based on below text generate requirements documentation for application development,…
- User
based on below text generate requirements documentation for application development, include: #epic, #user stories, #use cases, #test cases text: OutSystems Risk Management System: Detailed Requirements This system aims to provide a robust framework for managing risks across a global organization with local affiliates, ensuring proper control, visibility, and historical tracking through versioning.
- Global Risk Management (Headquarters Level) At the headquarters (HQ) level, the focus is on defining and managing risks that have an organization-wide impact. ● Global Risks: These are high-level risks applicable to all local affiliates. ○ Creation & Control: Only HQ users can create, modify, and manage Global Risks. ○ Visibility at Local Level: Local affiliates can view Global Risks as read-only. This ensures consistency and prevents unauthorized modifications at the local level. ○ Example: A "Global Transfer Pricing Non-Compliance Risk" due to misapplication of international tax regulations would be a Global Risk, defined and managed by HQ's global tax department. Local offices can see this risk but can't change its definition. ● Local-Global Risks: These are risks defined globally but require specific acceptance or rejection at the local affiliate level. ○ Creation & Control: Only HQ users can create and modify Local-Global Risks. ○ Local Affiliate Action: Local affiliates can either accept or ignore these risks based on their specific context and operations, assigning their own status and potentially local controls. ○ Example: A "Risk of Non-Compliance with Specific US State Sales Tax Laws." HQ defines this as a general risk, but only US-based affiliates would typically accept it (if applicable to their operations in that state) and then manage it. Non-US affiliates would likely ignore it.
- GlobalRiskGroup Definition The GlobalRiskGroup is a consolidated collection of all Global Risks and Local-Global Risks defined at the headquarters level. It serves as a comprehensive baseline for all global-level risks. ● Composition: A GlobalRiskGroup comprises all Global Risks and all Local-Global Risks that have been defined by the HQ. ● Purpose: It acts as a master list of all risks that the global organization is exposed to, regardless of whether they are directly applicable to all local affiliates (Global Risks) or require local discretion (Local-Global Risks).
- Risk Versioning: Global Level Versioning is crucial for maintaining an auditable history of risk definitions and ensuring that schedules are tied to specific risk states. ● Minor Version Change (Risk Level): Any modification to a Global Risk or Local-Global Risk (e.g., changing its description, impact, or likelihood) will automatically trigger a minor version increment for that specific risk. ○ Example: If "Global Transfer Pricing Non-Compliance Risk" (Version 1.0) is updated to reflect new OECD guidelines, it becomes "Global Transfer Pricing Non-Compliance Risk" (Version 1.1). ● Major Version Change (GlobalRiskGroup Level - Annual): At the beginning of every calendar year (e.g., January 1st, 2026), the system will automatically create a new major version of the GlobalRiskGroup. ○ Purpose: This consolidates the current state of all Global and Local-Global Risks. It provides a baseline for the upcoming year's risk assessments and ensures that schedules starting in the new year reference a stable, comprehensive set of global risks. ○ Example: On January 1st, 2026, a new "GlobalRiskGroup_2026_v1.0" will be created, containing the latest minor versions of all Global and Local-Global Risks as of that date. The previous year's group, "GlobalRiskGroup_2025_vX.Y", will remain for historical reference.
- Local Risk Management (Affiliate Level) Local affiliates have the autonomy to manage risks specific to their operations and integrate global risks into their local context. ● Local Risks: Risks created and managed entirely by individual local affiliates. ○ Creation & Control: Only users within that specific local affiliate can create, modify, and manage their Local Risks. ○ Example: A "Local Property Tax Assessment Risk" due to specific regional valuation rules in the New York office would be a Local Risk for the US affiliate. ● LocalRiskGroup Structure: Each local affiliate will have its own LocalRiskGroup. This group comprises: ○ Specific Versions of GlobalRiskGroup: A snapshot of a particular major version of the GlobalRiskGroup that the local affiliate has chosen to work with. This implicitly includes the specific versions of Global Risks and Local-Global Risks that were part of that GlobalRiskGroup version. ○ Specific Versions of Local Risks: The current minor versions of all Local Risks relevant to that affiliate. ○ Local-Global Risk Status: For the Local-Global Risks that are part of the inherited GlobalRiskGroup version, the local affiliate will maintain their accepted/ignored status and any associated specific versions or local notes.
- Risk Versioning: Local Level Similar to the global level, versioning is applied at the local level for Local Risks and their groupings. ● Minor Version Change (Local Risk Level): Any modification to a Local Risk will automatically create a new minor version for that specific Local Risk. ○ Example: If "Local Property Tax Assessment Risk" (Version 1.0) is updated due to a change in the local valuation methodology, it becomes "Local Property Tax Assessment Risk" (Version 1.1). ● Major Version Change (LocalRiskGroup Level - Annual): At the beginning of every year, the system will automatically create a new major version of the LocalRiskGroup for each local affiliate. ○ Purpose: This consolidates the current state of their Local Risks and the specific versions of Global/Local-Global Risks they've incorporated. ○ Example: On January 1st, 2026, the US affiliate will have a new "USLocalRiskGroup_2026_v1.0" which includes the "GlobalRiskGroup_2026_v1.0" (or a relevant earlier version if not yet updated) and the latest versions of all its specific Local Risks.
- Schedule Management (Local Affiliate Level) Schedules are the operational backbone for risk assessment and control at the local level. ● Schedule Creation: Schedules are created at the local affiliate level, driven by a specific version of their LocalRiskGroup. ○ Unique Mapping: Each schedule creates a unique, immutable mapping to the specific versions of: ■ Global Risks ■ Local-Global Risks ■ Local Risks contained within the selected LocalRiskGroup version at the time the schedule was created. ○ Duration: Schedules can run for a defined period (e.g., quarterly, semi-annually). ○ Example: The US affiliate creates a "Q1 2026 Tax Risk Assessment Schedule" based on "USLocalRiskGroup_2026_v1.0". This schedule will inherently link to all the specific versions of Global, Local-Global, and Local Risks that were part of that LocalRiskGroup version at that moment. You're absolutely right to emphasize the "resolving control for new version" as a distinct and critical functionality. This is central to ensuring compliance and active risk management. Let's integrate this explicitly into the "Dynamic Risk Updates During Open Schedules" functional requirements.
- Dynamic Risk Updates During Open Schedules The system's core capability during an open schedule is to provide a real-time, actionable view of risks, ensuring that local affiliates are immediately aware of, and can respond to, changes or new additions to risks, without losing the historical context of their assessment. This applies only to schedules marked as "Open." ● Detection and Notification of Changes to Existing Risks: ○ Functionality: The system must continuously monitor for new minor RiskVersion releases of any Global, Local-Global (if previously accepted by the affiliate), or Local Risk that is currently included in an open schedule. ○ Visual Alert: Upon detecting a new version, the system must automatically update the display of the relevant risk item on the schedule screen for all affected local affiliates. This update will include a clear visual cue (e.g., a flashing icon, a prominently displayed "New Version Available" tag) indicating that a newer version of the risk exists. ○ User Guidance: The system must provide explicit guidance to the user on the schedule screen, advising them to review the updated risk and perform a reassessment of their controls. ○ Example: If the "Global Corporate Income Tax Evasion Risk" (originally v1.0 in a Q1 2026 schedule) is updated by HQ to v1.2 in February, the system detects this. On the Q1 2026 schedule screen for the Singapore office, the "Global Corporate Income Tax Evasion Risk" line item will immediately show a "New Version Available: v1.2" alert. ● Detailed Version Comparison for Reassessment: ○ Functionality: For any risk flagged with a "New Version Available" cue, the system must allow the user to easily access and view a comparison between the RiskVersion that was initially linked when the schedule started (or last updated) and the newly available IsCurrentVersion. This comparison should highlight the specific changes (e.g., in description, impact, or likelihood). The system must also provide access to all intermediate historical versions of that risk. ○ Example: Clicking the "New Version Available" alert on "Global Corporate Income Tax Evasion Risk" on the schedule should open a pop-up allowing the Singapore user to see side-by-side what changed between v1.0 (their baseline) and v1.2, and potentially review v1.1 as well. ● "Resolve New Version" Functionality for Changed Risks: ○ Functionality: The system must provide a distinct "Resolve New Version" action (e.g., a button or a clear prompt) on the schedule screen for each risk item that is flagged with a "New Version Available" cue. This functionality enables the user to formally complete the reassessment process for a new risk version. ○ User Decision Paths within "Resolve New Version": ■ Option A: Confirm Existing Controls Apply: The user must be able to select an option (e.g., a checkbox or radio button) indicating that their already applied controls are still sufficient for the newly identified risk version. Upon confirmation (e.g., by clicking "Apply Controls & Resolve"), the system must update the ScheduleRiskItem's Initial_RiskVersion_Id to the IsCurrentVersion of the risk, thereby formally linking the schedule item to the latest assessed version. The "reassessment required" flag for this specific ScheduleRiskItem must then be cleared. ■ Option B: Modify Controls and Resolve: The user must be able to initiate a modification of their existing controls to align them with the new risk version's requirements. This could involve updating control descriptions, adding new control steps, or adjusting frequency (assuming controls are managed alongside). Upon saving these adjusted controls, the system must also update the ScheduleRiskItem's Initial_RiskVersion_Id to the IsCurrentVersion of the risk, and clear the "reassessment required" flag. ○ Example: For "Global Corporate Income Tax Evasion Risk v1.2" (flagged for new version), the user clicks a "Resolve New Version" button. A modal appears. If their existing control "Quarterly Tax Review" is still effective, they check "Controls are sufficient for v1.2" and click "Apply & Resolve." The system internally updates that schedule item to be associated with v1.2. If a new control action is needed, they would instead click "Adjust Controls" from the modal, make changes, and saving those changes would also implicitly resolve the new version for the schedule item. ● Automatic Inclusion and Notification of Newly Added Risks: ○ Functionality: The system must automatically add new risks to currently open schedules under the following conditions: ■ When a new Global Risk (v1.0) is created by HQ. ■ When a new Local-Global Risk (v1.0) is created by HQ and subsequently accepted by the local affiliate. ■ When a new Local Risk (v1.0) is created by the local affiliate. ○ Schedule Integration: The system must create a new ScheduleRiskItem for each newly added risk within the relevant open schedule(s), linking to the initial (v1.0) RiskVersion of that new risk. ○ Prominent Display: These newly added risks must appear prominently on the schedule screen, clearly identified with a "NEW" visual cue. ○ Required Assessment: The system must prompt the user to perform an initial assessment for these new risks, including defining and documenting controls, and setting their ControlStatus. Upon completion of this initial assessment, the IsNewlyAdded flag for the ScheduleRiskItem must be cleared. ○ Example: If HQ creates a "Global Digital Services Tax Risk v1.0" in March 2026, the system automatically adds this new risk to the Singapore office's "Q1 2026 Tax Risk Assessment Schedule." It appears on the screen with a "NEW" badge, prompting the Singapore tax team to assess its impact and establish controls. ● Mandatory Resolution Before Schedule Closure: ○ Functionality: The system must prevent a user from closing a schedule if any ScheduleRiskItem within that schedule is still flagged as either RequiresReassessment = True (indicating an existing risk has a new version that hasn't been acknowledged/resolved) or IsNewlyAdded = True (indicating a newly added risk that hasn't been initially assessed). ○ User Enforcement: Before allowing the schedule to transition from "Open" to "Closed," the system must force the user to act on all such flagged items through the "Resolve New Version" functionality or initial assessment. The system will display an error message and block closure until all such items are explicitly resolved. ○ Example: Before closing the "Q1 2026 Tax Risk Assessment Schedule," the system checks for any outstanding "New Version Available" or "NEW" flags. If "Global Corporate Income Tax Evasion Risk" still shows "New Version Available: v1.2" (meaning its reassessment hasn't been completed), the system will display an error message and block the closure until the user resolves that specific item using the "Resolve New Version" function. ● Immutability of Closed Schedules: ○ Functionality: Once a schedule is moved to a Closed or Archived status, the system must ensure that no further RiskVersion updates or new ScheduleRiskItem additions occur. Closed schedules serve as immutable historical records, precisely reflecting the state of risks and their assessments at the point of closure.
- Schedule Screen Functionality and User Interaction The schedule screen needs to be highly interactive and informative for local users during the assessment period. ● Prompt for Control Performance (Local & Local-Global Risks): ○ If a Local Risk or Local-Global Risk (that the affiliate has accepted) is changed (i.e., a new version is created) while a schedule referencing an older version is open, the system should advise the user to perform control in the open schedule. ○ Example: If "Local Property Tax Assessment Risk" v1.0 was part of the Q1 2026 schedule, but then a new v1.1 is created due to a policy update, the system should flag this on the schedule screen. ● Visual Cues and Reassessment Guidance: ○ New Risks Added During Schedule Period: ■ If a new Local Risk is added by the local affiliate after the schedule was created, it should be visually highlighted on the schedule screen with a clear "Newly Added" cue. ■ If a new Global Risk or new Local-Global Risk (if accepted) is added by HQ after the schedule was created, it should also be visually highlighted with a "Newly Added" cue. ○ Changed Risks During Schedule Period: ■ If an existing Local Risk, Global Risk, or Local-Global Risk linked to the schedule has a new version created after the schedule started, the risk should be visually highlighted on the schedule screen (e.g., "New Version Available") and the user should be advised to reassess the risk. ○ Control Action: ■ If the existing controls are still applicable for the new version, the user can simply click "Accepted and Verified." ■ If the controls need modification due to the risk change, the user should be prompted to "Change the control value and save again." ● Critical Information on Schedule Screen (Per Risk): For every risk listed on the schedule, users need to see detailed versioning information: ○ Original Version: "What version of Risk was used when the schedule was created?" ■ Example: For "Global Transfer Pricing Non-Compliance Risk," it might show "v1.0 (Schedule Creation)." ○ New Available Versions: "If in between versions has changed, if yes, so all new available versions." ■ Example: If "Global Transfer Pricing Non-Compliance Risk" was v1.0 when the schedule started but then v1.1 and v1.2 were created by HQ, it should clearly show "New versions available: v1.1, v1.2." This is especially crucial for Global Risks, where HQ changes can impact active local schedules. ○ Risk Definition Viewer: "Users can select and see the risk definition against any available version." ■ This allows users to compare different versions of a risk to understand what has changed, aiding in reassessment. ■ Example: A user can click on "Global Transfer Pricing Non-Compliance Risk v1.0" to see its original definition and then click on "v1.2" to see the updated definition side-by-side or in a pop-up, highlighting the changes. ● Clear Visual Cues for Linked New Versions: ○ The system must provide a very clear visual indication (e.g., an icon, a color change, a "New Version Available" tag) when a risk on the schedule has a newer version available than what was initially linked, or if it's a newly added risk. ○ This applies specifically to Global, Local-Global, and Local Risks that are part of the active schedule. ○ The user should be able to click on this cue to easily access the version history and, if applicable, link the current assessment to the newest relevant risk version. OutSystems Risk Management System: Detailed Solution
- Data Model (Entity-Relationship Diagram - ERD) The core of this system lies in accurately tracking versions of risks and their groupings. We'll use several entities, clearly defining their attributes and relationships. Entity Naming Convention: ● _Id: Primary Key ● _Name, _Description: Common attributes for naming/describing ● _VersionNumber, _IsCurrentVersion: For versioning ● _CreatedBy, _CreatedAt, _ModifiedBy, _ModifiedAt: Audit fields ● IsActive: To logically delete records Core Entities:
- Risk (Master Risk Definition) ○ Purpose: Represents the conceptual, overarching risk. Doesn't hold version-specific details. ○ Attributes: ■ Risk_Id (Integer, Primary Key) ■ Risk_Type_Id (Integer, Foreign Key to RiskType - Global, LocalGlobal, Local) ■ Risk_Code (Text, Unique - e.g., "TRP001", "LTX005") ■ IsActive (Boolean) ■ CreatedBy (UserId) ■ CreatedAt (DateTime) ■ ModifiedBy (UserId) ■ ModifiedAt (DateTime)
- RiskType (Static Entity) ○ Purpose: Classifies risks (Global, LocalGlobal, Local). ○ Attributes: ■ Id (Integer, Primary Key) ■ Label (Text - "Global", "Local-Global", "Local")
- RiskVersion ○ Purpose: Stores the specific details and attributes of a risk for a given version. ○ Attributes: ■ RiskVersion_Id (Integer, Primary Key) ■ Risk_Id (Integer, Foreign Key to Risk) ■ MajorVersion (Integer - e.g., 1) ■ MinorVersion (Integer - e.g., 0, 1, 2) ■ VersionNumberDisplay (Text - Calculated, e.g., "1.0", "1.1") ■ Risk_Description (Long Text) ■ Risk_Impact_Id (Integer, Foreign Key to RiskAttribute_Impact) ■ Risk_Likelihood_Id (Integer, Foreign Key to RiskAttribute_Likelihood) ■ Risk_Category_Id (Integer, Foreign Key to RiskAttribute_Category) ■ EffectiveDate (Date - When this version became effective) ■ IsCurrentVersion (Boolean - True if this is the latest minor version for its Risk_Id) ■ CreatedBy (UserId) ■ CreatedAt (DateTime) ■ ModifiedBy (UserId) ■ ModifiedAt (DateTime)
- RiskAttribute_Impact, RiskAttribute_Likelihood, RiskAttribute_Category (Static Entities) ○ Purpose: Standardized values for risk attributes. ○ Attributes: ■ Id (Integer, Primary Key) ■ Label (Text - e.g., "High", "Medium", "Low" for Impact/Likelihood; "Compliance", "Financial" for Category) ■ Order (Integer)
- GlobalRiskGroupVersion ○ Purpose: A snapshot of Global and Local-Global Risks at a specific major version point (annual). ○ Attributes: ■ GlobalRiskGroupVersion_Id (Integer, Primary Key) ■ MajorVersion (Integer - e.g., 2025, 2026) ■ VersionLabel (Text - e.g., "Global Risks 2026") ■ EffectiveDate (Date - Typically Jan 1st of the year) ■ IsCurrentGlobalGroup (Boolean - True if this is the latest major group version) ■ CreatedBy (UserId) ■ CreatedAt (DateTime)
- GlobalRiskGroup_RiskVersion (Junction Entity) ○ Purpose: Links specific RiskVersion (of Global/Local-Global type) to a GlobalRiskGroupVersion. ○ Attributes: ■ Id (Integer, Primary Key) ■ GlobalRiskGroupVersion_Id (Integer, Foreign Key to GlobalRiskGroupVersion) ■ RiskVersion_Id (Integer, Foreign Key to RiskVersion - must be RiskType = Global or LocalGlobal)
- LocalAffiliate ○ Purpose: Represents each local office/entity. ○ Attributes: ■ LocalAffiliate_Id (Integer, Primary Key) ■ Affiliate_Name (Text - e.g., "Singapore Tax Dept.", "US Tax Office") ■ Affiliate_Code (Text, Unique) ■ IsActive (Boolean)
- LocalRiskGroupVersion ○ Purpose: A snapshot of local affiliate-specific risks and the GlobalRiskGroup version it references. ○ Attributes: ■ LocalRiskGroupVersion_Id (Integer, Primary Key) ■ LocalAffiliate_Id (Integer, Foreign Key to LocalAffiliate) ■ GlobalRiskGroupVersion_Id (Integer, Foreign Key to GlobalRiskGroupVersion - the specific major version this local group is based on) ■ MajorVersion (Integer - e.g., 2025, 2026 for local groups) ■ VersionLabel (Text - e.g., "Singapore Tax Risks 2026") ■ EffectiveDate (Date - Typically Jan 1st of the year) ■ IsCurrentLocalGroup (Boolean - True if this is the latest major group version for its affiliate) ■ CreatedBy (UserId) ■ CreatedAt (DateTime)
- LocalRiskGroup_RiskVersion (Junction Entity) ○ Purpose: Links specific RiskVersion (of Local type) to a LocalRiskGroupVersion. ○ Attributes: ■ Id (Integer, Primary Key) ■ LocalRiskGroupVersion_Id (Integer, Foreign Key to LocalRiskGroupVersion) ■ RiskVersion_Id (Integer, Foreign Key to RiskVersion - must be RiskType = Local)
- LocalGlobalRisk_AffiliateStatus (Junction Entity) ○ Purpose: Tracks each local affiliate's decision (Accepted/Ignored) for a specific version of a Local-Global Risk. ○ Attributes: ■ Id (Integer, Primary Key) ■ LocalAffiliate_Id (Integer, Foreign Key to LocalAffiliate) ■ RiskVersion_Id (Integer, Foreign Key to RiskVersion - must be RiskType = LocalGlobal) ■ Status_Id (Integer, Foreign Key to LocalGlobalRiskStatusType - Accepted, Ignored) ■ EffectiveDate (Date - When the status was set for this version) ■ IsCurrentStatusForAffiliateRisk (Boolean - True if this is the latest decision for this Local-Global risk by this affiliate) ■ Reason (Long Text - Optional, why it was accepted/ignored) ■ CreatedBy (UserId) ■ CreatedAt (DateTime)
- LocalGlobalRiskStatusType (Static Entity) ○ Purpose: Defines the status for Local-Global risks at the affiliate level. ○ Attributes: ■ Id (Integer, Primary Key) ■ Label (Text - "Accepted", "Ignored")
- Schedule ○ Purpose: Represents an open period for risk assessment and control. ○ Attributes: ■ Schedule_Id (Integer, Primary Key) ■ LocalAffiliate_Id (Integer, Foreign Key to LocalAffiliate) ■ LocalRiskGroupVersion_Id (Integer, Foreign Key to LocalRiskGroupVersion - This defines the baseline risks for the schedule) ■ Schedule_Name (Text - e.g., "Q1 2026 Tax Risk Review") ■ StartDate (Date) ■ EndDate (Date) ■ Status_Id (Integer, Foreign Key to ScheduleStatusType - Open, Closed, Archived) ■ CreatedBy (UserId) ■ CreatedAt (DateTime)
- ScheduleStatusType (Static Entity) ○ Purpose: Defines the status of a schedule. ○ Attributes: ■ Id (Integer, Primary Key) ■ Label (Text - "Open", "Closed", "Archived")
- ScheduleRiskItem ○ Purpose: The specific list of risks within a schedule, preserving the version at the time the schedule was created, but with flags for dynamic changes. ○ Attributes: ■ ScheduleRiskItem_Id (Integer, Primary Key) ■ Schedule_Id (Integer, Foreign Key to Schedule) ■ Risk_Id (Integer, Foreign Key to Risk - the master risk) ■ Initial_RiskVersion_Id (Integer, Foreign Key to RiskVersion - the exact version when the schedule was created or when the risk was added to the open schedule) ■ IsLocalGlobalAccepted (Boolean - For Local-Global types, whether it was accepted by the affiliate at the time it was added to the schedule) ■ AssessmentNotes (Long Text - User input) ■ ControlStatus_Id (Integer, Foreign Key to ControlStatusType - Not Started, In Progress, Accepted & Verified, Needs Adjustment) ■ RequiresReassessment (Boolean - Calculated, true if a newer version of the underlying risk exists than Initial_RiskVersion_Id) ■ IsNewlyAdded (Boolean - True if this risk was added to this specific schedule after its creation; applicable for new Local Risks, and new Global/Local-Global risks) ■ LastAssessedBy (UserId) ■ LastAssessedAt (DateTime)
- ControlStatusType (Static Entity) ○ Purpose: Defines the status of risk controls. ○ Attributes: ■ Id (Integer, Primary Key) ■ Label (Text - "Not Started", "In Progress", "Accepted & Verified", "Needs Adjustment")
- UI Suggestions The UI should clearly distinguish between global and local contexts, emphasize versioning, and guide users through dynamic changes during schedules. A. Global Risk Management (Headquarters User Role)
- Global Risk List Screen: ○ Layout: A table displaying all Global and Local-Global Risks. ○ Columns: Risk Code, Risk Type (Global/Local-Global), Current Version (e.g., "1.2"), Description (short snippet), Last Modified Date, Actions. ○ Actions: "View All Versions" (opens a pop-up with a list of all RiskVersion records for that Risk), "Edit Risk" (for the current version), "Create New Risk". ○ Search/Filter: By Risk Type, Risk Code, Keywords. ○ "Create New Risk" Button: Opens a modal or new screen to create a new Risk record and its initial RiskVersion (1.0).
- Risk Detail/Edit Screen (Modal or dedicated screen): ○ Purpose: To create or edit the latest version of a Global or Local-Global Risk. ○ Fields: Risk Code, Risk Type (pre-filled or selectable by HQ), Description, Impact, Likelihood, Category. ○ Save Logic: ■ New Risk: Creates a Risk and RiskVersion (1.0). Sets IsCurrentVersion of RiskVersion to true. ■ Crucial for Open Schedules: After creating the new risk version, trigger a server action (possibly via a BPT process or a dedicated timer) that identifies all currently "Open" Schedule records and creates new ScheduleRiskItem entries for this new Global Risk, setting IsNewlyAdded = True. ■ Editing Existing Risk: Creates a new RiskVersion with MajorVersion remaining same, MinorVersion incremented. Sets IsCurrentVersion of the new version to true and the old version to false. Updates the GlobalRiskGroup_RiskVersion to point to this new RiskVersion_Id within the IsCurrentGlobalGroup GlobalRiskGroupVersion. ○ Version History Section: Display a non-editable list of all previous RiskVersion records for this Risk, with a button to "View Definition" for each. B. Local Affiliate Management (Local Affiliate User Role)
- Local Affiliate Dashboard / Risk Overview: ○ Sections: ■ "My Active Schedules": A card or list showing currently "Open" schedules for this affiliate. Each card could display Schedule Name, Start/End Date, and a "Go to Schedule" button. ■ "My Local Risks": A summary table of Local Risks managed by this affiliate. ■ "Global Risks (Read-Only)": A section displaying Global and Local-Global Risks that are part of the latest GlobalRiskGroupVersion. ■ For Local-Global Risks: Include a column for "My Status" (Accepted/Ignored) and an "Update Status" button which opens a modal for LocalGlobalRisk_AffiliateStatus. This status only applies to the current version. ■ Logic for New Local-Global Risks: When a local affiliate sets the LocalGlobalRisk_AffiliateStatus to 'Accepted' for a Local-Global RiskVersion that was previously not on an open schedule, trigger a server action to create a ScheduleRiskItem for this accepted risk in any currently open schedule, setting IsNewlyAdded = True.
- Local Risk List Screen: ○ Layout: Similar to the Global Risk List, but only for RiskType = Local. ○ Actions: "View All Versions", "Edit Risk", "Create New Local Risk". ○ Edit/Create Logic: Same versioning logic as Global Risks, but impacts LocalRiskGroup_RiskVersion for the IsCurrentLocalGroup LocalRiskGroupVersion for that affiliate. ■ Crucial for Open Schedules: If a new Local Risk is created, trigger a server action to create a new ScheduleRiskItem in any currently open schedule for that affiliate, setting IsNewlyAdded = True.
- Local-Global Risk Decision Screen (Modal): ○ Purpose: For a local affiliate to accept or ignore a specific RiskVersion of a Local-Global Risk. ○ Fields: Local-Global Risk Name, Current Version, Description, Status (Radio buttons: Accepted/Ignored), Reason (optional text area). ○ Save Logic: Creates or updates the LocalGlobalRisk_AffiliateStatus record, setting IsCurrentStatusForAffiliateRisk for the latest decision. As mentioned above, if the status becomes 'Accepted', and there's an open schedule, a new ScheduleRiskItem is created for it. C. Schedule Management (Local Affiliate User Role)
- Schedule Creation Screen: ○ Fields: Schedule Name, Start Date, End Date. ○ Dropdown: "Select Risk Group Version" (Populated with LocalRiskGroupVersion records for the current affiliate, ordered by MajorVersion descending). Default to IsCurrentLocalGroup = True. ○ Logic: On creation, populates ScheduleRiskItem records: ■ It fetches all RiskVersion records linked to the selected LocalRiskGroupVersion_Id (which includes both local risks and the global/local-global risks from the referenced GlobalRiskGroupVersion). ■ For each relevant risk: ■ It creates a ScheduleRiskItem, storing the Risk_Id and the Initial_RiskVersion_Id (the version at the time of schedule creation). ■ For Local-Global Risks, it also populates IsLocalGlobalAccepted based on the IsCurrentStatusForAffiliateRisk from LocalGlobalRisk_AffiliateStatus for that LocalAffiliate_Id and RiskVersion_Id at the moment of schedule creation. ■ IsNewlyAdded and RequiresReassessment flags are initially False for all these ScheduleRiskItems as they are baseline at creation.
- Open Schedule Detail Screen (The Core Experience): ○ Layout: A dynamic table/list of ScheduleRiskItem records. ○ Key Columns: ■ Risk Name & Code ■ Initial Version (at Schedule Creation/Addition): Display Initial_RiskVersion_Id's VersionNumberDisplay. ■ Current Version Status & Cues: ■ New Version Available Flag: If ScheduleRiskItem.Initial_RiskVersion_Id is NOT the IsCurrentVersion for that Risk_Id, display a clear visual cue (e.g., a red exclamation mark icon or a "New Version: X.X" badge). This means RequiresReassessment is True. ■ Newly Added Risk Flag: If ScheduleRiskItem.IsNewlyAdded is true, display a green "NEW" badge. ■ User Action: On hover or click of the cue, a tooltip or modal pops up showing: ■ "Original Version (as in schedule): X.X (Description Snippet)" ■ "Latest Current Version: Y.Y (Description Snippet) - [Link to View Full Definition Comparison]" (This refers to the IsCurrentVersion of the Risk) ■ "All Available Versions: [List of X.X, X.Y, Y.Z... with links to View Definition]" ■ Local-Global Status (if applicable): Displays "Accepted" or "Ignored" based on IsLocalGlobalAccepted. ■ Assessment Notes: Text area for user input. ■ Control Status: Dropdown (ControlStatusType). ■ Actions: "Save Assessment", "View Risk Details (Current Version)", "View Risk Definition History". ○ Dynamic Updates During Open Schedule (Automated Logic): ■ Backend Logic (Timer/Batch Job, or on relevant HQ/Local Risk Update event): A process that either runs periodically (e.g., hourly) or is directly triggered by any RiskVersion creation (for IsCurrentVersion = True), or LocalGlobalRisk_AffiliateStatus becoming 'Accepted'. ■ For Updated Risks: ■ Identifies all "Open" Schedule records. ■ For each ScheduleRiskItem in an open schedule that was not initially added (IsNewlyAdded = False): ■ Get the Risk_Id from ScheduleRiskItem. ■ Find the IsCurrentVersion for that Risk_Id from RiskVersion. ■ Compare ScheduleRiskItem.Initial_RiskVersion_Id with the IsCurrentVersion's ID. ■ If different, set ScheduleRiskItem.RequiresReassessment = True. ■ For Newly Added Risks (the key correction): ■ For new Global Risks (after HQ creates a v1.0): ■ Query all RiskVersion records where RiskType = Global, MajorVersion = 1, MinorVersion = 0 (i.e., newly created Global Risks). ■ For each such new Global Risk, identify all "Open" Schedule records. ■ For each open Schedule, check if a ScheduleRiskItem for this Risk_Id already exists. ■ If not, create a new ScheduleRiskItem: Set Risk_Id, Initial_RiskVersion_Id (to the new Global Risk's v1.0 ID), and IsNewlyAdded = True. ■ For new Local-Global Risks (after HQ creates a v1.0 AND local affiliate accepts it): ■ Query all LocalGlobalRisk_AffiliateStatus where Status_Id = Accepted and IsCurrentStatusForAffiliateRisk = True for a RiskVersion that is RiskType = LocalGlobal, MajorVersion = 1, MinorVersion = 0. ■ For each accepted new Local-Global Risk, identify the relevant "Open" Schedule for that LocalAffiliate_Id. ■ Check if a ScheduleRiskItem for this Risk_Id exists in that schedule. ■ If not, create a new ScheduleRiskItem: Set Risk_Id, Initial_RiskVersion_Id (to the new Local-Global Risk's v1.0 ID), IsLocalGlobalAccepted = True, and IsNewlyAdded = True. ■ For new Local Risks (after Local Affiliate creates a v1.0): ■ Query all RiskVersion records where RiskType = Local, MajorVersion = 1, MinorVersion = 0 (i.e., newly created Local Risks). ■ For each such new Local Risk, identify the "Open" Schedule for its LocalAffiliate_Id. ■ Check if a ScheduleRiskItem for this Risk_Id already exists in that schedule. ■ If not, create a new ScheduleRiskItem: Set Risk_Id, Initial_RiskVersion_Id (to the new Local Risk's v1.0 ID), and IsNewlyAdded = True. ○ User Interaction (Frontend on Schedule Screen): ■ Highlighting: Use OutSystems UI conditional formatting to apply styles (e.g., background color, bold text) to rows where RequiresReassessment is true or IsNewlyAdded is true. ■ Guidance Message: At the top of the schedule screen, a dynamic message could appear: "New risks or updated versions require your attention. Please review highlighted items." ■ Reassessment Flow: ■ If a risk is highlighted as "New Version Available" (RequiresReassessment = True): The user clicks the cue, reviews the changes (via "View Full Definition Comparison"). ■ If controls are still good: They select "Accepted & Verified" in ControlStatus and click "Save Assessment". The system should then reset RequiresReassessment to False for this ScheduleRiskItem and update Initial_RiskVersion_Id to the current latest version of the risk. ■ If controls need adjustment: They update AssessmentNotes, change ControlStatus to "Needs Adjustment," update control values (if applicable in a separate control management screen), and then "Save Assessment". This will clear the RequiresReassessment flag for that ScheduleRiskItem once the action is completed, and update Initial_RiskVersion_Id. ■ If a risk is highlighted as "NEW" (IsNewlyAdded = True): The user proceeds to assess it as a new risk, filling in notes and setting ControlStatus. Once saved, the system should reset IsNewlyAdded to False for that ScheduleRiskItem. D. Reporting & Auditing ● Risk Version History Report: Allow users (especially HQ) to query all versions of a specific risk, showing creation date, who modified it, and all attributes of each version. ● Schedule History Report: For any closed or archived schedule, view its full state, including the specific versions of risks it was tied to. This is crucial for audit trails. ● Audit Trails: Implement robust audit logging for all changes to Risk, RiskVersion, GlobalRiskGroupVersion, LocalRiskGroupVersion, LocalGlobalRisk_AffiliateStatus, and ScheduleRiskItem (especially status and notes).
- OutSystems Implementation Best Practices ● Modules: Structure your application into logical modules (e.g., Core RiskManagement module for entities and core logic, HQ module for global screens, LocalAffiliate module for local screens, Common for static entities and reusable blocks). ● Server Actions: Encapsulate all data manipulation logic (creating new versions, updating IsCurrentVersion flags, populating GlobalRiskGroup_RiskVersion, and critically, managing the dynamic creation/update of ScheduleRiskItem entries) in well-defined server actions. This ensures data integrity and reusability. ● Timers/BPT: Use OutSystems Timers for automated annual major version creation of GlobalRiskGroupVersion and LocalRiskGroupVersion. More importantly, use Timers or Business Process Technology (BPT) to manage the dynamic update of ScheduleRiskItem records when Global Risks or Local-Global Risks are added/changed by HQ, or when Local Risks are added/changed by affiliates. This background processing will maintain the RequiresReassessment and IsNewlyAdded flags correctly. ● Aggregates/SQL: Optimize data retrieval using Aggregates for simple queries and Advanced SQL for complex joins and logic (e.g., finding the latest version of a risk, comparing versions for RequiresReassessment, identifying new risks to add to schedules). ● UI Patterns: Leverage OutSystems UI components like Tables, Cards, Modals, Tabs, and Date Pickers for a consistent and intuitive user experience. Use Conditional Formatting extensively on the schedule screen to highlight risks needing attention. ● Security: Implement robust security roles (e.g., HQ_Admin, Local_Admin, Local_User) and apply them at the screen and server action level. This updated solution addresses the critical point about newly added Global/Local-Global risks appearing in open schedules, making the system truly dynamic and responsive to changes during active assessment periods.
Assistant
Requirements Documentation for OutSystems Risk Management System
#Epic: Global Risk Management and Versioning System
#User Stories
-
Global Risk Creation and Management
- As a headquarters user, I want to create and manage global risks that apply across the organization
- As a headquarters user, I want to version global risks to maintain a clear historical record
- As a local affiliate user, I want to view global risks in a read-only format
-
Local Risk Management
- As a local affiliate user, I want to create and manage risks specific to my local context
- As a local affiliate user, I want to version local risks for accurate tracking
- As a local affiliate user, I want to accept or ignore local-global risks based on my operational context
-
Dynamic Schedule Management
- As a local affiliate user, I want to create risk assessment schedules based on current risk groups
- As a local affiliate user, I want to be notified of new or updated risks during an open schedule
- As a local affiliate user, I want to resolve and reassess risks that have been updated during an active schedule
#Use Cases
-
Global Risk Creation
- Actor: Headquarters User
- Preconditions:
- User has appropriate access rights
- Risk attributes are defined
- Main Flow:
- User selects "Create New Risk"
- Enters risk details (code, type, description, impact, likelihood)
- System creates initial risk version (1.0)
- System updates GlobalRiskGroup with new risk version
- Post-conditions:
- New risk is created
- Risk is added to current GlobalRiskGroup
- Notification sent to relevant local affiliates
-
Local Affiliate Risk Assessment
- Actor: Local Affiliate User
- Preconditions:
- Active schedule exists
- Risk group version is selected
- Main Flow:
- User reviews risks in schedule
- Identifies new or updated risks
- Assesses risk controls
- Updates risk assessment status
- Post-conditions:
- Risk assessment is documented
- Control status is updated
- Schedule is updated with latest risk versions
-
Dynamic Risk Update Handling
- Actor: System
- Preconditions:
- Open schedules exist
- New risk versions are created
- Main Flow:
- System detects new risk versions
- Flags affected schedule risk items
- Notifies users of required reassessment
- Allows users to resolve new versions
- Post-conditions:
- Schedule risk items are updated
- Reassessment flags are cleared
- Audit trail is maintained
#Test Cases
-
Global Risk Versioning
-
Test Create New Global Risk
- Verify risk is created with version 1.0
- Confirm GlobalRiskGroup is updated
- Check notification mechanism
-
Test Global Risk Update
- Create initial global risk
- Update risk details
- Verify minor version increments
- Confirm old version is preserved
-
-
Local Affiliate Risk Management
-
Test Local Risk Creation
- Create local risk for specific affiliate
- Verify risk is versioned
- Confirm only that affiliate can modify
-
Test Local-Global Risk Acceptance
- Create local-global risk
- Have local affiliate accept/ignore
- Verify status is recorded
- Check schedule update mechanism
-
-
Schedule Dynamic Updates
-
Test New Risk Addition to Open Schedule
- Create open schedule
- Add new global/local-global risk
- Verify risk appears in schedule
- Confirm "Newly Added" flag is set
-
Test Risk Version Update During Schedule
- Create open schedule
- Update existing risk version
- Verify "New Version Available" flag
- Test reassessment workflow
-
-
Schedule Closure Validation
- Test Prevent Schedule Closure
- Create open schedule with unresolved risks
- Attempt to close schedule
- Verify system prevents closure
- Confirm user must resolve all flagged items
- Test Prevent Schedule Closure
-
Versioning Integrity
- Test Annual Major Version Creation
- Verify GlobalRiskGroup major version increments annually
- Confirm historical versions are preserved
- Check local affiliate can reference previous versions
- Test Annual Major Version Creation
Additional Considerations
- Implement robust audit logging
- Ensure data integrity across versioning
- Provide clear user guidance for risk management
- Design intuitive UI for complex versioning concepts
Recommended Testing Approach
- Unit Testing: Individual component functionality
- Integration Testing: Interaction between global and local risk management
- User Acceptance Testing: Workflow and usability
- Performance Testing: Handling large numbers of risks and versions
- Security Testing: Access controls and data protection
-