| Tier 1: Drilling/Exploration(Upstream, 40-60% CAPEX, Project-Killer) | Drilling Failure | - Dry/slim holes (20-30% failure rate).- Lost circulation, stuck pipe.- Unexpected geology (e.g., fault zones). | High/Extreme(P: 20-40%; Impact: 100% CAPEX loss) | - Phased drilling: Slim-hole exploratory → full production wells.- 3D seismic/MT surveys pre-drill.- Performance bonds & drilling insurance (covers 70-80% dry hole cost). | Equity Sponsors (100% first-loss). | Low (post-insurance; derisked to 5-10% via pilots). |
| Resource Underperformance | - Lower temp/flow than modeled.- Casing failure post-drill. | Med/High(P: 15-25%; Impact: 30-50% EBITDA) | - Resource risk insurance (e.g., Geothermal Risk Insurance from World Bank/MIGA).- Contingency reserves (10-15% CAPEX). | Equity + Junior Debt. | Low-Med (monitored via production testing). |
| Tier 2: Construction/Development(Transition to COD; Bridges to Revenue) | Cost Overrun/Delay | - Drilling escalation (steel/inflation).- EPC delays from permitting. | Med/Med(P: 10-20%; Impact: 10-20% CAPEX) | - Fixed-price EPC contract w/ LDs (liquidated damages).- Escalation clauses tied to indices. | EPC Contractor + Contingency Escrow. | Low (capped at 5% overrun). |
| Tier 3: Revenue/Oftake(Downstream; Stabilizes Cash Flows) | PPA/Oftake Termination | - Utility default/non-renewal.- Force majeure (e.g., grid curtailment). | Low/Med(P: 5-10%; Impact: 50-100% revenue) | - Bankable PPA: Take-or-pay, hell-or-high-water clauses.- Govt. guarantees (e.g., sovereign support in FiT regimes). | Utility/Creditworthy Offtaker (backed by LCs). | Very Low (20+ yr terms; diversified offtake). |
| Price/Volume Risk | - Low tariffs, output variability.- Regulatory changes (e.g., FiT cuts). | Med/Low(P: 10-15%; Impact: 20% EBITDA) | - Indexed/escalating tariffs (CPI + fuel hedge).- Output guarantees via reinjection/storage. | DSCR Reserves (1.3-1.5x coverage). | Low (hedged via long-term contracts). |
| Tier 4: Operational/Long-Term(Tail Risks; Post-COD Stability) | Resource Depletion/Sustainability | - Pressure decline over 20+ years.- Seismic inducement. | Low/Low(P: 5%; Impact: 10-20% output) | - Reservoir modeling + monitoring.- Insurance (decline in production). | O&M Reserves + Senior Debt Sweep. | Minimal (life-of-project >40 years). |
| O&M/Credit | - Contractor default.- Sponsor distress. | Low/Low(P: 3-5%; Impact: 5-10% EBITDA) | - Parent guarantees.- DSRA/MSRA (debt/ maintenance reserves). | Senior Lenders (pro-rata). | Negligible. |