| 0:00-0:15(15 min) | Icebreaker & Kickoff | Welcome, participant intros (e.g., "One web frustration you've faced"). Overview of PE philosophy: "HTML first, no-JS fallbacks, enhancements for all." Quick poll: "Rate your team's PE confidence (1-5)." | Interactive talk + Mentimeter poll | Aligned mindset; energy boost. |
| 0:15-0:45(30 min) | Core Concepts: Why PE Matters | Demo "breaking" a modern form (disable JS/network): Show failures in forms, keyboard traps, offline blanks. Contrast with PE examples (e.g., HTML forms → enhanced with HTMX/Alpine.js). Cover WCAG/SEO benefits. | Live demo (Chrome DevTools) + slides | Shared "aha" moments on pain points. |
| 0:45-1:15(30 min) | Deep Dive 1: Form Resilience | Principles: <form> + server-side rendering as baseline. Enhance with JS (validation, autosave) but ensure POST works sans JS.Activity: Audit a real form (e.g., login/signup) – identify resilience gaps. | Lecture (10 min) + Pair audit (20 min: designer sketches fixes, engineer codes POC) | Hands-on POCs; checklist for resilient forms. |
| 1:15-1:45(30 min) | Deep Dive 2: Keyboard Flows | Focus: Logical tab order, :focus-visible, ARIA live regions as fallbacks. JS enhancements (focus traps, skip links).Activity: Test a modal/form with keyboard-only (NVDA/VoiceOver). Redesign flow in Figma + code. | Demo (screen share keyboard nav) + Designer-engineer pairs (Figma wire + HTML prototype) | Accessible prototypes; keyboard checklist. |
| 1:45-2:15(30 min) | Deep Dive 3: Offline States | Basics: <meta name="viewport"> + cache manifests/Service Workers lite. Fallback UIs (e.g., "You're offline – form saved locally").Activity: Simulate offline (DevTools), build simple offline form queue (localStorage + retry). | Live code (15 min) + Group build (15 min) | Working offline demo; offline UX patterns. |
| 2:15-2:45(30 min) | Integration Challenge: Cross-Functional Sprint | Teams (2 designers + 2 engineers): Pick a real project form. Apply all 3 topics in 20 min sprint. Present (5 min/team). | Breakout rooms + Share screen | Collaborative artifacts; alignment on trade-offs. |
| 2:45-3:15(30 min) | Wrap-Up & Action Planning | Group debrief: Wins/challenges. Shared repo tour (add your POCs). Action items template: "By EOW, audit X form for Y."Resources: A11y Project, Resilient Web, starter templates. | Discussion + Miro board | Commitments; follow-up plan. |
| 3:15-3:30(15 min) | Feedback & Close | Quick survey + networking coffee chat. | Survey + casual | NPS data; momentum. |