a. To construct a 95% confidence interval estimate for the population mean frontline employee turnover cost, we can use the formula:
CI = X ± Z * (S / √n)
Where:
CI = Confidence Interval
X = Sample mean (frontline employee turnover cost)
Z = Z-score for the desired confidence level (95% confidence level corresponds to a Z-score of 1.96)
S = Sample standard deviation (frontline employee turnover cost)
n = Sample size (number of member organizations)
Plugging in the given values, we have:
X = 12,500S=1,000
n = 100
Z = 1.96 (for 95% confidence level)
CI = 12,500±1.96∗(1,000 / √100)
CI = 12,500±1.96∗(1,000 / 10)
CI = 12,500±1.96∗100
CI = 12,500±196
The 95% confidence interval estimate for the population mean frontline employee turnover cost of member organizations is 12,500±196.
b. To construct a 95% confidence interval estimate for the population proportion of member organizations that have both talent and development programs in place to drive human-capital management, we can use the formula:
CI = p̂ ± Z * √(p̂ * (1-p̂) / n)
Where:
CI = Confidence Interval
p̂ = Sample proportion (member organizations with talent and development programs)
Z = Z-score for the desired confidence level (95% confidence level corresponds to a Z-score of 1.96)
n = Sample size (number of member organizations)
Plugging in the given values, we have:
p̂ = 30/100 = 0.3
n = 100
Z = 1.96 (for 95% confidence level)
CI = 0.3 ± 1.96 * √(0.3 * (1-0.3) / 100)
To calculate the confidence interval, we need to calculate the standard error:
SE = √(0.3 * (1-0.3) / 100)
CI = 0.3 ± 1.96 * SE
Using a calculator to calculate the standard error, we find SE ≈ 0.048
CI = 0.3 ± 1.96 * 0.048
The 95% confidence interval estimate for the population proportion of member organizations that have both talent and development programs in place to drive human-capital management is 0.3 ± 0.095.
c. To determine the sample size needed to have 99% confidence of estimating the population mean frontline employee turnover cost to within $250, we can use the formula:
n = (Z * (S / E))^2
Where:
n = Sample size (unknown)
Z = Z-score for the desired confidence level (99% confidence level corresponds to a Z-score of 2.33)
S = Sample standard deviation (unknown)
E = Margin of error (in this case, $250)
Plugging in the given values, we have:
Z = 2.33 (for 99% confidence level)
S = 1,000(fromparta)E=250
n = (2.33 * (1,000/250))^2
n = (2.33 * 4)^2
n = 9.32^2
n ≈ 87
Therefore, a sample size of at least 87 is needed to have 99% confidence of estimating the population mean frontline employee turnover cost to within $250.
d. To determine the number of member organizations needed to have 90% confidence of estimating the population proportion of organizations that have both talent and development programs in place to drive human-capital management to within 0.045, we can use the formula:
n = (Z / E)^2 * (p̂ * (1-p̂))
Where:
n = Sample size (unknown)
Z = Z-score for the desired confidence level (90% confidence level corresponds to a Z-score of 1.645)
E = Margin of error (in this case, 0.045)
p̂ = Estimated proportion (unknown)
Plugging in the given values, we have:
Z = 1.645 (for 90% confidence level)
E = 0.045
p̂ = 0.3 (from part b)
n = (1.645 / 0.045)^2 * (0.3 * (1-0.3))
n ≈ 36.44 * 0.21
n ≈ 7.647
Therefore, at least 8 member organizations need to be selected to have 90% confidence of estimating the population proportion of organizations that have both talent and development programs in place to drive human-capital management to within 0.045.