T+1 Settlement Readiness Plan
Executive Summary
T+1 settlement (trade date + 1 business day) requires compressing the settlement cycle from T+2, demanding near-real-time processing across the trade lifecycle. This plan outlines readiness across trade capture, allocations, affirmations, fails management, and client communications. It is structured in phases: Assessment (Q1), Implementation (Q2-Q3), Testing & Training (Q3-Q4), and Go-Live & Monitoring (May 2024 onward, aligned with SEC mandate). Total timeline: 6-9 months. Cross-functional ownership: Ops, IT, Front Office, Compliance, Client Services. Metrics: 99% straight-through processing (STP), <1% fails rate.
1. Trade Capture
Objective: Achieve 100% capture within 15 minutes of trade execution to enable downstream acceleration.
| Phase | Key Actions | Milestones | Owner |
|---|
| Assessment | Audit current capture latency (target <15 min); map systems (e.g., ADP, Bloomberg). | Gap report by end-Q1. | Ops/IT |
| Implementation | - Automate feeds from EMS/OMS.- Implement straight-through capture via FIX protocol.- Add T+1 validation rules (e.g., settlement date calc). | MVP live in sandbox by Q2-end. | IT/Ops |
| Testing | End-to-end simulations; stress test 10x volume. | 95% STP pass rate by Q3-end. | QA/Ops |
| Go-Live | Parallel run with T+2; monitor latency dashboards. | Full cutover May 2024. | Ops |
Tech Enablers: API integrations, AI anomaly detection.
2. Allocations
Objective: Complete allocations within 30 minutes post-execution for block trades.
| Phase | Key Actions | Milestones | Owner |
|---|
| Assessment | Review allocation workflows; benchmark vs. peers (target <30 min). | Bottleneck analysis by Q1-end. | Front Office/Ops |
| Implementation | - Auto-allocation engine (e.g., via FlexTrade or custom).- Bulk upload validation for omnibus accounts.- Pre-approvals for standing instructions. | Prototype tested Q2-end. | IT/Front Office |
| Testing | Scenario testing (e.g., partial fills, errors). | Zero manual interventions in sims by Q3-end. | QA |
| Go-Live | Fallback to manual if <90% auto-rate. | Integrated with capture by May 2024. | Ops |
Tech Enablers: Rules-based engines, blockchain for immutable allocs (pilot).
3. Affirmations
Objective: 98% affirmations by 6 PM ET on trade date (DT+1 deadline).
| Phase | Key Actions | Milestones | Owner |
|---|
| Assessment | Analyze matching rates via DTCC/Omgeo; identify breaks. | Affirmation gap report Q1-end. | Ops |
| Implementation | - Integrate with DTCC CTM+ for auto-matching.- Bilateral API affirmations with custodians.- Exception queues with auto-escalation. | 95% auto-affirm rate in UAT Q3. | IT/Ops |
| Testing | High-volume matching drills; cross-border sims. | Full STP by Q4-start. | QA/Compliance |
| Go-Live | Daily reconciliation; SLA monitoring. | Live May 2024. | Ops |
Tech Enablers: Swift GPI, ISO 20022 messaging.
4. Fails Management
Objective: Reduce fails to <0.5%; proactive resolution within 30 minutes of fail identification.
| Phase | Key Actions | Milestones | Owner |
|---|
| Assessment | Baseline fail rates/causes (e.g., cash/position shortages). | Root-cause matrix Q1-end. | Ops/Risk |
| Implementation | - Predictive analytics for fail forecasting.- Auto-borrow/lend inventory.- Fails charging model updates (e.g., +2% penalties). | Fails dashboard live Q3. | Risk/IT |
| Testing | Simulate 20% fail scenarios; test extensions/recalls. | <1% projected fails Q4. | QA/Risk |
| Go-Live | Real-time alerts; weekly reviews. | Optimized post-May 2024. | Ops |
Tech Enablers: ML models for prediction, integrated CNS (NSCC).
5. Client Communications
Objective: Ensure 100% client awareness; zero surprises on settlement shifts.
| Phase | Key Actions | Milestones | Owner |
|---|
| Assessment | Segment clients (buy-side, custodians); survey readiness. | Client readiness heatmap Q1-end. | Client Services |
| Implementation | - Phased comms: Awareness (Q2), Readiness (Q3), Confirmation (Q4).- Templates for confirmations/allocs.- Dedicated T+1 portal for queries. | Client portal beta Q3. | Marketing/Client Svcs |
| Testing | Mock client interactions; feedback loops. | 90% client ack by Q4-start. | Client Svcs |
| Go-Live | Daily status updates; post-trade alerts. | Ongoing from May 2024. | Client Svcs |
Channels: Email, webinars, client portal, 24/7 hotline.
Cross-Cutting Elements
- Technology: Upgrade to cloud-native platforms (e.g., AWS for scalability); API ecosystem.
- Processes: BPMN mapping; automate 90% manual steps.
- People & Training: 100% staff certified via e-learning; war rooms for go-live.
- Risk & Compliance: Reg alerts (SEC Rule 15c3-3); contingency for holidays.
- KPIs & Monitoring: Real-time dashboards (Tableau); monthly steers.
- Budget: $2-5M (tech 60%, training 20%, comms 20%).
- Dependencies: Vendor alignment (DTCC, custodians); regulatory filings.
Timeline Overview
Q1: Assess & Plan
Q2: Build & Pilot
Q3: Test & Train
Q4: Dry Runs & Certify
May 28, 2024: Go-Live
Post: Optimize (fails <0.5%)
This plan positions the firm for seamless T+1 compliance, minimizing costs and risks. Recommend weekly steering committee. Queries?