<recommendedplugins> Here is a list of plugins that are available but not installed. If…
- User
<recommended_plugins> Here is a list of plugins that are available but not installed. If the user's query would benefit from one of these plugins, use the
request_plugin_installtool to suggest that they install it. Pass the parenthesized ID asplugin_id. For example, suggest the Google Drive plugin if the query could possibly be better answered with access to Google Drive.- Atlassian Rovo (atlassian-rovo@openai-curated-remote)
- Slack (slack@openai-curated-remote) </recommended_plugins>
- User
- User
<environment_context> /Users/hedde/code/evorto zsh <current_date>2026-07-09</current_date> Europe/Berlin <workspace_roots>/Users/hedde/code/evorto</workspace_roots><permission_profile type="disabled"><file_system type="unrestricted" /></permission_profile> </environment_context>
- User
Please land our config change on main
- Assistant
I’ll first identify the pending configuration change and the repository’s current branch/remote state, then land only that scoped change on
mainwith verification. I’m using the repository’s Effect and branch-workflow guidance so the handoff matches this project’s conventions. - Assistant
I’m also applying the repository’s web-security guidance while checking the configuration, since config changes can affect runtime exposure and deployment safety. I’ve started with read-only inspection; no files or Git state have been changed.
- Assistant
The change is limited to
.codex/config.toml, parses cleanly, and enables the intended native multi-agent settings.origin/mainhas one already-landed commit and does not touch this file, so I can fast-forward safely before committing the config change. - Assistant
The project’s Git Town workflow confirms that
mainis the correct direct sync-and-push path here. I’ll fast-forward to the current remote tip, preserve the isolated config patch, commit it, then use Git Town to publishmain. - Assistant
mainis protected by an active GitHub ruleset: this must land through a squash-merged pull request, not a direct push. I’ve updated the local base and will now move the patch onto a short-lived Git Town branch, validate it, and take it through the required PR/merge path. - Assistant
Git Town’s stack sync unexpectedly attempted to update an unrelated stale local branch and hit conflicts there. I’m rolling back that sync operation with Git Town’s own undo command; the config patch is safely stashed and untouched.
- Assistant
The rollback is complete:
mainis current and the only remaining local change is the original config patch. I’m avoiding the stale stack’s unrelated branches and creating the required review branch directly from this verifiedmaintip. - Assistant
The branch now contains one validated configuration-only commit. Next I’m publishing the review branch and opening the required squash-merge PR; no application schema or runtime files are included.
- Assistant
PR #84 is open from the Git Town branch with exactly the one config file. I’m doing the final mergeability and scope check now, then I’ll squash-merge it into protected
main. - Assistant
The PR is mergeable and has exactly five additions in one file. Its normal CodeQL, E2E, Git Town, and CodeRabbit checks are running; I’ll let those finish before squashing it, unless an unrelated infrastructure failure makes that impossible.
- Assistant
In addition to the configuration-specific checks, I’m running the repository’s required lint and formatter pass before the final merge. The PR’s CI remains in progress.
- Assistant
The required formatter completed, but it also rewrote eight unrelated files that were already on the newly updated base. I’m removing only those formatter-only edits now so the PR remains strictly scoped to the configuration change.
- Assistant
Local lint and formatter completed; after removing the formatter’s unrelated rewrites, the worktree and PR are back to the intended single-file diff. CodeQL, documentation, and Git Town checks are green; only E2E and CodeRabbit are still running.
- Assistant
Everything except the E2E baseline is green. That job is still active, so I’m keeping the already-mergeable PR open until it reaches a terminal result.
- Assistant
The E2E job has progressed through checkout, dependency install, browser setup, and image build; it is currently starting its isolated Docker stack. No failure has been reported.
- Assistant
The E2E environment is up and the Playwright suite is running now. All other PR checks are successful.
- Assistant
The remote Playwright run is still active, with no failing steps. The branch remains clean and contains only the committed config change.
- Assistant
The only remaining check is executing the full Playwright suites; setup is complete and still clean. I’ll merge as soon as it reports success.
- Assistant
CI is still running the Playwright suite normally; all completed setup and quality checks remain green.
- Assistant
The Playwright suite is the sole outstanding gate and is taking longer than the setup phase; no errors have appeared. I’m continuing to watch it rather than merging around it.
- Assistant
The remote E2E job has been running for about 17 minutes overall, with roughly 12 minutes in the Playwright suite. It has not reported a failure; I’m giving it a little longer to conclude cleanly.
- Assistant
I’m checking whether the remaining long-running E2E job is making normal progress or has stalled; the PR does not require it for merge, but I want the handoff to be clear either way.
- Assistant
The E2E duration is still within this repository’s normal range (recent successful runs took 17–25 minutes), and there are no failed steps. I’m continuing to wait for the actual result.
- Assistant
The E2E run is at the high end of its recent normal duration but remains active without failure. I’m holding the merge until it reaches a terminal status.
- Assistant
The full E2E suite is still the only outstanding result. All local checks and every other remote check have passed, and no code beyond the configuration file is in the PR.
- Assistant
The Playwright suites themselves have now passed. The workflow is finishing artifact/document uploads and teardown; I’ll merge once GitHub marks the run successful.
- Assistant
All PR checks are now green, including the full E2E suite. I’m squash-merging #84 into
mainand removing the short-lived branch. - Assistant
The configuration change is now squash-merged into
mainand the local checkout matches the remote merge commit. The post-merge CI/deploy workflows have started; the merge itself is complete. - Assistant
Landed on
mainvia squash-merged PR #84:d3556e6673b.The change in .codex/config.toml enables goals and native multi-agent V2 with a nine-thread session limit. TOML validation, lint, formatting, CodeQL, E2E, Git Town, Knope, and CodeRabbit all passed.
mainis clean and matchesorigin/main.::git-create-branch{cwd="/Users/hedde/code/evorto" branch="codex/enable-codex-goals-multi-agent"} ::git-stage{cwd="/Users/hedde/code/evorto"} ::git-commit{cwd="/Users/hedde/code/evorto"} ::git-push{cwd="/Users/hedde/code/evorto" branch="codex/enable-codex-goals-multi-agent"} ::git-create-pr{cwd="/Users/hedde/code/evorto" branch="codex/enable-codex-goals-multi-agent" url="https://github.com/evorto-app/app/pull/84" isDraft=false}
Other models, same or similar prompt
Responses were produced in different, uncontrolled contexts (system prompts, settings, prior turns). This is not a benchmark.