You’re raising two critical points that are central to how the SEM (Single Electricity Market) operates, particularly regarding the TSO’s role and the settlement of negative bids. Let’s clarify both with precise references to SEM rules and mechanics.
1. Can the TSO Take Arbitrage Actions to Reduce Consumer Costs?
Short Answer:
No, the TSO cannot take arbitrage actions for profit. The SEM’s regulatory framework explicitly prohibits the TSO from engaging in market activities that could be perceived as arbitrage or profit-seeking. The TSO’s role is to ensure system security and balance, not to trade for financial gain.
Detailed Explanation:
Example of Misconception:
If the TSO were to accept a contra-NIV action (e.g., a downward bid in a system short) solely to profit from the price difference, this would violate SEM rules. Such actions must be justified for system security or constraint management, not for financial gain.
2. How Does a Generator With a –€12 Bid Get Settled If PMEA Is +€5?
Scenario:
- System is long (NIV < 0), so the TSO needs downward energy (curtailment).
- Generator W1 submits a downward bid of –€12/MWh (i.e., “Pay me €12/MWh to curtail”).
- PMEA (Price of the Marginal Energy Action) is +€5/MWh (set by the marginal unflagged co-NIV bid).
Settlement Logic:
Why Would W1 Bid –€12/MWh?
- To ensure it is selected for curtailment, especially if it has low opportunity costs (e.g., a wind farm with no fuel costs).
- If the PMEA is higher than its bid, it benefits by being paid more than it asked for.
Worked Example
System Long (NIV = –100 MWh):
- Downward Bids (co-NIV):
- G1: 40 MW @ +€15/MWh
- D1: 30 MW @ +€5/MWh
- W1: 30 MW @ –€12/MWh
PMEA Calculation:
- Stack bids from highest to lowest: +€15, +€5, –€12.
- Accept G1 (40 MW) and D1 (30 MW) → Total 70 MW.
- Still need 30 MW to meet NIV = –100 MWh.
- Accept W1 (30 MW).
- Marginal action: D1 at +€5/MWh → PMEA = +€5/MWh.
Settlement:
- G1: 40 MW @ +€5/MWh (paid by TSO).
- D1: 30 MW @ +€5/MWh (paid by TSO).
- W1: 30 MW @ +€5/MWh (paid by TSO), even though it bid –€12/MWh.
Why Not Pay-as-Bid for W1?
- Pay-as-bid only applies to flagged system actions or contra-NIV actions. Since W1 is unflagged and co-NIV, it is settled at PMEA.
Summary
| Action Type | Bid Price | PMEA | Settlement Price | Who Pays Whom? |
|---|
| Unflagged co-NIV | –€12 | +€5 | +€5 | TSO pays generator |
| Flagged (system) | –€12 | +€5 | –€12 | Generator pays TSO |
Key Takeaways:
- TSO cannot arbitrage—its actions must be justified for system security.
- Unflagged co-NIV actions are settled at PMEA, even if the bid is negative.
- Negative bids can result in higher payments if the PMEA is above the bid.
If you’d like, I can provide references to specific clauses in the SEM TSC Part B or BMPS, or expand on any part of this explanation!