AGENTS.md instructions for /Users/tanishqpalandurkar/Projects/better-ao <INSTRUCTIONS>…
- User
AGENTS.md instructions for /Users/tanishqpalandurkar/Projects/better-ao
--- project-doc ---
Agent workflow
User will assign one PRD at a time to an agent to implement. All the PRDs are available in the
./prdsdir.Naming conventions
- Omit the feature prefix from filenames and exports when files are already grouped under that feature directory (e.g. under
pages/, omitorchestrator-prefix and-pagesuffix — usekanban.tsx/KanbanPageinstead oforchestrator-kanban-page.tsx/OrchestratorKanbanPage).
- Omit the feature prefix from filenames and exports when files are already grouped under that feature directory (e.g. under
- User
<environment_context> /Users/tanishqpalandurkar/Projects/better-ao zsh <current_date>2026-05-28</current_date> Asia/Kolkata </environment_context>
- User
I'm thinking about where the fuck do I move the kanban button? any idea?
- Assistant
I’ll ground this in the current Better-AO UI instead of guessing from memory. I’m going to locate the kanban route/button and surrounding navigation so the recommendation fits the actual surface.
- Assistant
I found two relevant surfaces: a real
SessionViewTabscomponent with a top-level Kanban tab, and a Storybook exploration that already experiments with per-project Kanban actions. I’m reading those pieces now to see which direction is less awkward. - Assistant
Yes: move it out of the topbar.
Right now SessionViewTabs is basically a one-item tab group centered in the header. That feels wrong because Kanban is not a global mode switch anymore; it is a destination in the workspace tree.
Best placement:
Put Kanban in the project sidebar as a project-level destination, near the project row, before Orchestrator/workers.
Concretely, either:
-
Best if Kanban is project-scoped:
Under each project:ProjectBoardOrchestratorWorkers... -
Best if Kanban stays workspace-wide:
Add one root sidebar item aboveProjects: then below that keep projects/sessions.
-
- User
before suggesting think what the user interaction flow would be like in case of 4 projects are opened. Filter based on the number of clicks they have to mk for going from one project's kanban view to anothers and mention the flow when it passes your internal filter.
- Assistant
Fair. With 4 open projects, I’d filter the options by cross-project board switching cost.
The flow that passes:
Sidebar project-level
Boardrow under each project.Example sidebar:
textproject-a Board Orchestrator Workers... project-b Board Orchestrator Workers... project-c Board Orchestrator Workers... project-d Board Orchestrator Workers...Flow from project A Kanban to project D Kanban:
- Click
project-d > Board.
That is the bar: one click if the project is already expanded/visible. If collapsed, it becomes:
- Click
- User
What are my other options? I want to be, like, search exhaustively first of all, and then I'll make my mind up about what direction I should go in.
- Assistant
Other models, same or similar prompt
Responses were produced in different, uncontrolled contexts (system prompts, settings, prior turns). This is not a benchmark.