| 1. Assessment & Planning(Months 1-2) | - Review current TP framework (gaps in curves, liquidity, fairness).- Benchmark vs. peers (e.g., JPM, HSBC).- Define requirements (e.g., curve granularity by product/behavior).- Kickoff workshops. | 6 weeks | - Current state report.- Requirements doc.- Project charter. | Senior sponsor buy-in. |
| 2. Data Collection & Analysis(Months 2-3) | - Gather historical data: product cashflows, balance sheets, liquidity metrics (LCR/NSFR, HQLA usage).- Clean/validate data (e.g., behavioral assumptions for deposits/loans).- Analyze variances across businesses. | 6 weeks | - Data repository.- Gap analysis report. | Business data access. |
| 3. Model Design & Calibration(Months 3-5) | - Product Curves: Build/update multi-curve framework (e.g., OIS-based discounting, product-specific spreads for prepayments/defaults).- Liquidity Charges/Credits: - Stable/unstable funding classification. - Behavioral tenor modeling (e.g., core/non-core deposits). - Charges: % of notional (e.g., +50bps consumer, -20bps stable deposits). - Credits: For liquidity providers (e.g., Markets).- Integrate into TP engine (e.g., Python/Matlab for prototyping). | 8 weeks | - Prototype models.- Calibration report (backtesting vs. 3-5yr history).- Dry-run P&L impacts. | Data from Phase 2. |
| 4. Fairness Testing(Months 5-6) | - Metrics: Economic profit neutrality, variance analysis (e.g., ±5% fairness band), scenario testing (stress, volume changes).- Tests: - Cross-business comparison (e.g., ROE neutrality). - Sensitivity to assumptions (e.g., ±10% curve shift). - Business simulations (e.g., "what-if" for new products).- Independent validation (Internal Audit/Risk). | 6 weeks | - Fairness test report.- Issue log & resolutions.- Sign-off matrix. | Models from Phase 3. |
| 5. Implementation & Rollout(Months 6-8) | - Build production system (e.g., integrate with Oracle/SAP).- Parallel run (old vs. new TP for 1-2 months).- Training & change management.- Go-live with phased rollout (e.g., pilot one business). | 8 weeks | - Production TP calculator.- Go-live playbook.- Training materials. | IT resources. |
| (Months 8+) |