any work. (LOTO, Safe Work are always required. If entire room is not to remain down, a supplemental LOTO procedure may be required and you must engage your supervisor.)
    2. Perform a Pre-Job discussion with team involved with performing the work.
    3. CAUTION: Before working on E-02 Cooling Tower, ENSURE that manufacturing equipment in Building 1 is not operating or dependent on the cooling water system during the lockout.
    4. Notify all affected personnel (operators) not directly working on equipment before starting the LOCKOUT PROCEDURE. Be sure to verify process has been shut down following operating procedure. Clarify power will be totally isolated to a de-energized condition and operations will not be available. Document with operator signature on the LOTO permit.
    5. Isolate energy sources at control points and apply Lockout devices, locks, and tags following the written procedure steps below.
    6. All locks applied to isolation points must be personally identified and in the “SECURED” position.
    7. Authorized master lock holder must perform a group LOCKOUT controlling the key(s) for each isolation lock applied.
    8. DO NOT allow work to be performed by anyone who has not applied own personal lock to the group LOCKOUT BOX.
  32. Assistant

    Okay, I understand now. Your list of 1-8 is the sequence of steps within the section titled "Lockout Application Process".

    Given this structure, the steps for verifying the equipment is off and performing the crucial "Try" test after applying locks need to be inserted logically within this sequence.

    Here's where your verification steps fit:

    1. Initial Verification (Confirming it's OFF - audible/visible checks): This belongs after notification (Step 4) and before or as part of the physical isolation (Step 5), confirming the equipment is in a safe, stopped state before you start isolating energy. Your current Step 4 already includes "Be sure to verify process has been shut down following operating procedure," which is the place to put this detail.

    2. Attempting to Start via PLC (The crucial post-LOTO "Try"): This essential test must happen after you have completed the physical isolation and applied your locks (Steps 5, 6, 7, 8). All the verification checks (checking physical locks, the PLC try, zero energy test) belong after the application of LOTO.

    Here's how you can integrate the verification steps into your list:

    LOCKOUT APPLICATION PROCESS

    1. Fill out all necessary permits needed to perform scope of work BEFORE beginning any work. (LOTO, Safe Work are always required. If entire room is not to remain down, a supplemental LOTO procedure may be required and you must engage your supervisor.)
    2. Perform a Pre-Job discussion with team involved with performing the work.
    3. CAUTION: Before working on E-02 Cooling Tower, ENSURE that manufacturing equipment in Building 1 is not operating or dependent on the cooling water system during the lockout.
    4. Notify all affected personnel (operators) not directly working on equipment before starting the LOCKOUT PROCEDURE. Be sure to verify process has been shut down following operating procedure. Visually and audibly verify the Cooling Tower is OFF by confirming no pumps are running and no water is flowing. Clarify power will be totally isolated to a de-energized condition and operations will not be available. Document with operator signature on the LOTO permit. (Initial verification of stopped state is here)
    5. Identify and locate ALL energy isolation points for the E-02 Cooling Tower system. Operate each control point (isolation device) to place it in the safe (isolated) position (e.g., electrical disconnects OFF, valves closed). Apply Lockout devices, locks, and tags following the written procedure steps below. (Physical Isolation & Lockout Application begins here)
      • (Detail the specific isolation points [disconnects, valves] and how to operate them here or reference a detailed list).
    6. All locks applied to isolation points must be personally identified and in the “SECURED” position. (Detail of Lockout Application)
    7. Authorized master lock holder must perform a group LOCKOUT controlling the key(s) for each isolation lock applied. (Detail of Lockout Application for Group LOTO)
    8. DO NOT allow work to be performed by anyone who has not applied own personal lock to the group LOCKOUT BOX. (Rule for Lockout Application)
    9. (Address Stored Energy - Add if applicable): Check for and safely relieve or control any stored energy (e.g., trapped pressure, residual electrical charge). (This step logically comes after physical isolation and lockout, before testing).
      • (Detail specific stored energy checks/relief procedures here).
    10. (Verify Physical Electrical Isolation & Lockout): Using the Left-Hand Rule, verify each electrical disconnect/breaker used for isolation is in the OFF position. Attempt to turn on each disconnect/breaker - no motion or energization should be possible. Pull firmly on each lock and hasp to confirm each lock cannot be opened. (Verification of physical locks)
    11. (Verify Physical Non-Electrical Isolation & Lockout): Verify each valve used for isolation is in the closed position. Attempt to open each valve - it should not open. Pull firmly on each lock/hasp to confirm lock cannot be opened. Verify that associated water/fluid flow to the cooling tower has stopped. (Verification of physical locks & result)
    12. (Attempt to Start Using Normal Controls - The Main "Try"): Return to the normal operating controls (the E-02 Control Panel PLC touch screen located in the Building 1 Boiler Room). Attempt to start the Cooling Tower system by pressing the appropriate button or control. (This is the crucial post-LOTO "Try")
    13. (VERIFY Lockout Effectiveness): VERIFY the Cooling Tower DOES NOT start. This confirms that the physical isolation and lockout devices (applied in Steps 5-9) are effective. (Verification result)
    14. (Return Controls to OFF): Return the button or control on the PLC touch screen back to the OFF or STOP position after the failed start attempt. (Cleanup after the "Try")
    15. (Assess Need for Zero Energy Test): If the job DOES NOT involve any exposed wiring and VERIFICATION of LOCKOUT/TRY is completed (Steps 10-14 successful), the lockout application and verification process is complete. Proceed to perform the job.
    16. (Perform Zero Energy Test - If required): If the job involves exposed wiring or electrical components, use a properly tested voltage measurement device to test all potentially exposed conductors and connection points for ZERO ENERGY. VERIFY that there is no electrical voltage present.
    17. (Final Verification Complete): After ALL applicable TESTING and VERIFICATION steps (Steps 10-16) have been successfully VERIFIED, the equipment is safe to work on.

    Summary:

    • The initial verification of the equipment being stopped (checking for pumps/flow) fits well within Step 4.
    • The crucial "Attempt to Start using PLC" (the "Try" step to verify LOTO) and all subsequent verification steps (checking physical locks, zero energy test) must be placed after the steps detailing the physical isolation and application of locks (Steps 5 through 9). This ensures the test is verifying the effectiveness of the lockout you just applied.
  33. User

    if the LOTO is divded into jobs, each job section has the lockout steps and the verification section. shoul dit also have this red section?

  34. Assistant

    Yes, absolutely. If your LOTO procedure is divided into sections for each specific job or piece of equipment, then the core steps outlined in the "red section" (which encompass the entire LOTO process for that specific job) must be included in each respective job section.

    Here's why:

    1. Job-Specific Instructions: LOTO procedures are effective only when they provide clear, step-by-step instructions specific to the equipment being serviced. The isolation points, energy types, lockout devices, and verification methods are unique to each machine or system.
    2. Completeness within the Job: If a section is dedicated to "LOTO Procedure for the E-02 Cooling Tower," it needs to contain all the necessary steps to perform LOTO correctly on that cooling tower, from initial preparation specific to that tower through final verification.
    3. The "Red Section" IS the Job's Procedure: The sequence we developed in the "red section" (planning, notification, shutdown, isolation, lockout application, stored energy control, and verification/try) is the procedure for that specific job (the Cooling Tower).

    How it might look within your template:

    Your overall LOTO document might have:

    • General LOTO Policy/Procedure: (High-level rules, definitions, responsibilities, types of energy).
    • LOTO Procedures for Specific Equipment/Jobs:
      • Job: E-02 Cooling Tower
        • (All steps from the "red section" apply here, detailing how to lock out and verify the Cooling Tower - including specific isolation points, the PLC try, valve checks, zero energy test, etc.)
      • Job: X-Y-Z Pump
        • (All steps from the "red section" apply here, detailing how to lock out and verify Pump X-Y-Z - this will have different isolation points, possibly different stored energy, and different verification steps like trying the pump's local start button).
      • Job: A-B-C Conveyor
        • (All steps from the "red section" apply here, detailing how to lock out and verify Conveyor A-B-C).

    So, yes, the content of the "red section" is not a separate, optional list. It's the detailed procedure for performing LOTO on the E-02 Cooling Tower. If you have other "Job" sections for different equipment, they will follow the same logical flow (Preparation -> Notification -> Shutdown -> Isolation -> Lockout -> Stored Energy -> Verification) but with different specific details for each step relevant to that piece of equipment.

  35. User

    how do i modifiy ONE LOTO APPLICATION process to address shutting down certain things from the PLC first. For example, the is a section on pumps and just the specific pump should be shut off first from the plc

  36. Assistant

    Okay, this requires modifying the standard steps slightly to accommodate the initial focus on shutting down just the specific component (like a pump) using the PLC first, within a procedure that likely covers the broader Cooling Tower system.

    We need to explicitly state the action of using the PLC to shut down the specific equipment being worked on before the general "Isolate energy sources" step (Step 5).

    Here's how you can modify your "LOCKOUT APPLICATION PROCESS" list to incorporate this, while still keeping the crucial post-LOTO verification "Try" later in the sequence:

    LOCKOUT APPLICATION PROCESS

    1. Fill out all necessary permits needed to perform scope of work BEFORE beginning any work. (LOTO, Safe Work are always required. If entire room is not to remain down, a supplemental LOTO procedure may be required and you must engage your supervisor.)
    2. Perform a Pre-Job discussion with team involved with performing the work.
    3. CAUTION: Before working on E-02 Cooling Tower (or specific component, e.g., Pump #X), ENSURE that manufacturing equipment in Building 1 is not operating or dependent on the cooling water system during the lockout.
    4. Notify all affected personnel (operators) not directly working on equipment before starting the LOCKOUT PROCEDURE. Clarify power will be totally isolated to a de-energized condition and operations will not be available. Document with operator signature on the LOTO permit.
    5. Shut Down Specific Equipment via Controls:
      • Identify the specific equipment being locked out (e.g., Cooling Tower Fan #1, Pump #2, etc.).
      • Use the normal operating controls on the E-02 Control Panel PLC touch screen located in the Building 1 Boiler Room to command this specific equipment OFF.
      • Verify this specific equipment is in a stopped state by confirming no operation (visual/audible).
      • Ensure the PLC screen indicates the status of this specific equipment is OFF/STOP.
    6. Isolate energy sources for the specific equipment being locked out at their control points and apply Lockout devices, locks, and tags following the written procedure steps below. (This step now applies to the specific equipment identified in Step 5)
      • (Detail the specific isolation points [disconnects, valves, etc.] for the specific equipment being locked out and how to operate them here or reference a detailed list).
    7. All locks applied to these isolation points must be personally identified and in the “SECURED” position. (This applies to the locks for the specific equipment)
    8. Authorized master lock holder must perform a group LOCKOUT controlling the key(s) for each isolation lock applied for the specific equipment. (For Group LOTO of the specific equipment)
    9. DO NOT allow work to be performed by anyone who has not applied own personal lock to the group LOCKOUT BOX for this specific equipment. (Rule for Group LOTO)
    10. (Address Stored Energy - Add if applicable): Check for and safely relieve or control any stored energy specific to the equipment being locked out (e.g., trapped pressure in a pump line, residual electrical charge).
      • (Detail specific stored energy checks/relief procedures for the specific equipment).
    11. (Verify Physical Electrical Isolation & Lockout): Using the Left-Hand Rule, verify each electrical disconnect/breaker used for isolation of the specific equipment is in the OFF position. Attempt to turn on each disconnect/breaker - no motion or energization should be possible. Pull firmly on each lock and hasp to confirm each lock cannot be opened.
    12. (Verify Physical Non-Electrical Isolation & Lockout): Verify each valve used for isolation of the specific equipment is in the closed position. Attempt to open each valve - it should not open. Pull firmly on each lock/hasp to confirm lock cannot be opened. Verify that associated water/fluid flow to the specific equipment has stopped.
    13. (Attempt to Start Specific Equipment Using Normal Controls - The Main "Try"): Return to the normal operating controls (the E-02 Control Panel PLC touch screen). Attempt to start the specific equipment being locked out by pressing the appropriate button or control for that equipment. (This is the crucial post-LOTO "Try" for the specific item)
    14. (VERIFY Lockout Effectiveness): VERIFY the specific equipment DOES NOT start. This confirms that the physical isolation and lockout devices (applied in Steps 6-10) are effective.
    15. (Return Controls to OFF): Return the button or control for the specific equipment on the PLC touch screen back to the OFF or STOP position after the failed start attempt.
    16. (Assess Need for Zero Energy Test): If the job DOES NOT involve any exposed wiring on the specific equipment and VERIFICATION of LOCKOUT/TRY is completed (Steps 11-15 successful), the lockout application and verification process is complete. Proceed to perform the job.
    17. (Perform Zero Energy Test - If required): If the job involves exposed wiring or electrical components on the specific equipment, use a properly tested voltage measurement device to test all potentially exposed conductors and connection points for ZERO ENERGY. VERIFY that there is no electrical voltage present.
    18. (Final Verification Complete): After ALL applicable TESTING and VERIFICATION steps (Steps 11-17) have been successfully VERIFIED, the specific equipment is safe to work on.

    Key Changes:

    • Added Step 5 explicitly for shutting down the specific equipment using the PLC. This addresses the mechanic's point as the initial action.
    • Modified subsequent steps (6 onwards) to clarify they apply to the "specific equipment being locked out" rather than the entire Cooling Tower system, where applicable (like isolating energy, addressing stored energy, and performing verification tests).
    • Step 13 specifically instructs the user to attempt starting the specific equipment via the PLC, correctly placing this crucial verification after the lockout application.

    This revised structure allows the procedure to cover individual components within the larger system, starting with the PLC command for that component, while still following the safe LOTO sequence for isolation, lockout, and verification. You would need to ensure the "written procedure steps below" referenced in Step 6 (detailing isolation points) are also specific to the equipment being locked out.

  37. User

    how is this (and I will update the operating procedure to have more spefic instructions:

    1. Fill out all necessary permits needed to perform scope of work BEFORE beginning any work. (LOTO, Safe Work are always required. If entire room is not to remain down, a supplemental LOTO procedure may be required and you must engage your supervisor.)
    2. Perform a Pre-Job discussion with team involved with performing the work.
    3. CAUTION: Before working on E-02 Cooling Tower, ENSURE that manufacturing equipment in Building 1 is not operating or dependent on the cooling water system during the lockout.
    4. Notify all affected personnel (operators) not directly working on equipment before starting the LOCKOUT PROCEDURE. Be sure to verify process has been shut down following operating procedure. Clarify power will be totally isolated to a de-energized condition and operations will not be available. Document with operator signature on the LOTO permit.
    5. For equipment with PLC controls, shut down the specific equipment from the PLC screen BEFORE applying physical lockouts (e.g., turn OFF specific pump from PLC before locking out pump disconnect)."
    6. Isolate energy sources at control points and apply Lockout devices, locks, and tags following the written procedure steps below.
    7. All locks applied to isolation points must be personally identified and in the “SECURED” position.
    8. Authorized master lock holder must perform a group LOCKOUT controlling the key(s) for each isolation lock applied.
    9. DO NOT allow work to be performed by anyone who has not applied own personal lock to the group LOCKOUT BOX.
  38. Assistant

    Okay, let's look at this modified list (1-9).

    This structure does incorporate the initial shutdown action via the PLC (Step 5) into your "Lockout Application Process" list, placed logically before the physical isolation and lockout steps (6-9). This successfully addresses the mechanic's point about making the PLC shutdown a habit and an early step in the process for equipment controlled this way.

    Here's the list with comments on the flow:

    LOCKOUT APPLICATION PROCESS

    1. Fill out all necessary permits needed to perform scope of work BEFORE beginning any work. (LOTO, Safe Work are always required. If entire room is not to remain down, a supplemental LOTO procedure may be required and you must engage your supervisor.) (Good, planning step)
    2. Perform a Pre-Job discussion with team involved with performing the work. (Good, communication step)
    3. CAUTION: Before working on E-02 Cooling Tower, ENSURE that manufacturing equipment in Building 1 is not operating or dependent on the cooling water system during the lockout. (Good, dependency/impact check)
    4. Notify all affected personnel (operators) not directly working on equipment before starting the LOCKOUT PROCEDURE. Be sure to verify process has been shut down following operating procedure. Clarify power will be totally isolated to a de-energized condition and operations will not be available. Document with operator signature on the LOTO permit. (Notification and high-level verification of shutdown)
    5. For equipment with PLC controls, shut down the specific equipment from the PLC screen BEFORE applying physical lockouts (e.g., turn OFF specific pump from PLC before locking out pump disconnect)." (This is the added step addressing the initial PLC shutdown. Well-placed after notification and before physical isolation).
    6. Isolate energy sources at control points and apply Lockout devices, locks, and tags following the written procedure steps below. (Initiates the physical isolation and lockout application)
    7. All locks applied to isolation points must be personally identified and in the “SECURED” position. (Rule for Lockout Application)
    8. Authorized master lock holder must perform a group LOCKOUT controlling the key(s) for each isolation lock applied. (Rule for Group LOTO)
    9. DO NOT allow work to be performed by anyone who has not applied own personal lock to the group LOCKOUT BOX. (Rule for Lockout Application)

    Analysis:

    • This list (1-9) effectively covers the initial steps of preparation, notification, controlled shutdown (via PLC), and the beginning/rules of physical isolation and lockout application.
    • Step 5 explicitly includes the mechanic's desired initial action (using the PLC) and places it correctly before the physical lockout.
    • Step 4 still has "verify process has been shut down," which can serve as a broader check that the system as a whole is ready for the specific equipment lockout, or you can refine Step 5 to include more explicit verification after the PLC command for the specific item (e.g., "Verify the specific equipment indicates OFF on the PLC screen and visually/audibly confirm it is stopped").

    What's Still Needed (and follows this list):

    Your list 1-9 covers the application process. However, the crucial Verification Steps (The "Try") that confirm the lockout is effective are still missing from this specific list.

    These verification steps MUST come after the physical isolation and lockout described in Steps 5-9. This is where you test that the locks you applied prevent the equipment from starting.

    So, immediately following this list of 9 steps, you need a section that includes:

    • (Address Stored Energy): This often comes before verification. Safely relieve/control any stored energy specific to the equipment.
    • (Verify Physical Isolation & Lockout): Check that the physical isolation devices (disconnects, valves) cannot be moved and the locks are secure. (Your previous points about Left-Hand Rule, pulling on locks).
    • (Attempt to Start Equipment via Controls - The Main "Try"): Return to the PLC screen and attempt to start the specific equipment you just locked out.
    • (VERIFY Result): VERIFY it DOES NOT start.
    • (Return Controls): Return the PLC controls to OFF after the failed try.
    • (Zero Energy Test): Perform the zero energy test if working on exposed electrical parts.
    • (Final Verification Confirmation): State that verification is complete and work can begin.

    Conclusion:

    Your current list (1-9) effectively sets up the lockout by covering preparation, notification, initial PLC shutdown, and the start of physical isolation/application. It correctly places the initial PLC shutdown action. However, it's just the first part. The equally critical verification process (the "Try" sequence) must follow this list in your procedure.