SIMM Initial Margin Backtesting Framework
1. Introduction
1.1 Purpose
This document outlines the backtesting framework for the Standard Initial Margin Model (SIMM) used to calculate initial margin (IM) for non-centrally cleared over-the-counter (OTC) derivatives portfolios under Uncleared Margin Rules (UMR). The framework ensures the SIMM model's predictive accuracy by comparing model-generated IM against hypothetical revaluations (Hypo IM) based on observed market risk factor shocks.
Backtesting validates the conservatism of SIMM IM estimates, identifies model deficiencies, and triggers remediation where necessary. It complies with regulatory requirements (e.g., BCBS-IOSCO, EMIR, Dodd-Frank) and ISDA SIMM governance standards.
1.2 Scope
- Portfolios: All SIMM-covered portfolios subject to UMR Phase 5/6 or internal policy.
- Frequency: Daily backtesting for material portfolios (> threshold, e.g., $1bn notional); weekly/monthly for others.
- Historical Period: Rolling 12-24 months, with stress periods (e.g., COVID-19, March 2020).
- Risk Classes: Interest Rate (IR), Credit (Credit Qualifying [CQ] and Credit Non-Qualifying [CNQ]), Equity, Commodity, Foreign Exchange (FX).
1.3 Key Metrics
- Hypo IM: Recalculated SIMM IM using shocked risk factors.
- Backtesting Error (BTE): |Hypo IM - Original IM| / Original IM.
- Exceedance: Hypo IM > Original IM (model under-prediction).
2. Sensitivities Calculation and Usage
2.1 Sensitivity Generation
Sensitivities (δ) are computed daily using the firm's approved SIMM calibration (v2.6 or latest ISDA version) via the SIMM computation engine (e.g., in-house or vendor like FIS, Murex).
-
Input Data:
- Portfolio positions (trades, valuations) from trade repository.
- Risk factors: Curves (IR, inflation), spreads (credit, equity), volatilities, correlations from Bloomberg Refinitiv or approved sources.
-
Calculation Steps:
- Bucket positions by risk class/sub-class (e.g., IR: Currency, tenor).
- Compute linear sensitivities: δ = ∂V/∂RF (value change per 1bp shock to risk factor RF).
- Aggregate sensitivities with correlations (horizontal/vertical) and vh correlations.
- Output: Sensitivity vector per bucket.
-
Quality Checks:
- Data completeness (>99%).
- Sensitivity reasonability (e.g., |δ| < portfolio value * 100%).
- Reconciliation vs. previous day.
2.2 Backtesting Sensitivities
- Shock Application: Apply historical daily risk factor shocks (e.g., ΔRF_t = RF_{t+1} - RF_t) to base sensitivities.
- Hypo Sensitivities: δ_hypo = δ_base * (1 + ΔRF_t / scale), where scale normalizes shocks to SIMM buckets.
- Threshold: Flag if >10% of sensitivities show unexplained shifts (>20% deviation).
3. Exceedance Analysis
3.1 Backtesting Procedure
-
Daily Hypo Run:
- Shock risk factors using prior day-end data.
- Recalculate full SIMM IM (Hypo IM) using hypo sensitivities.
-
Metrics Calculation:
| Metric | Definition | Threshold |
|---|
| Absolute BTE | |Hypo IM - Original IM| / Original IM | Alert >5%; Breach >10% |
| Directional Exceedance | (Hypo IM - Original IM) / Original IM | >0% (under-prediction) |
| Exceedance Frequency | % of days with Hypo IM > Original IM | <5% over 250 days |
| Maximum Drawdown | Max consecutive exceedances | >5 days |
| Risk Class BTE | Per class (e.g., Commodity > Equity) | Class-specific: IR<3%, Comm>8% |
-
Statistical Tests:
- Kupiec Test: Unconditional coverage (p-value >0.05).
- Christoffersen Test: Independence of exceedances.
- Aggregate Coverage Ratio: Actual exceedances vs. expected (e.g., 95% VaR implies 5%).
-
Visualization:
- Time series: Original vs. Hypo IM.
- Heatmap: Exceedances by risk class/bucket.
- QQ-plot: BTE vs. normal distribution.
3.2 Thresholds and Classification
| Severity | Exceedance Freq. (250 days) | Max BTE | Action |
|---|
| Green | <2% | <5% | Monitor |
| Amber | 2-5% | 5-10% | Investigate |
| Red | >5% | >10% | Escalate/Remediate |
4. Remediation Rules
4.1 Triggers
- Red exceedance or >3 consecutive Amber.
- Model drift: >15% shift in parameter calibrations (vols, corrs).
- Regulatory flags (e.g., ISDA SIMM validation failures).
4.2 Remediation Process
-
Immediate (T+1):
- Halt new IM calls if portfolio BTE >20%.
- Notify Counterparties if bilateral impact.
-
Investigation (T+3):
- Root Cause Analysis (RCA): Data issues? Model params? New products?
- Attribution: Decompose by risk class (e.g., CNQ spreads volatility).
-
Actions:
| Issue Type | Remediation |
|---|
| Data/Feed | Switch providers; enhance QC. |
| Calibration Drift | Recalibrate vols/corrs per ISDA formula. |
| Model Enhancement | Add buckets; approve via MRM. |
| Portfolio-Specific | Threshold IM add-on (e.g., +10%). |
-
Temporary Measures:
- Multiplier uplift (1.1x-1.5x IM).
- Switch to Schedule-based IM.
-
Close-Out: Verified <2 weeks; backtest post-fix for 30 days.
5. Governance
5.1 Roles and Responsibilities
| Role | Responsibilities |
|---|
| Model Risk Management (MRM) | Policy owner; approve calibrations; quarterly reviews. |
| Front Office/Trading | Provide positions; validate Hypo impacts. |
| Risk Management | Daily execution; RCA lead. |
| Operations | Data feeds; computation runs. |
| Compliance | Regulatory reporting (e.g., CFTC Form IM). |
| Senior Management | ALCO approval for material changes. |
5.2 Frequency and Reporting
- Daily: Automated dashboard (Tableau/PowerBI).
- Weekly: Portfolio summary to Risk Committee.
- Monthly: Full report to MRM (exceedance stats, RCA).
- Quarterly: Validation report to Board Risk Committee; ISDA SIMM submission.
- Annual: Full model revalidation; policy review.
5.3 Documentation and Audit
- All runs logged in audit trail (e.g., Collibra).
- Independent Validation: Annual by external consultant.
- Escalation: Red breaches to CRO within 24h.
5.4 Approvals
- Policy: MRM + CRO.
- Calibrations: ISDA governance (if public SIMM).
- Exceptions: Documented with rationale.
Version: 1.0 | Effective Date: [Insert Date] | Review Frequency: Annual