Disaster Dialysis Continuity of Operations Plan (COOP)
1. Purpose and Scope
This plan ensures the continuity of life-sustaining hemodialysis and peritoneal dialysis services during disasters (e.g., hurricanes, earthquakes, floods, pandemics, or power outages). It prioritizes patient safety, resource allocation, and rapid restoration of services.
Scope: Applies to all dialysis centers under [Organization Name], serving [X] patients. Covers short-term disruptions (24-72 hours) to extended outages (weeks). Key focus areas: mobile dialysis units, water treatment, and mutual aid agreements.
Assumptions:
Patient registries are maintained and updated quarterly.
All staff are trained annually.
Plan is tested via tabletop exercises biannually and full drills annually.
2. Roles and Responsibilities
Role Responsibilities Incident Commander (IC) Overall plan activation; coordinates with external agencies. Medical Director Patient triage; clinical oversight. Operations Chief Manages mobile units and water systems. Logistics Chief Supplies, transport, mutual aid requests. Communications Officer Patient/staff notifications; external coordination. All Staff Report to designated assembly points; follow PPE protocols.
3. Activation and Notification
Triggers: Loss of power/water >12 hours, facility damage, or public health emergency declaration.
Notification Chain: IC notifies via RedSky/Everbridge system within 1 hour. Escalate to [State EMS/Health Dept.] if >50% capacity lost.
Phases:
Alert (Prep): Stockpile supplies; notify patients.
Activation (Response): Deploy mobile units; invoke mutual aid.
Recovery (Restore): Full operations resume; after-action review.
4. Mobile Dialysis Units
Mobile units provide hemodialysis (HD) capacity in alternate locations (e.g., parking lots, schools, stadiums).
4.1 Inventory and Maintenance
Assets: 10 portable HD machines (e.g., NxStage System One), 5 peritoneal dialysis (PD) kits, 2 trailers (each with 8 stations, generators, tents).
Maintenance: Monthly inspections; annual certification. Stored at [Central Warehouse Address].
Supplies (72-hour minimum): 500 dialyzer cartridges, 1,000L bicarb concentrate, EPO, heparin.
4.2 Deployment Protocols
Site Selection: Pre-identified safe zones (e.g., [Site A: Hospital Lot; Site B: Fairgrounds]). Criteria: power access, security, flat ground.
Setup Timeline: 4-6 hours (transport via flatbeds; setup by 6 techs).
Capacity: 50 patients/day per full trailer.
Staffing: 1:4 nurse-to-patient ratio; rotate shifts (12-hour).
Patient Transport: Ambulances/vans; triage priority: unstable > stable > PD patients.
Power: Dual-fuel generators (500kW); fuel cache (72 hours).
Flowchart:
code Copy code
Alert → Assess Damage → Deploy Trailer (Site 1) → Triage Patients → Dialyze (Batch: 4hr sessions)
5. Water Treatment
Dialysis requires >99.9% pure water (RO/DI standards: <1µS/cm conductivity, endotoxin-free).
5.1 Primary Systems
Backup RO Plants: 2 portable reverse osmosis (RO) units (500L/hr each) with UV/deionization.
Storage: 10,000L medical-grade tanks.
5.2 Disaster Protocols
Sourcing: Municipal (preferred) → Bottled (short-term) → Haul from unaffected sites (trucks).
Treatment Process:
Step Equipment Output Quality Pre-filtration Sediment/carbon filters Removes particulates RO Portable RO skids TDS <10ppm DI/UV Mixed-bed resin + UV Endotoxins <0.25 EU/mL QA Test Portable meters (Hach) Verified every batch
Power Dependency: Generators with auto-start; battery backups for pumps.
Contingencies:
Chemical outage: Stockpile bicarb (dry mix).
Contamination: CDC/EPA mobile labs for testing.
Capacity: 4,000L/day (supports 80 HD sessions).
Monitoring: Continuous logging; alert if conductivity >5µS/cm.
6. Mutual Aid Agreements
Formal MOUs ensure resource sharing. Reviewed/renewed annually.
6.1 Partners
Partner Resources Provided Contact Nearby Dialysis Network (5 centers) Patient slots (20/bed), staff (10 RNs) [Name/Phone] State Renal Disaster Coalition Mobile units, water trucks [State EMS] National Kidney Foundation/ESRD Network Supplies, transport [Hotline: 1-800-XXX-XXXX] FEMA/US&R Task Forces Generators, security [Regional Coord.] Military Medical Units (e.g., USPHS) Deployable HD teams [DLA Hotline]
6.2 Activation
Request Process: IC submits via [WebEOC portal] → Approval <2 hours.
Triggers: >30% capacity loss; invoke "Level 2 Aid" for water/mobile needs.
Patient Transfer: EMR-compatible records; transport with 48-hour supply kits.
Reimbursement: Per EMAC/FEMA guidelines; track via standardized forms.
Reciprocity: Provide aid to partners first.
Sample Mutual Aid Request Form:
code Copy code
Date: ___ | Requestor: ___ | Need: [ ] Mobile Units [ ] Water (___L) [ ] Staff (___)
Estimated Duration: ___ | Patients Affected: ___
7. Communications and Patient Management
Patient Registry: Electronic (via [EHR System]); includes emergency contacts, vascular access type.
Notifications: SMS/app pushes: "Report to [Site] at [Time]."
Public Info: Hotline (1-800-DIALYSIS); website updates.
Media: Unified messaging via PIO.
8. Training, Exercises, and Maintenance
Training: Annual for all staff; cross-train on mobile/RO ops.
Exercises: Biannual tabletop; annual full-scale (e.g., simulate flood).
Plan Review: Post-event or annually; update contacts/inventory.
9. Appendices
A: Site Maps and Checklists
B: Equipment SOPs
C: MOU Templates
D: After-Action Report Template
Approval:
[Medical Director Signature] Date: ___
[Incident Commander Signature] Date: ___
This plan complies with CMS ESRD Conditions for Coverage, NFPA 99, and HHS Disaster Guidelines. Contact [IC Name] for questions.