We need to understand the problem. There are n skills. Each skill i has a maximum level h_i (upper bound). The initial level is 0 for all skills. We can spend money (tuition) to increase skill levels: each 1 yen increases level by 1, but cannot exceed h_i. So the cost to get level x_i for skill i is x_i (since each level costs 1 yen? Actually "one level per one yen of tuition", so cost is linear: to achieve level x_i, we need to pay x_i yen, but limited to at most h_i. So cost of skill i is its level, as long as level <= h_i. So total cost sum_i x_i must be <= budget k, with 0 <= x_i <= h_i.
However, there are prerequisites: For each skill i >= 2, there is a prerequisite skill p_i, and we need that the level of skill p_i is at least l_i to be allowed to have skill i at any level? Actually "For taking a course for a skill, except for the most basic course, you have to have at least a certain level of its prerequisite skill." The interpretation: In order to take courses for skill i (i.e., to spend money to increase its level), you must have the prerequisite skill at level at least l_i. But does this apply only to the act of spending, or do we need the prerequisite to be maintained? Typically, if you want to have a certain level of a skill, you must have the prerequisite skill at that level or higher? Actually, the description: "Skills are not independent: For taking a course for a skill, except for the most basic course, you have to have at least a certain level of its prerequisite skill." So to take any course (i.e., to invest in that skill), you need to meet the prerequisite requirement. That likely means that before you can spend any money on skill i, you must have already achieved level at least l_i in skill p_i. Since you can also invest in prerequisite skills first.
But what about the level of skill i itself? Does the prerequisite only affect the ability to train that skill, but once trained, the skill level can be retained even if prerequisite later changes? Since we are only increasing levels (non-decreasing) as we spend money, and we start from zero and we can allocate budget arbitrarily across skills, but respecting prerequisites at the time of investment? Since we can decide order of spending, we must ensure that when we spend money on skill i, prerequisite level is already at least l_i. Since we only increase levels, it's sufficient that by the time we finish, the levels satisfy that for each i (i>1), the level of p_i is at least l_i? Or does the condition need to hold at each moment? Typically in such problems (like skill trees), to invest in a node, its parent must have at least some level. The final levels must satisfy: for each i, x_{p_i} >= l_i? But if we think about it: To take a course for skill i, you need to have at least l_i level in prerequisite. That suggests that you cannot start training i until you have trained p_i to at least l_i. But after training, you might have p_i level even higher. However, if final x_{p_i} < l_i, that would imply you never met the prerequisite, so you couldn't have trained i at all, so x_i must be zero if prerequisite not satisfied? But you might have trained p_i after training i? Not allowed because you need prerequisite before training. So the order matters. But since levels are only increasing, the only consistent final condition is: For each i, x_{p_i} >= l_i if x_i > 0? Actually, if x_i = 0, you didn't invest, maybe you don't need the prerequisite. But can you have level 0? Initially it's 0, and you can keep it 0. So for skill i with x_i > 0, you must have had the prerequisite at least l_i at the time of investing, which implies final x_{p_i} >= l_i (since it's non-decreasing). However, if you invest in skill i and later invest in p_i to bring it above l_i, that's okay because at time of investing in i you needed p_i already >= l_i. So it's possible that x_{p_i} < l_i at the end if you trained p_i after i? No, because you can't train i before p_i meets l_i. So if x_{p_i} ends up less than l_i, you could not have trained i at any point because p_i never reached l_i. Thus, for any skill i with x_i > 0, we must have x_{p_i} >= l_i. If x_i = 0, there's no requirement. But also note: you might have to invest in prerequisite skills even if you don't need them for other skills? But they contribute to competence measure.
Therefore, the problem reduces to: Choose nonnegative integers x_i (0 <= x_i <= h_i) to maximize sum_i s_i * x_i, subject to sum_i x_i <= k (budget) and for each i from 2 to n, if x_i > 0 then x_{p_i} >= l_i. Equivalently, we can think of a directed edge from p_i to i with threshold l_i: to have any positive level on i, we need p_i level >= l_i. But note that the level of i itself does not depend on l_i beyond that? Actually, the prerequisite condition is only about being allowed to take the course; there's no further requirement that the level of i cannot exceed something relative to p_i. So it's a simple threshold.
But is there a more nuanced requirement: "For taking a course for a skill, except for the most basic course, you have to have at least a certain level of its prerequisite skill." Could it be that to take each unit of course (i.e., to increase level by 1), you need the prerequisite at a certain level? Typically in such problems, the prerequisite condition is a one-time requirement: you need a certain level in prerequisite to start learning that skill. But it might also be that you need the prerequisite level at least l_i to have skill i at any level, including level 0? Usually not.
Another interpretation: The skill i can only be raised to a level that does not exceed the level of its prerequisite? But the problem says "at least a certain level of its prerequisite skill" to take a course. So it's like: To take a course (i.e., to spend money on that skill), you must have at least l_i in prerequisite. That condition is independent of how much you invest; as long as you meet it, you can invest arbitrarily up to h_i. So it's exactly as above.
Thus, the constraints define a rooted tree (since p_i < i, it's a tree rooted at 1, with edges from p_i to i). For each node i>1, there is a requirement that if we invest in i (i.e., x_i > 0), then its parent's level must be at least l_i.
We need to allocate budget to maximize weighted sum.
We have n up to 100, k up to 1e5, h_i up to 1e5, s_i up to 1e9, so weighted sum can be large (use 64-bit). Prerequisites are a tree.
We need to compute optimal allocation. This looks like a knapsack-type problem on a tree with dependencies.
Observe: The cost per unit of level is 1 for each skill, but the benefit per unit is s_i. So if we ignore dependencies, we would invest in skills with highest s_i until h_i or budget runs out. But dependencies impose that we cannot invest in a child unless its parent has at least some level l_i. That level may require investment in the parent, which costs money and yields its own benefit. This is reminiscent of "investment in prerequisites" that may be less beneficial but necessary to unlock better skills.
We can think of it as a DP over the tree, where we decide how many levels to assign to each node, with constraints.
Since n is small (100) but h_i and k can be up to 1e5, we cannot have DP states that enumerate levels per node directly. But maybe we can transform the problem.
Let's explore the structure. For each skill i, the condition is: if x_i > 0 then x_{p_i} >= l_i. This can be seen as: x_i > 0 => x_{p_i} >= l_i. This is like an implication. We could also consider that it's always beneficial to have x_{p_i} >= l_i if we want any x_i > 0. So essentially, to invest in child, we need to invest at least l_i in parent (maybe more if we want to also satisfy child's own requirement? But parent requirement is just l_i, not necessarily more). However, if parent also has its own children, there may be overlapping requirements.
One approach: treat the problem as a resource allocation with activation costs. For each node i (except root), there is an activation cost: we must spend at least l_i on its parent before we can spend any on i. But note that spending on parent itself yields benefit and also helps to unlock children. So it's like we need to invest in parents to enable children.
We can consider each node's level as a variable, and the constraint is: x_i > 0 => x_{p_i} >= l_i. This is a non-linear condition. But we could treat the case x_i = 0 separately. It may be easier to think of "unlocking" child: we can choose to unlock it by ensuring parent level >= l_i. If we decide to unlock child, we might invest some amount in child, but we also might invest more in parent anyway.
Perhaps we can model this as a flow or as a DP that chooses which nodes to invest in and how much, considering that parent's level can be used to satisfy multiple children's requirements simultaneously. So parent level must be at least the maximum of l_i among children that we invest in (if we invest in them) and also any requirement from its own children? Actually each child i has its own l_i. If we invest in multiple children of the same parent, the parent's level must be at least max(l_i over children we invest in). Because if we invest in child i, need x_parent >= l_i; if we invest in child j, need x_parent >= l_j. So to satisfy both, we need x_parent >= max(l_i, l_j). Also if we invest in parent itself, that's fine. So parent level must be at least the maximum l_i among its children that we actually invest in (and also at least any l_parent for its own parent). Also, note that we might invest in parent even if we don't invest in any child, for its own benefit.
Thus, the problem becomes: choose a set of nodes to invest in (with levels > 0) and decide how many levels for each, respecting maximum h_i, with the cost sum of levels <= k, and for each node (except root) if we invest in it (level >0), then its parent level must be at least l_i. This can be restated: For each node i>1, either x_i = 0, or x_{p_i} >= l_i.
Now, since the benefit per unit of level is linear, and cost per unit is 1, the optimal allocation for a given set of "active" nodes (nodes with x_i > 0) and given parent level thresholds, will be to allocate levels to nodes in descending order of s_i, but constrained by h_i and also by the threshold constraints? Actually, the constraints are not about allocation ordering; they are just inequalities that must hold. So if we decide which nodes get positive levels, we still need to ensure that for each such node, its parent's level is at least l_i. The parent's level is also a variable we can increase. So it's like we have to satisfy that for each i with x_i>0, x_{p_i} >= l_i. That is a set of inequalities. Since the objective is linear and costs are equal, we could treat this as: we want to allocate levels to maximize sum s_i x_i, subject to sum x_i <= k, and x_{p_i} >= l_i if x_i > 0.
But the condition is not linear because it's conditional. However, we can convert it to a linear constraint by introducing binary variables indicating whether x_i > 0. But maybe we can avoid binary variables by noting that it's never optimal to have x_i > 0 and x_{p_i} < l_i. So any feasible solution automatically satisfies that. So we can simply consider all integer vectors x_i in [0, h_i] with sum x_i <= k and the additional constraints: if x_i > 0 then x_{p_i} >= l_i. However, the set of feasible x is not convex due to the "if". But maybe we can argue that in an optimal solution, either x_i = 0 or x_i is at least something? Not necessarily. Could be that we want to put a small amount on a node with high s_i, but we need to raise its parent to l_i. That might be costly if parent's s_i is low. So we might decide to skip that child entirely if its benefit doesn't justify the cost of raising parent to l_i. So it's a kind of knapsack with activation costs.
We can view the process as: To invest in node i, we must "pay" l_i on its parent (if not already paid) in addition to the cost for node i. But note that parent's levels can be used to satisfy multiple children. So the activation cost for a child is not simply l_i, but the additional cost needed to bring parent to l_i if parent is below that threshold. Since parent level may be increased for its own benefit or for other children, the marginal cost to enable child i is the increase in parent level from whatever it already is to at least l_i, but that increase also yields benefit from parent's s_parent per unit. So it's not a pure activation cost; it's a resource allocation with shared resource.
We can consider the tree DP where we allocate a certain total level to a subtree, and we need to decide the distribution. This is reminiscent of "tree knapsack" or "DP on tree with resource constraints".
Because n is small (100) but k can be up to 1e5, we need DP with dimension up to k, and n up to 100 => total states ~ n*k = 1e7, which might be borderline but possible in C++ if optimized, but we also have to consider that each node may have multiple children, and merging DP's may be O(k^2) if naive. But we can do knapsack merging with O(k * number of children) per node, if we treat each child as an item with cost and value, but children are not independent because we also allocate levels to the parent node itself. Perhaps we can design DP for each node that represents the best total benefit for a given amount of "investment" in that node's subtree, with the condition that the node's own level is at least some value? Or we can treat the parent level as a parameter.
Alternate perspective: The constraints form a rooted tree where each edge (p_i -> i) imposes that the parent level must be >= l_i if child level >0. This is similar to a problem where we have to satisfy "minimum parent level" for each child that is used. This can be handled by DP that, for each node, computes the best result for spending a total cost C in the subtree, given that the node's level is exactly some value L (or at least L). Since the node's level affects both its own benefit and the ability to invest in children. Then we can combine children.
Given n=100, k up to 1e5, we could have DP per node with state (level) from 0 to h_i (but h_i up to 1e5, too large). However, we can compress because we only care about levels up to h_i and also the thresholds l_j for children. The number of distinct relevant level values for a node is limited to the set of thresholds from its children plus possibly its own h_i. Since each node may have up to n children but n is 100, the total distinct thresholds across the whole tree is at most n-1. So for each node, the number of relevant level breakpoints is at most 1 (0) + number of children? Actually, if we decide to invest in children, we need parent level to be at least certain l_i. But we might also consider intermediate levels if we want to allocate parent level for its own benefit. But because the benefit of parent per unit is linear with s_i, any level between thresholds is equivalent in terms of unlocking children? Not exactly: if we set parent level to L, it unlocks all children with l_i <= L. So the set of children that can be invested in depends on L. For a given L, we can invest in any child with l_i <= L, regardless of whether we actually invest in that child. But we also must consider that to invest in a child, we need to pay the cost for that child. So we can think: first decide the level of the parent, then for each child, given that parent level is at least l_i, we may choose to invest in that child. However, the parent level also yields its own benefit s_parent * L. So the total benefit from the subtree rooted at a node, given that we spend cost C within this subtree, and that the node's level is exactly L (cost L for that node, as part of C), and that we can invest in children if we choose. The children themselves may have further dependencies.
Thus we can do DP for each node: For each possible level L for the node (0 <= L <= h_i), we compute the maximum total benefit from the subtree (including this node) for each total cost spent in the subtree, with the condition that node's level is exactly L. Then, for the parent, when combining children, we need to ensure that if a child is to be used, its parent level (which is L) must be >= l_child. But in the child's DP, we would have computed results assuming its own level is something, but the child's DP does not depend on its parent level, except that the child's activation requires parent level >= l_child. Actually, the child's DP is independent of parent; it only depends on its own parameters and its children. However, the condition for the child to be investable is that parent level >= l_child. So when we attach a child to the parent, we need to check if L >= l_child; if not, we cannot invest anything in that child's subtree (i.e., we must force that child's subtree cost is 0 and benefit 0). So at the parent combination step, we need to consider for each child, depending on L, whether it's available. If available, we can choose to allocate some cost to that child's subtree and get benefit. So the DP for a node must consider all possible L and for each L, we will combine children with availability constraints.
But the DP's state size per node: we need to consider all L from 0 to h_i (which could be up to 1e5). That's too large if we do for each node. However, note that h_i could be up to 1e5, and n up to 100, total possible L across nodes could be huge, but maybe we can compress because we only need to consider L values that are either 0 or some thresholds among its children, or the maximum h_i. Because for values between two consecutive thresholds, the set of available children is the same (those with l_i <= that L). Since the benefit from the node itself is linear in L, the optimal solution for a given total cost may not need to consider every L; we can treat L as a variable and perhaps optimize using convexity? The node's own benefit is linear: s_i * L, cost L. So it's always beneficial to increase L if we have spare budget and if it doesn't affect children? But increasing L also may unlock more children, which could be beneficial. So the decision of L is discrete: either 0, or some l_i values (thresholds), or h_i. Actually, suppose we consider a node. For a given budget allocation to its subtree, we need to decide L. The benefit from the node is s_i * L. For children, if we increase L beyond a threshold, additional children become available, which may increase the potential benefit. So the optimal L is likely to be one of the thresholds (including 0 and h_i). But also maybe we might choose L to be exactly some value to spend leftover budget on the node itself if s_i is high, but we can always increase L up to h_i as long as budget allows. But if s_i is low, we might not want to increase L beyond what is needed to unlock children. So indeed, we only need to consider L being either 0, or one of the l_i values of its children, or h_i (but note that if h_i is less than some threshold, that threshold may be unreachable). More formally, the set of children that can be used is determined by the condition L >= l_child. So as L increases, more children become available. Since the benefit from node itself is linear, the optimal L for a given total cost in the subtree will be either the minimum L needed to unlock a certain set of children, or the maximum possible h_i if we have extra budget after allocating to children and node's own benefit is positive. But if s_i is positive (which it is, since s_i >= 1), then it's always beneficial to spend any leftover budget on increasing the node's level, because it gives positive benefit per unit cost. However, there is an upper bound h_i. So if we have budget left after allocating to children and to node's own level needed for unlocking, we would always increase node's level up to h_i, as long as s_i > 0. So the optimal L will be either: we set L to some value L0 (maybe the maximum needed to unlock chosen children) and then we might add extra levels on top of that if we have budget, up to h_i. That extra part is independent: it's just linear increase. So we can separate: For a node, we can think of "base level" that is needed for unlocking children (or could be 0), and then "extra level" that is just spending on node for its own benefit. Since the extra level is linear with coefficient s_i, we can treat it as we can always spend additional budget on node to get s_i per unit, up to remaining capacity and h_i - base level.
Thus, the DP can focus on the "base" part: we decide which children to invest in and how much to invest in them, and also decide a base level L_base that must be at least the maximum l_i among those children we actually invest in. Then we can add extra levels to the node up to h_i, costing extra and giving s_i per unit.
Now, what about children that we don't invest in? They contribute nothing, and impose no requirement on L. So L_base only needs to be at least the maximum l_i among children we actually use.
Therefore, the problem for each node becomes: Choose a subset of its children to activate (i.e., invest positive amounts in those subtrees), and for each activated child, allocate some budget to that child's subtree (which will yield some benefit). The node itself must have level at least L_min = max_{activated children} l_i. Also, the node can have additional levels beyond L_min, which give s_i per unit. The node's own cost for base level is L_min (or maybe we can have level exactly L_min? But we could set node's level exactly L_min to satisfy all activated children; increasing beyond L_min is extra). Also, we could choose to set node's level higher than L_min even if no children are activated, for its own benefit.
But careful: The node's level is a single integer; if we set level = L_min, that costs L_min. Then if we add extra, cost increases accordingly. So total cost for node = L_min + extra, where extra >= 0 and L_min + extra <= h_i.
Now, the children's subtrees themselves have their own dependencies. So it's a tree DP.
We can define for each node i, a DP function f_i(c) = maximum total benefit obtainable from subtree rooted at i, given that we spend exactly c (or at most c) in that subtree, and that node i's level is at least something? Actually, we need to incorporate that node i's level is chosen as part of the cost. But to make merging easier, we can define DP that returns the best benefit for a given total cost spent in the subtree, with the condition that node i's level is exactly something? Or maybe we define DP that returns the best benefit for each possible amount of "investment in the subtree excluding the node's own level"? That seems messy.
Alternatively, we can do a DP that considers the node's level as a parameter, and then combine children using knapsack. Since n is 100 and k is up to 1e5, we could afford O(n * k^2) perhaps? Not if k=1e5 (k^2=1e10). So we need O(n * k) or O(n * k * something small). With tree DP merging, typical approach: for each node, we compute an array dp[0..k] representing the maximum benefit from that subtree given total cost (including node's own level). We start from leaves, and then for internal nodes we combine children. But the complication is the dependency: the node's level must be at least thresholds of children that we include. However, we can incorporate that by considering that when we decide to include a child's subtree, we must also pay for the node's level to be at least l_child. This is like an "activation cost" on the node that depends on which children are selected.
Idea: We can treat each child as an item that, if taken, requires an additional cost on the node (raising node level to meet its l). But the node's level cost is shared among all children. So we can think of the node's level as a resource that serves two purposes: provides its own benefit, and unlocks children. The cost to unlock a set of children is the maximum of their l values (since we need node level >= that max). So we can treat the node's level decision as: we pay a base cost equal to the maximum l among selected children (or 0 if none selected), and then we may add extra levels for own benefit.
Thus, when combining children, we need to decide which subset of children to include, and then the node's base cost is the max l among them. Then we add children's costs.
This is reminiscent of DP with "group knapsack" where each group (child) has multiple options (how much cost to allocate to that child's subtree, and benefit). But additionally, there is a requirement on the node's level based on which children are taken.
One approach: For each node, compute a DP array representing maximum benefit for a given total cost, where we consider the node's level variable. We could iterate over possible node level L (from 0 to min(h_i, k)). For each L, we can compute the maximum benefit from children that are allowed (those with l_child <= L). For those allowed children, we can decide how much to invest in each child's subtree. This is a knapsack problem over children with each child having a DP function g_child(c) (maximum benefit from that child's subtree for cost c), but note: if L < l_child, we cannot invest in that child at all, so g_child is unavailable. So for fixed L, we need to combine the children's DP's via knapsack merging (convolution) and then add the node's own benefit s_i * L, with cost L. Then we take the maximum over L. So for node i, we compute:
dp_i[t] = max_{0 <= L <= min(h_i, t)} [ s_i * L + (max benefit from children given L and total cost t - L from children) ].
Where the max benefit from children given L is computed by combining the DP arrays of children with l_child <= L (children with l_child > L contribute zero). The combination is: start with an array child_dp[0] = 0, then for each allowed child j, we do knapsack: new_dp[c] = max_{c' + c_j = c} (old_dp[c'] + dp_j[c_j]) for c_j from 0.. (some bound). dp_j is the DP for child j representing the maximum benefit from its subtree for cost c_j (including child's own level costs). For child j, dp_j already accounts for all its subtree. This is typical tree DP.
Thus, if we can compute for each node a dp_i array of length k+1, and if for each node we iterate over L from 0..min(h_i, k), and for each L, we need to combine children DP's (only those with l_j <= L). That would be: For each node, for each L, we do knapsack merging over its allowed children. But merging for each L separately could be costly: number of children times number of L times k^2? But we can optimize: The set of allowed children changes only when L crosses a child's l value. So we can process L in increasing order and incrementally add children as L reaches their l thresholds. Then we can update the combined children DP incrementally. This is similar to knapsack on a tree with an added dimension of L.
Specifically, we can do:
-
For node i, first compute DP for children (dp_j) recursively.
-
Then, we want to compute dp_i.
We can sort children by their l_j (threshold). Then we consider L ranging from 0 to h_i (capped at k). For each L, the set of allowed children is those with l_j <= L.
We can start with an array cur[0..k] representing the maximum benefit from already processed children (none initially, so cur[0]=0, others -inf). As we increase L, when we reach the next child's threshold, we incorporate that child's dp_j into cur via knapsack convolution. However, the knapsack convolution (bounded? Actually child DP is a function over cost; we need to combine like: new_cur[c] = max_{c1 + c2 = c} (cur[c1] + dp_j[c2]). This is convolution (max-plus). This is O(k^2) per child if done naively. But we can do it in O(k * K_child) but K_child is also up to k, so it's O(k^2) per child. With n up to 100 and k up to 1e5, O(n * k^2) is impossible.
We need a more efficient merging. Since each child's dp_j is a concave? Not necessarily; it's the result of a knapsack, but generally it's arbitrary. However, we can note that dp_j[c] is the maximum benefit for cost c in that subtree. This function is non-decreasing in c (since we can always not spend all? Actually, if we define dp_j[c] as maximum benefit for exactly cost c, we need to be careful: we can have better benefit with less cost? Usually we want dp for at most cost, to have monotonicity. But typical knapsack DP uses exactly cost or at most. For merging, it's easier to use "max benefit for exactly cost c", then after merging we can take prefix max. But monotonicity helps for optimization.
But still O(k^2) per merge is too high.
We need to reduce complexity. Possibly, we can note that total sum of h_i? Not relevant.
Another thought: Since each skill's level cost is linear and benefits are linear, and the constraints are simple, maybe we can transform the problem into a flow/min-cut or maximum weight closure of a directed graph? Because it resembles a kind of "precedence" constraints: you can only invest in a skill if its parent has at least l_i. But the parent's level is continuous. However, we could treat each unit of level as a separate item? For each skill i, you can purchase up to h_i levels. But for level t (1 <= t <= h_i), purchasing the t-th level may require that the parent skill has at least some threshold? Actually, the condition is: to purchase any level of skill i, you need parent level >= l_i. This is a single threshold, not per level. So once you have paid the "activation cost" of raising parent to l_i, you can purchase any number of levels of i (up to h_i). So it's like a fixed cost to unlock a skill, then each level gives benefit s_i at cost 1. The activation cost is not a separate cost; it's part of parent level, which also gives benefit s_parent per level. So it's like we invest in parent; that investment both yields its own benefit and may unlock children. This is similar to a "tree knapsack with activation thresholds".
We can model each skill i as having an "activation" requirement: need at least l_i levels in parent. If we meet that, we can invest in i. So it's like a "prerequisite" that can be satisfied by investing in parent.
We could treat this as a DP with "dp[i][c]" representing the maximum benefit from the subtree rooted at i, assuming that we have already satisfied the prerequisite for i (i.e., its parent level is sufficient), but we also need to include the cost of i's own level. However, the requirement for children is based on i's level. So we need to decide how much we invest in i, which determines which children can be activated.
Maybe we can do DP with state being the amount spent on the node itself. Since the number of possible levels for a node is up to h_i, but h_i can be up to 1e5, and n=100, total DP size could be sum over nodes of (h_i+1) if we store per node an array of length h_i+1 for each possible level? That might be too big if many nodes have large h_i. But we can compress: For each node, the relevant levels are only the distinct l values of its children (and 0 and h_i). The number of children per node is at most n-1, but across all nodes total distinct l values is n-1. So the number of relevant "breakpoints" for a node is at most deg(i) + 2 (including 0 and h_i). However, even if we store dp per node for each of these breakpoints, we still need to combine children with cost dimension. The cost dimension is up to k (1e5). For each node, we might need to compute DP for each possible level L that is a breakpoint. Since the number of breakpoints per node is small (<= degree+2), and total breakpoints across all nodes is O(n) = 100, that's fine. So we can compute for each node, for each possible level L among a small set, the maximum benefit from its subtree given that node's level is exactly L (or at least L? we need careful). Then for the parent, when considering this child, the child's contribution depends on the parent's level being at least l_child. If we have dp_child[L_child] for each possible L_child? Actually child's own DP should be independent of its parent's level, except that the child can only be used if parent level >= l_child. Once that condition is satisfied, the child can be allocated some budget; its own level can be chosen arbitrarily (subject to its max and its own children's thresholds). So for child j, we need to know, for any total cost c allocated to its subtree, what's the maximum benefit. That's exactly dp_j[c] we earlier considered, which does not depend on parent level. So the dependency is only on whether the child is allowed: if parent level >= l_j, then we can spend any amount on child's subtree (including zero) and get benefit according to dp_j; if parent level < l_j, then we cannot spend anything on child's subtree (i.e., we must set cost for child to 0, benefit 0). So for parent with level L, the set of children that are "available" are those with l_j <= L.
Thus, we do not need to precompute child's DP for different levels of parent; we just need one DP per child: the maximum benefit for each cost, assuming the child is available (i.e., its prerequisite is satisfied). Because if the parent level is high enough, the child can be used; otherwise it cannot. So dp_child[c] is defined under the condition that its prerequisite (parent level >= l_j) is satisfied. But wait: The child's own DP must also enforce its own children's prerequisites based on its level. But that's internal to the child. So we can compute dp_j as the maximum benefit from subtree of j, assuming that the prerequisite for j is satisfied (i.e., its parent level is at least l_j). However, note that when computing dp_j, we need to know that j's own level can be chosen, and that will affect its children. But we don't have any external constraint on j's level except its own maximum h_j and that we must spend at least something? Actually, the only external requirement is that its parent level >= l_j; once that is satisfied, j can be any level from 0 to h_j. So dp_j can be computed independently, as if it were a root of its own subtree, with no prerequisite constraints, except that it can only be used if its parent meets l_j. So we can compute dp_j for all costs (including cost for j's own level and its descendants) that yields maximum benefit. This is exactly the DP we need for each node, assuming it's "available". But careful: dp_j includes the cost and benefit of node j itself. So if we decide to allocate some budget to child j, we will get benefit according to dp_j[c] for some c. But dp_j might have scenarios where j's level is zero? That's allowed; if we don't spend on j, benefit 0. But dp_j[0] should be 0 (since no cost, no benefit from that subtree). So we can treat each child as an item with a set of possible (cost, benefit) pairs (from its DP). And we can choose to allocate any cost to it, getting corresponding benefit. And this is only allowed if the parent level L >= l_j.
Thus, our earlier approach of for each node i, for each possible L, we combine children with l_j <= L using knapsack over their DP arrays, and then add s_i * L (cost L). This seems correct.
Now the challenge is efficiency: we need to compute dp_i for all costs up to k. For each node i, we need to combine children's DP arrays. If we do a standard knapsack merge (like each child is a group where we can choose any cost allocation), the time per node is O(k * total_children_cost_range) but actually merging DP of children sequentially using convolution of arrays of size k+1 is O(deg(i) * k^2) if done naively (for each child, for each total cost from high to low, for each possible cost allocated to the child). But we can use the technique of "knapsack on tree" where we treat each child as an item with many choices (each possible cost yields a benefit). That's a "multiple-choice knapsack" where each child j provides a set of options: cost c, benefit dp_j[c] for c from 0..k (but dp_j is an array, so effectively infinite choices). Merging such a child into a current DP is a convolution: new_dp[t] = max_{c=0..t} (old_dp[t-c] + dp_j[c]). This is a classic "max-convolution" problem, which can be done in O(k^2) per child, or using optimization if dp_j is concave/convex. But here dp_j is not necessarily concave; it's the result of similar merges. However, note that costs are integers and values are large, but we may be able to do it with O(k * m) where m is the number of children? Actually typical tree DP for knapsack: for each node, we maintain a DP array initially dp[0]=0, others -inf. Then for each child, we do:
for t from current_max_down_to_0:
for c from 0..k - t:
new_dp[t+c] = max(new_dp[t+c], dp[t] + child_dp[c])
But that's O(k^2) per child if we iterate c up to k. However, we can bound the total cost allocated to a subtree by the sum of h's along that subtree, but that could still be large (up to n * max h = 1e7). But k is up to 1e5, so worst-case O(n*k^2) = 100 * 1e10 = impossible.
We need a better approach. Maybe we can exploit the fact that each node's own cost (its level) is linear and can be separated? Another direction: Since each skill's benefit per cost is constant (s_i), the problem might reduce to selecting a set of "units" of levels subject to constraints that for each skill i, the number of units taken from i cannot exceed h_i, and if we take any unit from i (i>1), then we must have taken at least l_i units from its parent. This is like a matroid or something? But it's not a matroid because constraints are not linear matroid? However, this is a kind of "precedence constraints" on items: each unit of skill i is an item with weight 1 and value s_i, but there is a condition that for any unit of i to be taken, we must have taken l_i units of its parent. But since the parent's units are also items, this is similar to a tree of items with "precedence" where taking a certain number of child items requires having taken a certain number of parent items. This can be modeled as a flow problem: treat each unit as a node with capacity? But number of units could be up to sum h_i which could be up to 1e7 (since n=100, each h_i up to 1e5 => total up to 1e7). That's too many for flow.
But perhaps we can use a greedy approach: Since each unit yields benefit s_i, and the constraints are that for skill i, you can only take its units after you have taken at least l_i units of its parent. This is like a "nested" resource allocation. The optimal solution is to take units in decreasing order of s_i, but subject to that you cannot take a unit of i until you have taken l_i units of its parent. This is similar to a "priority queue" where we consider unlocking nodes as we invest in parents. But note that the parent's own units also have value s_parent. So the decision is: to get high s_i units, you might need to invest some lower s_parent units first. This is reminiscent of a "project selection" or "budget allocation with prerequisites" that can be solved via a variant of knapsack with tree dependencies.
We can think of it as: We have a rooted tree. For each node i, we have h_i copies of an item with value s_i. However, to take any copy of node i (i>1), we must have taken at least l_i copies of its parent. But we can take copies of parent first. The order of taking items matters only that the prerequisite count must be satisfied before taking child items. Since all items have linear value and unit cost, the optimal strategy is to take items in order of descending value, but respecting that before taking a child item, we must have enough parent items. This is analogous to a "priority queue" where we can only take a child after a certain number of parent items. But is it optimal to simply always take the highest value available item whose prerequisites are satisfied? Let's test with a simple case: parent p with s_p = 1, h_p = 10, l_i = 5 for child i with s_i = 100, h_i = 1. Budget k=6. Greedy by value: The best item is child i (value 100) but we need 5 parent items first. So we take 5 parent items (value 1 each, total benefit 5) then child (value 100), total 105. Could we do better by taking more parent items? No, because we have budget 6, after taking 5 parent and 1 child, we have used 6, benefit 105. If we took 6 parent items, benefit 6, worse. So greedy works. But consider parent s_p=10, child s_i=9, l_i=5, budget k=5. Greedy by value would take parent items first because 10 > 9. But after taking 5 parent items, we have spent all budget, benefit 50. However, if we instead take 5 parent items? Actually we need at least 5 parent to unlock child, but if we take 5 parent, we have no budget left for child. If we take 4 parent and then can't take child. So 5 parent is optimal. But what about s_p=10, s_i=9, l_i=5, budget k=6. Options: 5 parent + 1 child = 510+9=59; 6 parent = 60; So better to take 6 parent. Greedy by value would take parent items first (value 10) until maybe it becomes beneficial to switch? A simple greedy that always picks the highest value among available items might do: Initially only parent items available (since child requires 5 parent). So pick parent (10). After 1 parent, still only parent available. After 4 parent, still only parent. After 5 parent, now child becomes available (value 9). Now we have parent value 10, child value 9. Next pick parent (10) -> total benefit 60 with 6 items. That's optimal. So greedy by picking highest value among currently available items (with prerequisites satisfied based on counts so far) might be optimal? Let's test more complex tree with multiple children. For example: root with s=1, h=10; child A with s=100, l=5; child B with s=90, l=8; budget k=9. Options: To unlock A need 5 root, to unlock B need 8 root. Greedy: start picking root (1) until either A or B becomes available. After 5 root, A available (value 100) vs root (1). So pick A (100). Now we have 6 items: 5 root + 1 A. After that, A still has more items? h_A maybe big. Suppose h_A=2, h_B=2. After picking one A, we could pick another A (value 100) still available, but we need to check if any additional root requirement? No. So next pick A (100) again, if budget allows. With k=9, we could do: 5 root, then 2 A, then 2 root? But after picking 2 A, we have used 7 items. Then we have 2 more budget: root (1) or maybe B (90) but B requires 8 root; currently root count=5, so B not available. So best is to pick root (1) for remaining. Total = 51 + 21 = 5+200+2=207. Alternatively, we could invest more in root to unlock B: e.g., 8 root, then 1 B (90) -> 8*1+90=98, worse. Or 8 root, 1 A (100) -> 8+100=108, worse. Or 8 root, 1 A, 0? Actually with 9 budget: 8 root + 1 A = 108; 5 root + 4 A? But h_A=2, so max 2 A. So 5 root + 2 A + 2 root = 207 as above. So greedy seems good.
But consider overlapping prerequisites: root with s=1, child A (s=100, l=5), child B (s=99, l=5). Both become available after 5 root. Suppose h_A=1, h_B=1, root h=10, budget k=6. Greedy: after 5 root, both A and B available. Greedy picks the highest value, say A (100) then next picks among highest: B (99) but we have only one left budget? Actually budget 6: we have spent 5 root, left 1, can pick either A or B, both cost 1, pick A (100) => total = 5+100=105. But maybe we could do 5 root + B (99) = 104, lower. So 105 is best. Could there be a scenario where picking a lower value item now allows unlocking of even higher value items later? That's the classic issue with prerequisites. But here unlocking is based solely on counts of parent items, not on which child items you pick. So the unlocking condition is monotonic: as you invest more in a parent, more children become available (when parent count reaches certain thresholds). The thresholds are fixed. So the order of picking items among siblings doesn't affect unlocking of others because unlocking only depends on parent count. So the optimal strategy might be to invest in parent until some thresholds are reached, then invest in children, possibly mixing. Since all items have constant value per unit, the optimal allocation is to allocate budget to items in order of their value, but we must respect that some items (child items) cannot be taken until we have taken a certain number of parent items. This is exactly a problem of "resource allocation with precedence constraints" that can be solved by a priority queue that always picks the item with highest value among those currently available, where an item becomes available when its prerequisite count is met. Because each item is independent and each unit of each skill is identical, the only constraint is that for each child skill, the first unit of that child can be taken only after we have taken at least l_i units of the parent, and similarly for second unit? The problem statement: "For taking a course for a skill, except for the most basic course, you have to have at least a certain level of its prerequisite skill." It says "taking a course for a skill" – it might imply that to increase the skill level by any amount, you need the prerequisite at level at least l_i. So the condition is for any positive level, not per unit. So once you have taken l_i levels of the parent, you can take any number of levels of the child (up to h_i). So it's a one-time unlock. Thus, the child's items become available all at once after the parent reaches l_i. So it's not that each child unit requires an additional parent unit; it's a threshold. So the unlocking is: once we have allocated at least l_i to parent, we can allocate any amount (up to h_i) to child. That's a "lumpy" prerequisite.
Thus, the items are: For each skill i, we have up to h_i units, each with value s_i, and there is a requirement that before taking any unit of i (i>1), we must have taken at least l_i units of its parent. This is a kind of precedence constraint that can be modeled as: All units of child i are blocked until we have taken l_i units of parent.
This is similar to a "nested" knapsack where we have a tree and each node has a "cost" (which is the number of units) and a "profit" per unit, and there is a minimum investment in the parent to unlock the child.
Given that each unit is identical, the optimal solution is to consider all units sorted by profit, but subject to the constraint that for a child unit to be taken, at least l_i units of the parent must have been taken before it. This is reminiscent of scheduling with precedence constraints, but here we can take items in any order as long as when we take a child unit, the parent has accumulated at least l_i units (not necessarily before that exact unit, but overall at that moment). Since we can take parent units later as well? Wait, the condition is: to take a course for a skill (i.e., to increase its level), you have to have at least a certain level of its prerequisite skill at that moment. So if we try to take a child unit before we have taken enough parent units, it's not allowed. But we could take parent units later, but then the child unit would have been taken earlier when the parent level was insufficient, which is not allowed. So the order matters: at the time we take a child unit, the parent must already have level >= l_i. So we can interleave taking parent and child units, but the parent level must meet the threshold before any child unit is taken. So we could first take some parent units, then some child units, then more parent units, then more child units? That's allowed because after we have taken enough parent units to meet l_i, we can take child units at any later time, even if we later take more parent units. So the unlocking is permanent after the threshold is reached.
Thus, the set of child units can be taken only after we have already invested at least l_i in the parent. So the sequence must satisfy that the total number of parent units taken before each child unit is at least l_i. That is equivalent to: In the sequence of item selections (each selection adds one level to some skill), for any child i, the first selection of a unit of i must occur after at least l_i selections of its parent have occurred (not necessarily contiguous). Since all parent selections count toward that. And after that, we can select more child units, even if we haven't selected more parent units, because the condition only requires the prerequisite level at the time of taking the course, which is the current parent level. So as long as the parent level at that moment is >= l_i, it's fine. Since parent level never decreases (we only add), once it's >= l_i, it stays >= l_i. So child units can be taken at any time after that point. So the unlocking is permanent.
Thus, the optimal strategy is: decide an order of taking units such that for each child i, we do not take any unit of i until we have taken at least l_i units of its parent. Since all units are identical within a skill, the optimal order will be to take units in decreasing order of value, but we may need to take some lower-value parent units earlier to unlock higher-value child units.
This is similar to a "priority queue with unlocking thresholds". We can think of it as we have a set of items, each with value, and some items are initially locked. By spending some budget on lower-value items (parents), we unlock higher-value items. This is like a "rescue" problem or "investment" problem. Usually, the optimal solution can be found by a greedy algorithm using a priority queue that repeatedly selects the available item with highest value, and when an item is selected, it may unlock new items. However, unlocking conditions here are not per-item but per-skill: once we have taken l_i units of parent, all h_i units of child become available. So we can think of each skill i as having h_i copies of an item with value s_i, and they become available only after we have taken at least l_i copies of its parent. Also, note that taking parent units also might unlock multiple children at different thresholds (since children may have different l_i). So this is like a "nested knapsack" where items become available as we take other items.
Because all costs are 1 per unit, the problem reduces to selecting up to k items (units) from a set of items (each unit is a copy of a skill) with values s_i, subject to the constraint that for any child skill i, the number of selected units from i cannot exceed h_i, and the number of selected units from parent p_i must be at least l_i if any unit from i is selected. However, is it sufficient to require that if x_i > 0 then x_{p_i} >= l_i? Yes. So it's exactly that.
Now, since each unit of a given skill has identical value, the selection problem is: choose integers x_i in [0, h_i] maximizing sum s_i x_i subject to sum x_i <= k and for each i>1, if x_i > 0 then x_{p_i} >= l_i. This is a combinatorial optimization with n up to 100, k up to 1e5, h_i up to 1e5, s_i up to 1e9.
We can try to solve via DP on tree using the "knapsack with groups" but with the additional requirement that for a child to be used, the parent must have at least l_i. However, the requirement is only if x_i>0; if x_i=0, no requirement. So it's like a "group activation" condition.
One approach: Transform the problem into a rooted tree where each node i has a "activation cost" of l_i that must be paid in its parent's allocation. But because the parent's allocation also gives benefit, it's not a simple activation cost.
We can treat the decision of how much to allocate to each node as a kind of "resource allocation" that can be solved with DP that enumerates the amount allocated to the node, but we can use a technique to reduce the state space by noting that the benefit per cost is constant, so the DP might be convex or something.
Observation: For each node, if we decide to allocate some amount to its subtree, the optimal way to distribute that amount between the node and its children can be determined by considering that the node's own units have value s_i, while children's units may have higher values but require that the node has at least some threshold. This is reminiscent of a "knapsack with nested items" that can be solved by a greedy merge of sorted lists: we can think of each node as offering a multiset of "efficient" ways to spend budget, perhaps through a "knapsack with convexity" where we can use a priority queue to combine.
Given the small n (100) but large k (1e5), maybe we can do DP with O(n*k) using a technique like "knapsack on tree with bounded items" where each node's contribution is like an item with a weight (cost) and value, but the node's own level is like a continuous item. Actually, each node i has h_i units, each with value s_i. But also, these units have dependencies: you cannot take any unit of i unless you have taken at least l_i units of its parent. This is like a precedence constraint that can be modeled as: For each child i, there is a "minimum purchase" on parent before any purchase on child.
We could treat the tree as a series of "layers" and use a DP that processes nodes in topological order. But the tree can be arbitrary.
Another idea: Since each node's units are identical, the optimal solution will allocate levels in a "monotone" way: For each node, either we allocate 0 or some amount up to h_i. Because of linearity, if we allocate any positive amount to a node, we would allocate as much as possible to nodes with higher s_i, subject to budget and constraints. This is like we want to select a set of units (items) with highest values, but constrained by the prerequisites.
One can think of it as: we have a set of items (unit of skill i). However, the prerequisite constraints mean that the set of items we can select must be "downward closed" with respect to a certain partial order: For each child i, if we select any copy of i, we must select at least l_i copies of its parent. This is similar to a "laminar" constraint. This might be representable as a matroid intersection? Possibly a knapsack with precedence constraints can be solved by a greedy algorithm if the precedence constraints form a tree and the values are monotone? But not always: Example where parent has low value, child has high value but requires a high threshold, and there is a sibling with medium value. We need to decide how many parent units to take before unlocking child.
Consider this: root s=1, h=10; child A s=100, l=5, h=5; child B s=90, l=5, h=5. Budget k=9. The optimal is to take 5 root, then all 5 of A? But we only have budget 9, so 5 root + 4 A? That yields benefit 5+400=405? Wait s=100, 4*100=400, total=405. But if we take 5 root + 5 A = 5+500=505, but that's 10 >9, not allowed. So with 9, we can take 5 root + 4 A = 405. Alternatively, 5 root + 4 B = 5+360=365. Or 5 root + 3 A + 1 B = 5+300+90=395. Or 8 root + 1 A = 8+100=108. So best is 5 root + 4 A. This is consistent with picking highest value items among available: after taking 5 root, both A and B become available with values 100 and 90. So we should take as many A as possible, then if budget left, take B. So greedy after unlocking seems fine.
Now consider scenario with two levels: root (s=1, h=10) -> child A (s=100, l=5, h=5) -> grandchild C (s=1000, l=3, h=1). Budget k=9. To unlock A we need 5 root. To unlock C we need 3 levels in A (since prerequisite of C is A with l=3). So after taking 5 root, we can take A units. But to take C, we need at least 3 A. So we need to invest in A to unlock C. The values: C is 1000, A is 100, root is 1. Budget 9. Strategy: To get C, we need at least 3 A and also the 5 root (to unlock A). So minimal cost to get C: 5 root + 3 A + 1 C = 9, benefit = 5+300+1000=1305. If we instead do 5 root + 4 A = 5+400=405, less. So optimal is to get C. Greedy by highest value among available items: Initially only root (1). We need to decide how many root to take. Greedy would always take the highest value available. After taking 5 root, A becomes available (100). Now compare root (1) vs A (100), so pick A. After taking 1 A, root still available (1) but A still has higher value (100). So next picks: A (100) again. After 2 A, still A (100). After 3 A, now C becomes available (1000). Then we would pick C (1000) next. So sequence: pick 5 root (1 each), then 3 A (100 each), then 1 C (1000). That's 9 items, exactly the optimal. So greedy works.
Now try to break greedy: Suppose root s=1, h=10; child A s=3, l=5, h=10; child B s=2, l=6, h=10. Budget k=8. Greedy: initially root (1). After 5 root, A available (3). Now highest is A (3). Pick A, then root still 1, A still 3, B not yet (needs 6 root). After 5 root + 1 A, we have used 6, budget left 2. Options: root (1), A (3), B not yet (since root count=5, need 6). So pick A (3) again. Now used 7, left 1: can pick A (3) or root (1). Pick A (3) -> total 5 root + 3 A = 5 + 9 = 14. Alternative: maybe we should have taken more root to unlock B earlier? If we took 6 root first (instead of taking A early), then after 6 root, both A and B become available (since A needs 5, B needs 6). Then we have budget left 2. We could take two B's (value 2 each) or two A's (3 each) or mix. Best: take two A's: total = 6 root + 2 A = 6 + 6 = 12, worse than 14. If we take one B and one A: 6+3+2=11. So greedy gave better. What if B had higher value than A but requires more root? root=1, A=3 (needs 5), B=4 (needs 6). Budget=8. Greedy: start root until A available (5 root). Then pick A (3) because 3 > 1. After 5 root + 1 A, used 6, left 2. Now available: root(1), A(3), B not yet (need 6 root, we have 5). So cannot pick B. So pick A (3) again -> used 7, left1: pick A(3) -> total 5+33=14? Actually 51 + 3*3 =5+9=14. Alternative: take 6 root first, then B's: 6 root + 2 B =6+8=14. Same. Or 6 root + 1 B + 1 A =6+4+3=13. So tie. Greedy works.
Consider case where unlocking a child requires a lot of root, and child value only slightly higher than root, and there is a limit on root (h_root) and child (h_child). Could it be that it's better to not unlock child at all? Greedy would still consider after unlocking, child items become available and may be chosen if they have higher value than root. But if child value is only slightly higher, unlocking might be worth it only if we have enough budget to take many child items. But greedy might unlock early and then take a few child items, but then run out of budget before taking enough child items to recoup the cost of extra root investment. But since unlocking cost (the extra root levels needed to reach threshold) also give benefit (since root items have their own value), the decision to unlock is essentially: Should we invest in root beyond some point to gain access to child items? The greedy algorithm that always picks the highest value available at each step automatically accounts for the cost of unlocking because to make child items available, you have to pick root items first (since they are the only available items until threshold). So the algorithm naturally picks root items until child items become available if child items have higher value. But if child items have value only slightly higher than root, after unlocking, the algorithm will pick child items because they are higher, potentially leaving root items unpicked that could have been picked instead if we didn't unlock. But is that suboptimal? Let's construct a counterexample.
Root: s_r=1, h_r large (say 100). Child: s_c=1.1, l_c=10, h_c=1. Budget k=10. Options:
- Don't unlock child: take 10 root => benefit 10.
- Unlock child: need at least 10 root to unlock, but we have exactly 10 budget. If we take 10 root, we unlock child but have no budget left for child, benefit 10. So same.
But if budget >10: say k=11. Options:
- 11 root => 11.
- 10 root + 1 child => 10 + 1.1 = 11.1, better.
Greedy: initially only root (1). It will take root items because child not available. After 10 root, child becomes available with value 1.1. Then next pick, compare root (1) vs child (1.1), picks child => total 10 root + 1 child = 11.1. That's optimal.
Now consider scenario where child value is higher but only a limited number of child items available, and unlocking requires many root items. Budget limited so that after unlocking, we may only take few child items, and the benefit from those may not offset the opportunity cost of taking root items that are lower value. However, root items themselves give benefit, so the unlocking cost is not lost; it's just that we are forced to take root items instead of something else. But if we didn't unlock, we could take other items? In a tree, there might be other branches with high value. But the greedy picks the highest value among all available items at each step. Could this lead to prematurely investing in a low-value branch to unlock a high-value child, but there is another branch with medium value that could be taken immediately without unlocking cost? The greedy would compare immediate values; but unlocking requires taking lower-value items first. At the moment when only root is available, its value is low; other branches might be available only after some root investment. So if there are multiple children with different thresholds, the algorithm will invest in root until the highest value item among all available (including root) is something else. So it seems plausible that the greedy algorithm that at each step picks the item with highest s_i among those that are currently "available" (i.e., whose parent has reached its required level given the current levels) is optimal. This is analogous to a problem of scheduling with precedence constraints where all tasks have unit processing time and you want to maximize total weight of tasks completed by a deadline, given that tasks have prerequisites that must be completed before they can start. But here, the prerequisites are not "all predecessor tasks must be done", but rather "parent must have at least l_i units". This is similar to: each unit of parent is like a task that unlocks the ability to do child tasks after l_i of them are done. That's a bit like having a threshold.
This resembles the problem of "resource allocation with nested unlocking" which can be solved by a priority queue based on marginal value, and I suspect it's optimal because all items have equal cost and linear values, and the unlocking condition is monotone. This is similar to the idea of "priority queue with prerequisites" known as the "lawler's algorithm" for scheduling with precedence constraints? Actually, there is a known result: For maximizing sum of weights of tasks subject to precedence constraints where each task has unit processing time and you can do at most one per time, and you have a time limit, the optimal schedule is to always do the available task with highest weight (this is just a greedy for scheduling with precedence constraints? Not exactly, because precedence constraints can cause that doing a high-weight task early might block others? But in that scheduling context, the greedy is not optimal generally; you need to consider reverse order. However, in our setting, we have unlimited parallelism? No, we are just selecting a set of items (units) up to k, and the only constraint is that for any child item selected, at least l_i parent items must be selected (but they could be selected later? Wait the order condition: we must have selected l_i parent items before selecting any child item. So the selection set must be such that there exists an order of selection where each child item appears after at least l_i parent items. This is equivalent to the condition that in the selected set, for each child i, the number of selected parent items is at least l_i if any child item is selected. But does this also require that in the selection order we can arrange items to satisfy the precedence? If we have a set satisfying x_{p_i} >= l_i whenever x_i > 0, can we always order the selected items to respect that each child item is selected after at least l_i parent items? Since we have x_{p_i} parent items in total, and we need to ensure that at the time we select a child item, at least l_i parent items have already been selected. Since parent items are identical, we can simply select all parent items first, then child items. That ordering works because we have at least l_i parent items selected before any child item. However, if there are multiple levels, we can select root items first, then children items, then grandchildren, etc. As long as for each edge, parent count meets threshold before any child item is taken, we can order by topological level: all items of depth d are taken after all items of depth d-1? Not exactly, because thresholds may require a certain number, not all. But if we take all parent items first, then certainly the threshold is met. But we might not take all parent items; we take only x_{p_i} parent items. If we take all of those first, then child items can be taken. So indeed any set satisfying the inequality can be realized by an order where we first select all root items (up to x_root), then all children items (up to their selected counts), etc. Since the tree is rooted and thresholds are only from parent to child, selecting all items of a parent before any of its children works because the parent count at the time we start children is exactly x_{p_i} which is >= l_i. So the feasibility condition is just the inequality.
Thus, the problem reduces to selecting x_i satisfying 0 <= x_i <= h_i, sum x_i <= k, and for each i>1, if x_i > 0 then x_{p_i} >= l_i. This is a purely combinatorial optimization with linear objective and linear constraints plus a conditional. It can be reformulated as: For each i>1, we have x_i <= h_i * y_i, where y_i is binary indicating if we invest in i; and y_i <= floor(x_{p_i} / l_i) maybe? Actually, the condition is: x_i > 0 => x_{p_i} >= l_i. Equivalent to: x_i <= h_i * (x_{p_i} >= l_i). Since x_{p_i} is integer, we can write x_i <= h_i * (x_{p_i} / l_i) but that's not linear. However, we can think of it as: we cannot have x_i > 0 unless x_{p_i} >= l_i. This is like a "big-M" constraint: x_i <= M * z, and z <= x_{p_i} / l_i, but not linear.
But perhaps we can transform by considering that if we invest in child, we must invest at least l_i in parent. So we could define new variables representing the "activation" of child, and then the parent investment must cover the maximum of l_i over children activated.
Given the small n (100), we might consider DP over the tree using a technique that treats the problem as a knapsack where each node has a "cost" for unlocking its children, but we can use DP with state representing how much we invest in the node, and treat children as items with a cost (the child's DP) but we also need to ensure node's level is at least some thresholds.
Given the earlier approach of DP per node with dimension k, we need to find an efficient way to merge children's DP arrays. The naive merging is O(k^2) per node. But we can perhaps use the fact that each child's DP is a concave function? Let's examine the structure of dp_j[c] for a subtree. The DP is essentially the maximum total benefit achievable from that subtree with total cost c. Since each unit cost gives a benefit, and constraints are of a similar type, the DP might be concave? Actually, the maximum value function for a knapsack with items that have linear values and certain dependencies might be concave? In general, knapsack problems have convex (or rather, the maximum value function is concave? Let's recall: For unbounded knapsack with linear items, the value function is linear; for 0/1 knapsack, it's concave? Actually, the maximum value as a function of capacity is concave if items have diminishing returns? Not necessarily. For 0/1 items with different values, the value function is the upper envelope of linear extensions, which is piecewise linear and concave? Typically, the knapsack value function is not necessarily concave; it can have convex parts because adding a new item can give a big jump. But if we consider the set of items as multiple copies of each skill (up to h_i), it's like a bounded knapsack where each item (skill unit) has value s_i and weight 1. But there are activation constraints. However, if we ignore activation constraints, the optimal value function for selecting up to c units from a multiset of items with values s_i is simply to take the c highest values. That function is concave? Actually, if you sort values descending, the incremental benefit of the next unit is non-increasing (since you take items in decreasing value). So the marginal gain is decreasing, meaning the total value as a function of number of items taken is concave (since second difference <=0). Indeed, if you have sorted values v1 >= v2 >= ... then total after t items is sum_{i=1..t} v_i, which is a concave function because increments are decreasing. So for a simple collection of items (units) with no dependencies, the optimal value function is concave.
Now with dependencies, the set of items available is not fixed; it depends on which items we take because unlocking can make more items available. However, maybe the overall optimal value function for the whole tree is still concave? Not necessarily, but perhaps the DP for each subtree yields a concave function? Let's test on a simple tree: root with two children, each with high value but require threshold on root. The optimal value as a function of total cost might not be concave globally because at low cost you can only take root items (low value), then after a threshold you can take child items (high value) causing a jump in marginal benefit, making the function convex around the threshold? Actually, if you have to invest some amount in low-value items to unlock high-value items, the marginal benefit might initially be low, then after unlocking, it becomes high, causing the function to be convex (increasing returns) around that point. For example: root value=1, child value=100, l=5, h_child=1, h_root large. The optimal total value V(c): for c <=5, V(c)=c (all root). For c=6, best is 5 root + 1 child = 5+100=105. So V(5)=5, V(6)=105, increment =100, which is larger than previous increments (1). So V is