Time-Driven Activity-Based Costing (TDABC) Model
I'll build a complete time-driven ABC (TDABC) costing model for a fictional Widget Manufacturing Company. This company produces two products: Standard Widgets (SW) and Premium Widgets (PW). Production volume for the period: 10,000 SW and 2,000 PW (total 12,000 units). Batches: 100 batches for SW, 50 batches for PW (total 150 batches).
TDABC simplifies traditional ABC by:
- Using time equations for resource consumption: Practical Capacity Time Available × Allocation % (or more precisely, Time per Driver Unit × Driver Quantity).
- Focusing on capacity cost rates ($ per minute/hour).
- Enabling variance analysis for unused capacity, volume/efficiency variances.
1. Activities Dictionary
This defines key activities, their output measures/drivers, description, and time consumption per unit of driver (in minutes per driver unit). Time is estimated based on time studies.
| Activity ID | Activity Name | Description | Primary Driver | Time per Driver Unit (minutes) | Resource Consuming Activity |
|---|
| A1 | Machine Setup | Preparing machines for production batches | Batches | 30 | Machining Dept. |
| A2 | Machining | Running parts on CNC machines | Units | 10 | Machining Dept. |
| A3 | Assembly | Manual assembly of components | Units | 15 | Assembly Labor |
| A4 | Quality Inspection | Final inspection and testing per batch | Batches | 20 | Quality Team |
| A5 | Packaging | Packing finished widgets for shipment | Units | 5 | Assembly Labor |
Notes:
- Total time demanded = (Driver Quantity × Time per Unit).
- Resources may supply time to multiple activities.
2. Resource Capacity and Rates
Resources are pooled by department/type. Practical capacity assumes 85% utilization of theoretical capacity (e.g., 2 shifts/day, 5 days/week, 50 weeks/year = 8,500 hours theoretical; practical = 85% = ~7,225 hours).
| Resource Pool | Total Cost ($/year) | Practical Capacity (hours/year) | Capacity Rate ($/hour) | Capacity Rate ($/minute) |
|---|
| Machining Dept. | 500,000 | 7,000 | 71.43 | 1.19 |
| Assembly Labor | 300,000 | 6,000 | 50.00 | 0.83 |
| Quality Team | 150,000 | 3,000 | 50.00 | 0.83 |
| Total | 950,000 | 16,000 | - | - |
Calculations:
- Rate = Total Cost ÷ Practical Capacity (hours).
- /minute=/hour ÷ 60.
- Total Supplied Capacity Cost = Sum of (Practical Capacity Hours × Rate) = $950,000.
3. Time Demands and Cost Assignment
Calculate demanded time from activities using driver volumes.
Driver Volumes (Example Period)
| Driver | SW Volume | PW Volume | Total Volume |
|---|
| Units | 10,000 | 2,000 | 12,000 |
| Batches | 100 | 50 | 150 |
Time Demanded by Activity and Resource (minutes)
Convert to minutes for precision; then aggregate to hours.
| Activity | Driver Qty | Time per Unit (min) | Total Time Demanded (min) | Total Time (hours) | Assigned Resource | Cost Assigned ($) |
|---|
| A1: Machine Setup | 150 batches | 30 | 4,500 | 75 | Machining | 75 × 71.43 = 5,357 |
| A2: Machining | 12,000 units | 10 | 120,000 | 2,000 | Machining | 2,000 × 71.43 = 142,857 |
| A3: Assembly | 12,000 units | 15 | 180,000 | 3,000 | Assembly | 3,000 × 50.00 = 150,000 |
| A4: Inspection | 150 batches | 20 | 3,000 | 50 | Quality | 50 × 50.00 = 2,500 |
| A5: Packaging | 12,000 units | 5 | 60,000 | 1,000 | Assembly | 1,000 × 50.00 = 50,000 |
| Totals | - | - | 367,500 | 6,125 | - | 350,714 |
Product Costing (Per Unit)
| Product | Machining Time (min/unit) | Assembly Time (min/unit) | Other Time (min/unit) | Total Time (min/unit) | Cost per Unit ($) |
|---|
| SW | (30 min/batch ÷ 100 units/batch) + 10 = 10.3 | 15 + 5 = 20 | 20 min/batch ÷ 100 = 0.2 | 30.5 | 30.5 × (weighted avg rate 0.90/min*) = 27.45 |
| PW | (30/40 units/batch) + 10 = 10.75 | 20 | 20/40 = 0.5 | 31.25 | 31.25 × 0.90 = 28.13 |
*Weighted avg rate = Total cost assigned / Total time demanded minutes = 350,714 / 367,500 ≈ $0.90/min.
Total Product Costs: SW: 10,000 × 27.45 = 274,500;PW:2,000×28.13=56,260. Grand Total: $330,760 (excludes variances).
4. Variance Analysis
TDABC highlights capacity utilization variances. Compare supplied capacity (practical) vs. demanded/used capacity.
| Resource Pool | Practical Capacity (hours) | Time Demanded (hours) | Used Capacity % | Unused Capacity (hours) | Unused Cost ($) |
|---|
| Machining Dept. | 7,000 | 2,075 | 29.6% | 4,925 | 4,925 × 71.43 = 351,786 |
| Assembly Labor | 6,000 | 4,000 | 66.7% | 2,000 | 2,000 × 50.00 = 100,000 |
| Quality Team | 3,000 | 50 | 1.7% | 2,950 | 2,950 × 50.00 = 147,500 |
| Totals | 16,000 | 6,125 | 38.3% | 9,875 | 599,286 |
Variance Breakdown
- Unused Capacity Variance = Practical Capacity - Demanded Time = 9,875 hours ($599,286). Reason: Low volume or seasonal slack.
- Volume Variance: If volume changes, recalculate demanded time (e.g., +20% volume → +20% demand → reduces unused by ~1,975 hours).
- Efficiency Variance: Actual time vs. standard (assume standard met; if actual machining took 2,200 hours, +$9,143 overcost).
- Total Cost Variance = Supplied Capacity Cost - Assigned Cost = 950,000−350,714 = $599,286 (all unused).
Key Insights:
- Overcapacity: 61.7% idle resources—suggest outsourcing machining or adding volume.
- Cost per Unit Sensitivity: If volume doubles, unused drops, unit cost falls ~15%.
- Recommendations: Target PW (higher complexity) for pricing; automate assembly to cut time.
This model is fully scalable—input your real data into a spreadsheet (e.g., Excel with formulas) for dynamic analysis. Let me know if you need expansions, like Excel formulas or scenario simulations!