Reading List Digitization Sprint Plan
Sprint Name: Reading List Digitizer Sprint 1
Duration: 2 weeks (10 working days, Mon-Fri)
Team Size: 4-6 members (1 Product Owner, 1 Scrum Master, 2-3 Developers/Digitizers, 1 QA/Licensing Specialist)
Sprint Goal: Digitize 50 items from the core reading list (books/articles), ensuring 100% licensing compliance, with searchable digital formats ready for a web repository.
Definition of Done (DoD): All stories accepted by PO; licensing verified; digital files QA-passed; metadata complete; repo deployed to staging.
Tools: Jira/Trello for tracking, Google Drive/Dropbox for storage, Abbyy FineReader/OCRmyPDF for scanning, Calibre for EPUB conversion, GitHub for repo, Creative Commons Search/LegalSide for licensing checks.
Velocity Estimate: 30 story points (based on prior sprints).
Sprint Backlog (User Stories & Tasks)
Prioritized by MoSCoW (Must/Should/Could/Won't). Each story includes licensing checkpoint as a gate.
Epic 1: Inventory & Licensing Verification (Must - 12 points)
| User Story | Tasks | Acceptance Criteria | Est. Points | Assignee |
|---|
| As a librarian, I want an inventoried list of 50 reading items so I can prioritize digitization. | - Export reading list from source (Excel/PDF).- Categorize by format (book, article, PDF).- Assign unique IDs. | - CSV inventory with title/author/ISBN/format.- 100% coverage of list. | 3 | Dev1 |
| As a compliance officer, I want licensing checked for all 50 items so we avoid IP violations. | - Query HathiTrust/Google Books for public domain status.- Check ISBN against Creative Commons/PD databases.- For non-PD: Request permissions via email template (aim for 20% response).- Flag: PD (green), CC (yellow), Needs Permission (red), Blocked (black). | - Licensing report spreadsheet.- 80% items green/yellow; reds escalated.- Audit trail with sources/links. Gate: No sprint progress without this. | 5 | Licensing QA |
| As a team, I want prioritized subsets (PD/CC first) so digitization starts immediately. | - Sort inventory by license status.- Create sprint subsets: Tier 1 (30 PD/CC), Tier 2 (20 pending). | - Jira board updated with subsets. | 4 | PO/Scrum Master |
Daily Standup Focus: License blockers.
Epic 2: Digitization Pipeline (Must - 10 points)
| User Story | Tasks | Acceptance Criteria | Est. Points | Assignee |
|---|
| As a user, I want 30 Tier 1 items digitized so they're accessible digitally. | - Scan physical items (600 DPI, grayscale/color as needed).- OCR with post-correction (95% accuracy).- Export: PDF/A (archival) + EPUB (reflowable).- Licensing Gate: Only proceed if green/yellow. | - Files named {ID}_title.pdf/{ID}_title.epub.- OCR accuracy >95% (sample 10%). | 5 | Dev2/Dev3 |
| As a metadata curator, I want standardized metadata for all digitized items so they're searchable. | - Embed Dublin Core metadata (title/author/ISBN/license/year).- Generate thumbnails/covers.- Upload to shared drive. | - Metadata validator passes.- License field populated (e.g., "CC-BY 4.0"). | 3 | Dev1 |
| As a QA tester, I want quality checks on digitized files so output is professional. | - Visual/OCR review (random 20% sample).- Validate EPUB with EpubCheck.- Re-check licensing pre-upload. | - Zero critical errors.- Bug log <5%. | 2 | QA |
Epic 3: Repository & Deployment (Should - 6 points)
| User Story | Tasks | Acceptance Criteria | Est. Points | Assignee |
|---|
| As an admin, I want a GitHub repo with digitized assets so the team can collaborate. | - Init repo with LICENSE file mirroring item licenses.- Folder structure: /tier1/{ID}/.- Add README with sprint summary/licensing summary. | - Repo public (if all PD/CC) or private.- CI/CD for future uploads. | 3 | Dev3 |
| As a stakeholder, I want a demo site/staging repo so I can preview the collection. | - Hugo/Jekyll static site generator.- Index with search (Lunr.js).- Deploy to Netlify/GitHub Pages. | - Live URL with 30 items searchable.- License badges on each item. | 3 | Dev2 |
Could-Have (4 points, if time)
- Automate licensing checks with API (e.g., Open Library API).
- Batch OCR script.
- Analytics dashboard for collection stats.
Sprint Ceremonies
- Sprint Planning (Day 1, 2h): Refine backlog, estimate.
- Daily Standups (15min): What done? Blockers? (Flag licensing issues ASAP).
- Sprint Review (Day 10, 1h): Demo repo, licensing report; PO sign-off.
- Retrospective (Day 10, 1h): What went well? (e.g., licensing bottlenecks?) Improve?
- Burndown Chart: Track in Jira; alert if licensing delays velocity.
Risks & Mitigations
| Risk | Probability | Mitigation |
|---|
| Licensing blocks >20% items | High | Pre-sprint pilot on 10 items; fallback to summaries/metadata only. |
| OCR quality issues | Medium | Train on sample; dual-review. |
| Permission delays | High | Parallel digitization of PD; escalate to legal. |
| Team bandwidth | Low | Overtime buffer; stretch goals. |
Success Metrics
- 30+ items fully digitized & licensed.
- 100% compliance (no unverified uploads).
- Sprint velocity achieved.
- Stakeholder feedback: "Ready for production."
Next Sprint Teaser: Scale to 100 items; integrate AI OCR; full permission pipeline.
This plan is ready to copy-paste into Jira. Questions or tweaks, Holmes? 🔍