Write a data center audit report based on this information: standby systems are tested by the Facility Team on a bi-monthly basis utilising load banks, this also includes UPS testing. However, the test results do not appear to have been recorded.
The cooling system exceeds the projected IT load capacity but recent incidents have seen regular shuts-down of numerous CRAC units, requiring spot coolers to be deployed to protect the critical IT. • Temperature sensors deployed, but a calibration program does not exist. Safeguards needs to be established. • Install pressure and moisture sensor • Cabling redundancy, hazard and inefficiency is costing the company • Firestop barriers needs to be reinstated • Facilities Manager has raised a concern about future growth. • IT manager wants to expand data center • The return air temperature and humidity set-points were established when the data center was first commissioned twelve years ago >> this is a concern given the growth from 12 years ago. • Ensure that the tier III building’s Aspiring Smoke Detection(ASD) system is tested and compliant
• No decommissioning strategy • Cost to power these devices on, more difficult to do tech refreshes • Revisit asset tag process and procedures due to missing tags, partial tagging • Missing blanking panels leaving gaps in the cabinet, causing hot air to escape into the cold aisles • Non-conformance incidents needs to be rectify and corrective action plan • Critical system cabinets – needs to be properly labeled to prevent mishaps • Significant risk of EPO not functioning • Raised floor has dust – this can cause havoc if not remediated.
Security IT Security business is ISO 27001 compliant record detailing who has completed the on-site security training, which is mandatory for all personnel
IT personnel see no need to presently evaluate the operating parameters of the IT equipment, as the present ASHRAE recommended environmental parameters covers the operational requirements
Legislative • Government – impact to the business if company is not sustainability complaint. • Must meet energy efficiency targets and programs • Financial incentive by the government is a business opportunity
Business exposure Current risk – shift in customer demand Emerging risk – potential loss of existing business Future risk – shift customer will move to competing businesses once contractual terms end • Existing business customers will become more reliant on cloud-based offerings, if the company doesn’t right the ship, we will lose current and future business • Customer retention will be problematic if we don’t embrace the cloud strategy