a. To construct a 95% confidence interval estimate for the population mean frontline employee turnover cost of member organizations, we can use the formula:
Confidence Interval = X ± (Z * (S / √n))
Where:
X = sample mean frontline employee turnover cost = 12,500S=samplestandarddeviation=1,000
n = sample size = 100
Z = Z-score for a 95% confidence level, which corresponds to a two-tailed test. The Z-score can be found using a standard normal distribution table or a calculator. In this case, Z = 1.96 (approximately).
Plugging in the values:
Confidence Interval = 12,500±(1.96∗(1,000 / √100))
Confidence Interval = 12,500±(1.96∗(1,000 / 10))
Confidence Interval = 12,500±(1.96∗100)
Confidence Interval = 12,500±196
Confidence Interval = (12,304,12,696)
Therefore, the 95% confidence interval estimate for the population mean frontline employee turnover cost of member organizations is (12,304,12,696).
b. To construct a 95% confidence interval estimate for the population proportion of member organizations that have both talent and development programs in place to drive human-capital management, we can use the formula:
Confidence Interval = p-hat ± (Z * √((p-hat * (1 - p-hat)) / n))
Where:
p-hat = sample proportion of member organizations with talent and development programs = 30/100 = 0.3
n = sample size = 100
Z = Z-score for a 95% confidence level, which corresponds to a two-tailed test. The Z-score can be found using a standard normal distribution table or a calculator. In this case, Z ≈ 1.96.
Plugging in the values:
Confidence Interval = 0.3 ± (1.96 * √((0.3 * (1 - 0.3)) / 100))
Confidence Interval = 0.3 ± (1.96 * √(0.21 / 100))
Confidence Interval = 0.3 ± (1.96 * √0.0021)
Confidence Interval = 0.3 ± (1.96 * 0.0458)
Confidence Interval = (0.212, 0.388)
Therefore, the 95% confidence interval estimate for the population proportion of member organizations that have both talent and development programs in place to drive human-capital management is (0.212, 0.388).
c. To determine the sample size needed to estimate the population mean frontline employee turnover cost to within $250 with 99% confidence, we can use the formula:
n = (Z^2 * S^2) / (E^2)
Where:
Z = Z-score for a 99% confidence level, which corresponds to a two-tailed test. The Z-score can be found using a standard normal distribution table or a calculator. In this case, Z ≈ 2.576.
S = sample standard deviation = 1,000E=marginoferror=250
Plugging in the values:
n = (2.576^2 * 1,0002)/250^2
n = (6.634176 * 1,0002)/250^2
n ≈ (6.634176 * 1,000,000) / 62,500
n ≈ 106.03
Therefore, a sample size of at least 107 is needed to have 99% confidence of estimating the population mean frontline employee turnover cost to within $250.
d. To determine the number of member organizations that need to be selected to have 90% confidence of estimating the population proportion of organizations that have both talent and development programs in place to drive human-capital management to within 0.045, we can use the formula:
n = (Z^2 * p-hat * (1 - p-hat)) / (E^2)
Where:
Z = Z-score for a 90% confidence level, which corresponds to a two-tailed test. The Z-score can be found using a standard normal distribution table or a calculator. In this case, Z ≈ 1.645.
p-hat = estimated proportion of member organizations with talent and development programs, which we can assume to be 0.5 (maximum variability).
E = margin of error = 0.045
Plugging in the values:
n = (1.645^2 * 0.5 * (1 - 0.5)) / 0.045^2
n = (2.704025 * 0.5 * 0.5) / 0.002025
n = 0.67600625 / 0.002025
n ≈ 333.58
Therefore, a sample size of at least 334 member organizations needs to be selected to have 90% confidence of estimating the population proportion of organizations that have both talent and development programs in place to drive human-capital management to within 0.045.