The user wants to know about a "Scalable RFC process," specifically focusing on four key areas:
- Templates: How to structure the documents.
- SLAs (Service Level Agreements): Timelines and expectations for the review process.
- Decision Logs: How to record outcomes.
- Discoverability: How people find and reference RFCs.
The user is likely a engineering leader, tech lead, or process improvement enthusiast looking to implement or improve an architectural or technical decision-making process within a growing organization. The term "Scalable" implies they need a process that works for a team of 10, 50, or 500+, avoiding bottlenecks as the company grows.
1. Deconstruct the Request:
- Core Subject: RFC (Request for Comments) process.
- Key Constraints/Attributes: Scalability.
- Specific Components to Cover:
- Templates (Content structure).
- SLAs (Timeboxing, review cycles).
- Decision Logs (Record keeping).
- Discoverability (Search, organization).
2. Brainstorming & Structuring the Response:
-
Introduction: Define what an RFC is in this context (Architecture Decision Records, Design Docs) and why scalability matters (avoiding "design by committee," bottlenecks, and entropy).
-
Component 1: Templates (The "What")
- Problem: If templates are too long, nobody writes them. If too short, they are useless.
- Solution: Modular templates.
- Standard Sections: Summary, Problem, Solution, Alternatives, Risks.
- Scalability tip: Distinguish between a "Lightweight" RFC (small change) and a "Formal" RFC (major architecture shift).
-
Component 2: SLAs (The "When" and "Who")
- Problem: RFCs sitting in limbo for weeks.
- Solution: Strict timeboxing.
- Key metrics: Time to initial review, Duration of comment period, Time to final decision.
- Roles: Author, Reviewer, Approver (Owner).
- Scalability tip: "Silence implies consent" (Lazy Consensus) vs. Active Approval. For large orgs, tiered approval is necessary.
-
Component 3: Decision Logs (The "Outcome")
- Problem: "Why did we build it this way 3 years ago?"
- Solution: Immutable records.
- Format: Status (Proposed, Approved, Rejected, Superseded).
- Integration: Link to the PR/Code.
- Scalability tip: A "Changelog" or "Amendments" section for when plans change without rewriting the whole doc.
-
Component 4: Discoverability (The "Where")
- Problem: Duplication of effort ("I didn't know you already built a caching layer!").
- Solution: Central repository, indexing, tagging.
- Tools: Notion, Confluence, GitHub/GitLab (Markdown + PRs are best for engineering).
- Scalability tip: Automation. Bot announcements in Slack/Teams when a new RFC is created.
-
The "Process Flow" (Tying it together):
- Draft -> Review -> Final Comment Period -> Decision -> Archive.
-
Culture & Anti-Patterns (Bonus but critical for scalability):
- Don't use RFCs to delay work.
- Avoid "Design by Committee."
- The "Sheriff" role (someone to move things along).
3. Refining the Content (Self-Correction during drafting):
- Initial thought: Just list fields for the template.
- Correction: Provide a Markdown snippet or clear headings. Emphasize why those fields matter for scale (e.g., "Rollout Plan" prevents operational disasters).
- Initial thought on SLAs: Just say "2 days."
- Correction: Differentiate based on impact. A "Tier 1" RFC (database migration) needs longer than "Tier 3" (refactoring a helper function).
- Discoverability: Mention tagging/labels. In a massive org, searching by "Service-X" or "Auth" is vital.
4. Final Polish:
- Use formatting (bolding, lists) to make it readable.
- Keep the tone professional but actionable.
- Ensure the distinction between "Lazy Consensus" (good for speed) and "Consensus Seeking" (good for risk) is clear.
5. Output Generation Strategy:
- I will structure the response as a "Playbook" for a scalable RFC process.
- I will address the four specific points requested in order.
- I will add a section on "Lifecycle" to weave them together.
(Self-Correction during drafting the "Templates" section): I should explicitly mention that templates shouldn't be bureaucratic hurdles. "The template should serve the author, not the other way around."
(Self-Correction on "SLAs"): I need to introduce the concept of "Tiers." Small companies don't need tiers, but scalable ones do.
(Self-Correction on "Discoverability"): GitHub/GitLab is usually better than Confluence for engineering RFCs because of version control and diffing. I will recommend the "Repo-based" approach.
6. Final Review against User Prompt:
- Templates? Yes.
- SLAs? Yes.
- Decision Logs? Yes.
- Discoverability? Yes.
- Scalable? Yes.
Proceed to generate output.
A scalable Request for Comments (RFC) process is critical for engineering organizations transitioning from a startup (where everyone sits at the same table) to a scale-up (where teams are distributed and siloed).
The goal of a scalable process is asynchronous decision-making. If you require a meeting for every architectural decision, your velocity will cap at the number of available hours in your architects' calendars.
Here is a blueprint for a scalable RFC process covering your four key requirements.
1. Templates: Reducing Friction via Standardization
A template serves two purposes: it acts as a checklist for the author (ensuring they haven't missed security/scaling concerns) and reduces the cognitive load for the reviewer (who knows exactly where to look for specific information).
Scalability Strategy: Use Tiered Templates. Not every decision warrants a 10-page document. Force-fitting small changes into big templates creates bureaucracy.
- Tier 1: Lightweight (The "One-Pager")
- Use case: Small library updates, minor API tweaks, refactors within a single service.
- Content: What, Why, Link to PR.
- Tier 2: Standard (The "Design Doc")
- Use case: New features, database schema changes, major refactors.
- Content: Problem Statement, Proposed Solution, Alternatives Considered, Cross-Team Impact, Security/Privacy Scan.
- Tier 3: Heavyweight (The "Architecture Proposal")
- Use case: Changing infrastructure providers, introducing new languages, compliance-critical systems.
- Content: Full Tier 2 + Rollout Plan, Rollback Plan, Cost Analysis, SLA definitions, Disaster Recovery.
Key Template Sections for Scale:
- Summary (TL;DR): Mandatory. For busy executives/stakeholders.
- Problem Statement: Convincing the reader there is a problem worth solving.
- "Do Nothing" Option: Forces the author to justify why the status quo is unacceptable.
2. SLAs (Service Level Agreements): Timeboxing Decisions
In a scalable system, an RFC sitting in a queue for 3 weeks is a blocked deliverable. You need strict time limits.
Scalability Strategy: Implement "Lazy Consensus" with a clear timebox.
- The Timebox Rule:
- Initial Triage: The "RFC Steward" must triage the doc within 24 hours (assign reviewers, check formatting).
- Review Period: The default review window should be 3 to 5 business days.
- The Auto-Approve Clause: If no "Block" or "Major Concern" is raised within the timebox, the RFC is automatically considered "Approved."
- Reviewer SLAs:
- Each assigned reviewer must provide feedback within the window.
- If a reviewer is on vacation or too busy, the onus is on them to delegate the review, or the system auto-bypasses them after the deadline.
- The "Final Comment Period" (FCP):
- Borrowed from Rust/RFC processes. Once major concerns are resolved, enter a 48-hour "Final Comment Period." If silence follows, the merge button is pressed.
3. Decision Logs: Institutional Memory
The most painful part of scaling is when a new engineer joins and asks, "Why did we build it this weird way?" or, worse, "Let's rebuild this!" because they don't know the constraints of the past.
Scalability Strategy: The RFC is the code documentation.
- Immutable Logs:
- Once an RFC is "Approved," it is locked. You cannot edit it. If plans change, you must open a new RFC that "Supersedes" the old one. This preserves the history of why a decision was made, not just what was decided.
- Status States:
Draft (Author is working)
Review (Open for comments)
Approved (Green light)
Implemented (Code is in production)
Superseded (Replaced by RFC-XYZ)
Rejected (Crucial to keep: knowing what you didn't do is as important as what you did).
- The "Verdict" Section:
- At the top of every closed RFC, there must be a clear summary: "Decision: We will use PostgreSQL over MongoDB because..." This prevents re-litigating the same arguments 6 months later.
4. Discoverability: Searchability over Storage
An RFC that cannot be found is useless. A folder of Word documents on a shared drive is not a scalable solution.
Scalability Strategy: Code-as-Documentation (Git-based RFCs).
- GitOps Approach:
- Store RFCs as Markdown files in a dedicated repository (e.g.,
github.com/company/rfcs).
- Why? It integrates with the engineer's workflow (Pull Requests), provides version control, and allows for diffing.
- Indexing:
- Every merged RFC must update a central
README.md or INDEX.md file.
- Tags/Labels: Use labels (e.g.,
area:payments, type:database, status:approved).
- Notification Broadcasting:
- Do not rely on people checking the repo. Use a bot (Slack/Teams/Email) that announces:
- "New RFC Created: [Link]"
- "RFC Approved: [Link]"
- Search:
- If using a tool like Notion/Confluence, ensure the search works.
- If using GitHub, ensure the repo is indexed by your internal developer portal (e.g., Backstage).
Summary of the Workflow
| Stage | Action | Owner | SLA |
|---|
| 1. Draft | Author fills out Template. | Author | N/A |
| 2. Submit | PR opened against RFC Repo. | Author | N/A |
| 3. Triage | Assign Reviewers & Label. | RFC Steward | 24 Hours |
| 4. Review | Async comments on PR. | Reviewers | 3-5 Days |
| 5. Resolve | Address comments or reject. | Author | 2 Days |
| 6. FCP | Final 48h window for objections. | Community | 48 Hours |
| 7. Merge | PR Merged, Status = Approved. | Steward | Immediate |
Pro-Tip for Culture
Avoid "Design by Committee."
Explicitly state in your process that the goal of an RFC is consensus, not unanimity.
- Consensus: "I don't agree with your choice of Go, but I understand your reasoning and I won't stand in the way."
- Unanimity: "Everyone must love this."
- Scale kills unanimity. You need a defined "Benevolent Dictator" (usually a Tech Lead or Principal Eng) to break ties if consensus cannot be reached within the SLA.