The banding machine is used at a paper mill to place metal straps around paper rolls in…
- User
The banding machine is used at a paper mill to place metal straps around paper rolls in preparation for shipping. The plant PLC will control the conveyor and communicate with the banding machine to place the band at the correct position on the paper roll. This lab will focus on simulating the PLC control for the conveyor and the process of finding the center of the paper roll for banding.
Requirements: When the start button is pressed, the conveyor should start (assuming there are no alarms). When Photo Eye 1 (PE1) detects the paper roll, a timer should begin timing the length of the paper roll. Once the roll clears PE1, the accumulated time should be moved to a register using the MOV instruction, allowing the PLC to calculate the center of the roll. Photo Eye 2 (PE2) will trigger a second timer to stop the conveyor at the center of the roll, allowing the banding machine to place the band.
Input and Output Assignments: Discrete Inputs: Conveyor Stop Button – Input 0 Conveyor Start Button – Input 1 Photo Eye 1 (PE1) – Input 2 Photo Eye 2 (PE2) – Input 3 Conveyor Running Feedback Signal – Input 4 Alarm Reset Switch – Input 5 Relay Outputs: Conveyor Start/Stop (Lightbulb 0) – Output 0 Hints: Use an RTO timer to calculate the length of the paper roll, ensuring the timer doesn’t reset if the conveyor stops. Ensure the conveyor is running before accumulating time from PE1 or PE2. If the conveyor fails to start within 2 seconds after receiving the start signal, trigger a motor fail-to-start alarm, and keep the conveyor off until the alarm is reset and the start button is pressed again. Consult RSLogix 500’s Help function for details on any instruction you need.
- Assistant
Other models, same or similar prompt
Responses were produced in different, uncontrolled contexts (system prompts, settings, prior turns). This is not a benchmark.