make the following look more professional: "Get Smart on the Costs: Another way to…
- User
make the following look more professional: "Get Smart on the Costs: Another way to reduce cost is to look at the cost of futures as an input of hurdle rate to investment decisions about overlay strategies. This would require us to develop a better process to estimate what the cost of futures will look like for a specified holding horizon. For this purpose, the quant research team, in collaboration with Risk and PRM teams, have built a generic forecasting model for the two key drivers of the cost: CTD cheapening and net basis change. Below is an illustration of two key elements in the forecasting model using the FV contract as an example: (1) The richer the CTD is at the start of the futures contract, the more cheapening there will be at expiry. This is reflected in the negative slope of the fitted line between the entry level CTD valuation in terms of spline spread and its cheapening at expiry. (2) The cheapening also depends on the days to expiry. For newly initiated futures contracts, they generally have more certainty and sensitivity to cheapening than contracts approaching expiry. This is reflected in the declining R-Squared and beta coefficients in the table below. "
- Assistant
Maximizing Cost Efficiency: To further minimize costs, it is proposed that we evaluate the expense of futures as a factor in determining hurdle rates for investment decisions regarding overlay strategies. Accomplishing this will necessitate implementing a more effective process for predicting the cost of futures for predetermined holding periods. To achieve this end, collaboration between the Quantitative Research, Risk, and PRM teams was undertaken to establish a general forecasting model that focuses on two critical influencers of cost: CTD cheapening and net basis change. Below is an illustration of two key components in the forecasting model using the FV contract as an example: (1) A negative slope is visible in the line fitted between the entry level CTD valuation as expressed in spline spread and its cheapening at expiry; this indicates that the greater the CTD's richness at the start of the futures contract, the more cheapening will occur at expiry. (2) The degree of cheapening also relies on the days to expiry. Newly initiated futures contracts have more certainty and sensitivity to cheapening than contracts nearing expiry; this is reflected in the declining R-Squared and beta coefficients shown in the table below.
- User
Make the following read more professionally: "Based on the data analysis mentioned above, we were able to establish the regression model, and forecast out the cost of futures. Below shows the end-result of the forecast for a holding period of 72 days. As we can see, for the FV contract, the total “expected” cost for this whole period is 1.4 bps per year of duration contribution, with 1.1bps contributed by the front contract and 0.3bps by the back contract. With this added transparency of expected cost, we will be able to make an informed decision about using the futures for an overlay strategy."
- Assistant
Utilizing the Data Analysis Results: By conducting thorough data analysis, a regression model was constructed, allowing for the projection of futures costs. In the presented illustration of the forecasting outcomes for a 72-day holding period, it is evident that the estimated total expense for the duration contribution of one year from the FV contract is 1.4 basis points. This forecasted cost is broken down into 1.1bps attributed to the front contract and 0.3bps designated to the back contract. The clear and concise estimation of anticipated expenses provides the transparency needed to make well-informed decisions regarding the use of futures within our overlay strategy.
- User
make the following look better: "Based on the data analysis mentioned above, we were able to establish the regression model, and forecast out the cost of futures. Below shows the end-result of the forecast for a holding period of 72 days. As we can see, for the FV contract, the total “expected” cost for this whole period is 1.4 bps per year of duration contribution, with 1.1bps contributed by the front contract and 0.3bps by the back contract. With this added transparency of expected cost, we will be able to make an informed decision about using the futures for an overlay strategy."
- Assistant
Refined Version:
Through the diligent analysis of available data, we have successfully constructed a regression model capable of predicting futures costs. The resultant forecast for a holding term of 72 days is presented below, revealing that the anticipated total expense for the entire duration contribution of one year for the FV contract is 1.4 basis points. Of this projected cost, 1.1 basis points are attributed to the front contract, with the remaining 0.3 basis points allocated to the back contract. This newfound transparency and clarity surrounding anticipated costs provides us with the tools necessary to make informed and deliberate decisions concerning the utilization of futures within our overlay strategy.
- User
hi still there?
- Assistant
Yes, I am still here. How may I assist you?
- User
Please develop the python code for me to calculate the conditional dynamic correlation between the daily returns of s&p500 and the daily returns of nasdaq over the last 5 years
- Assistant
To calculate the conditional dynamic correlation between the daily returns of S&P500 and NASDAQ over the last 5 years, you can use the Arch Package in Python. Here is an example code for your reference:
code