Creating a plan framework
I need to develop a structured plan that outlines an approach with various phases, decomposition, and components like ACL, data, routing, and cutover strategies. It should include actionable steps, artifacts, and risk mitigation. I’ll consider aspects like routing via an API gateway and domain-driven design. I'll create a concise yet detailed template in markdown, with a timeline, a sample domain method, design choices, and a cutover checklist, while ensuring to keep some parts generic for wider applicability.Structuring the project plan
I’m organizing the project into several sections, starting with goals and principles, followed by a baseline assessment and domain identification. Then, I’ll outline a decomposition approach to find seams and candidates, and develop a target architecture featuring elements like gateways and service meshes. I’ll cover anti-corruption layers and create a detailed data and routing plan. A phased roadmap with milestones and risk mitigations will follow, along with notes on CI/CD and observability practices. I’ll also include a sample table for better clarity.
Monolith → Microservices “Strangler Fig” Plan (Template + Playbook)
Guiding principles
- Decompose by business capability (bounded contexts), not layers (UI/API/DB).
- One service = one domain owner + one data owner (eventually).
- No “big bang” DB rewrite; use incremental data strangling (expand/contract, CDC, backfill).
- Routing is the control plane: a gateway/facade steers traffic per endpoint/use-case via config + feature flags.
- Anti-corruption layers (ACLs) prevent monolith domain model leaks and stabilize integration contracts.
1) Domain decomposition (how to carve the monolith safely)
1.1 Discover domains and seams
Run a short, structured discovery to identify bounded contexts and extraction order:
Workshops / inputs
- Event storming (business + dev), existing module map, DB schema map, production traces, incident history, team structure.
Output artifacts
- Context map (bounded contexts + relationships: upstream/downstream, conformist, ACL, etc.)
- Dependency heatmap (modules coupled via calls + shared tables)
- Strangler candidate backlog with ROI/risk scores
1.2 Define bounded contexts
For each candidate domain:
- Ubiquitous language (terms + invariants)
- Commands, queries, events
- Aggregate boundaries (write consistency scope)
- External dependencies (monolith modules, DB tables, 3rd parties)
1.3 Choose extraction order (recommended heuristic)
Start with high-change, low-coupling capabilities and those that can be fronted easily:
- Edge capabilities: auth/session, notifications, reporting/read models
- Independent workflows: billing, catalog, search, content
- Core transactional flows last (orders, fulfillment, ledger), unless there’s a pressing business need
Use a simple scoring model:
- Business value, change frequency, coupling level, data complexity, performance criticality, team readiness.
2) Target architecture for strangling (minimum required)
2.1 Routing layer (front door)
Introduce a Strangler Facade (often an API Gateway / BFF) that:
- Terminates auth, rate limits, request IDs
- Routes per route/use-case to monolith or new services
- Supports feature flags, canary, A/B routing, shadow traffic
2.2 Integration backbone
- Prefer async events for cross-service propagation (Kafka/Pulsar/RabbitMQ) where possible.
- Use sync APIs for strict request/response needs, but keep them coarse-grained.
- Establish schema/versioning rules (OpenAPI for HTTP; protobuf/Avro/JSON schema for events).
2.3 Observability baseline (non-negotiable)
Before heavy extraction:
- Distributed tracing (W3C trace context), structured logs, RED/USE metrics
- Golden signals dashboards per service + monolith slices
- Centralized error tracking + SLOs per critical journey
3) Anti-Corruption Layers (ACLs): patterns and where to put them
ACLs are the “insulation” between monolith and new services.
3.1 Inbound ACL (protect the new service)
When the monolith calls a new service (or gateway forwards to it):
- Translator: map monolith DTOs to service domain commands
- Facade: expose stable API that doesn’t mirror monolith internals
- Validation: reject invalid states early; don’t accept monolith’s “dirty” invariants
3.2 Outbound ACL (protect the monolith)
When new services must call monolith functionality:
- Wrap monolith endpoints behind a Monolith Adapter API (internal)
- Prevent “distributed monolith” by keeping calls coarse-grained
- Add timeouts, retries, circuit breakers; degrade gracefully
3.3 Data ACL (protect both from schema coupling)
- New service never reads monolith tables directly long-term.
- If unavoidable temporarily, do it via:
- Read replicas/materialized views
- Change Data Capture stream
- A dedicated “legacy read service” (time-boxed)
4) Data migration strategy (incremental, safe, reversible)
You’ll typically use three techniques, often combined:
4.1 Expand/Contract (recommended for transactional domains)
Expand
- Add new schema/store for the extracted service.
- Start writing needed data into it (via dual write or event replication).
Contract
- Move source-of-truth ownership to the service.
- Remove monolith writes, then reads, then tables/columns.
4.2 CDC-based replication (common for large monolith DBs)
- Use CDC (Debezium, native log-based replication) from monolith DB → event stream.
- Service consumes changes to build its own read/write models.
- Add reconciliation jobs to detect drift.
4.3 Dual write (use carefully)
- Application writes to both monolith DB and service DB during transition.
- Requires idempotency, retry semantics, and drift detection.
- Safer variant: transactional outbox in monolith + async publish.
4.4 Data cutover checklist per domain
For each service:
- Define system of record (SoR) and when it changes.
- Backfill historical data (batch) + keep up with deltas (CDC/events).
- Validate with:
- Row counts, checksums, business invariants
- Sampling + diff reports
- Parallel run results (see “shadow mode” below)
- Plan rollback: keep monolith path operational until stability is proven.
5) Routing plan (the core of strangling)
5.1 Route-by-route strangling
At the gateway/facade, maintain a routing table:
/api/customer/* → Customer Service (new) or Monolith (legacy)
- Gradually flip endpoints based on readiness
Controls
- Feature flags by tenant/user cohort
- Canary % rollout (1% → 10% → 50% → 100%)
- Header-based routing (
X-Use-New-Service: true)
- Shadow traffic: send copy to new service, do not impact response
5.2 Strangler Facade response strategies
- Simple proxy: gateway forwards and returns downstream response
- Aggregation: gateway composes results from monolith + services (time-box this; it can become a mini-monolith)
- Backend-for-Frontend (BFF): per client/channel to avoid chatty APIs
5.3 Contract compatibility
- Maintain backward compatible APIs at the facade
- Version APIs only when necessary; prefer additive changes
- Use consumer-driven contract tests to prevent regressions
6) Phased cutover plan (repeatable per domain)
Phase 0 — Prepare the monolith for strangling (1–4 weeks)
Goals
- Make extraction possible without constant breakage.
Actions
- Add gateway/facade in front of monolith
- Add auth standardization, correlation IDs, tracing
- Establish CI/CD, contract testing, environment parity
- Identify and document seams (module boundaries, DB table ownership)
Exit criteria
- Gateway routes 100% to monolith successfully
- Observability and deployment pipelines are stable
Phase 1 — First microservice “thin slice” (2–6 weeks)
Pick a domain with clear boundaries (e.g., Notifications, Preferences, Search).
Actions
- Implement service with its own datastore (even if small)
- Build ACLs (DTO translation, stable API)
- Integrate via gateway route (off by default)
- Add shadow traffic + diff tooling
Exit criteria
- Service passes load/perf tests
- Shadow comparisons show acceptable parity
- On-call runbook + SLO defined
Phase 2 — Read-path strangling (queries first)
Why: Reads are easier to cut over than writes.
Actions
- Route GET/read endpoints to the new service
- Backfill data + keep current via CDC/events
- Keep writes in monolith temporarily
Exit criteria
- Read endpoints at ≥50–100% traffic with stable error rates/latency
- Data freshness SLA met
Phase 3 — Write-path strangling (commands/transactions)
Actions
- Introduce command APIs in new service
- Implement idempotency keys, retries, saga/process manager if needed
- Use outbox/eventing for propagation back to monolith where required
- Gradually flip POST/PUT/PATCH routes via canary
Exit criteria
- New service becomes SoR for its domain writes
- Monolith no longer writes those tables/fields (or writes only via service API)
Phase 4 — Data ownership transfer + monolith contraction
Actions
- Remove monolith code paths (feature flags cleaned up)
- Remove direct DB dependencies:
- Drop/lock legacy columns/tables after retention period
- Replace with service API/event consumption
- Update documentation and dependency maps
Exit criteria
- No production traffic relies on monolith for that domain
- Monolith module retired (code deleted, not just unused)
Phase 5 — Repeat per domain; then decompose the “core”
Actions
- Iterate domain by domain using the same playbook
- Handle core workflows with sagas, event-driven integration, or carefully defined sync APIs
- Reduce gateway aggregation; push composition to BFFs or clients if appropriate
Exit criteria
- Monolith reduced to a small set of remaining capabilities (or fully retired)
7) Rollback and safety mechanisms (build in from day one)
- Instant routing rollback at gateway (flip routes back to monolith)
- Backward compatible data changes (expand/contract)
- Idempotent handlers and dedupe for event processing
- Reconciliation jobs + alerting on drift
- Kill switches per feature flag
8) Deliverables checklist (what you should be producing)
- Context map + decomposition backlog
- Per-service API specs + event schemas + versioning policy
- ACL implementations + contract tests
- Data migration runbooks (backfill, CDC, reconciliation, rollback)
- Gateway routing config + rollout plan per endpoint
- Observability dashboards + SLOs + on-call runbooks
- Cutover decision record (SoR changes, retired components)
9) Suggested cadence (how teams usually run it)
- 2–6 weeks per domain slice depending on complexity
- Each slice must reach “delete legacy code” to count as done (otherwise you accumulate permanent complexity)
- Limit parallel extractions to what your platform, SRE, and governance can support
If you share your monolith’s rough domain areas (or just a module list + main DB tables + top 5 user journeys), I can produce a concrete decomposition map, extraction order, and a per-domain routing/data cutover matrix tailored to your system.