Based on the search results, here's a comparison of the estimated annual raw ore extraction tonnage at the Cigar Lake and McArthur River mines:
It is challenging to find precise, consistently reported figures for the annual raw ore tonnage extracted for both mines, as public reports often focus on the production of uranium concentrate (U3O8). However, some sources provide information that allows for estimations or give figures for specific past years.
Cigar Lake:
- Based on recent information from Cameco (the operator), the average mine production varies annually from 115 to 160 tonnes of ore per day [1, 12, 16][1].
- Estimating based on a 365-day year, the annual raw ore extraction at Cigar Lake is in the range of approximately 41,975 to 58,400 tonnes per year.
- A 2014 report mentions an ore tonnage of 3,318 tonnes for that year [7], and an expected maximum production around 2018 that would yield nearly 7,000 tonnes of uranium per year (which is concentrate, not raw ore) [1].
- Another source from 2014 mentions that annual production should reach 8,100 tonnes of uranium concentrate by 2018 [11].
McArthur River:
- According to a 2015 report from Cameco, McArthur River can produce over 19 million pounds of uranium concentrate per year by mining only 150 to 200 tonnes of ore per day [9].
- Estimating based on a 365-day year, the annual raw ore extraction at McArthur River is in the range of approximately 54,750 to 73,000 tonnes per year.
- A 2020 document mentions that Phase 3 of the McArthur River Mine increased ore production from 2.5 million tonnes per annum to 5.5 million tonnes per annum [14][2]. This figure appears significantly higher than the estimates based on daily production rates in other, potentially more recent, reports focusing on uranium production. It's possible this higher figure from [14] includes a different type of material or refers to a broader operational capacity that is not solely raw uranium ore being sent for processing. Given that Cameco's reports on uranium production provide daily ore tonnage figures that result in much lower annual estimates, the 2.5 to 5.5 million tonnes figure might encompass other mined materials or be from a different operational context (McArthur River also has lead and zinc in some areas, although primarily known for uranium). Another 2014 report gives ore tonnage of 108,394 and 328,126 tonnes for previous years, but the context suggests these might be related to specific phases or reporting methods [3, 7].
- Older information from 1999 mentioned production would be progressively increased to around 7,000 tonnes of uranium (concentrate) per year by 2002 [4][3]. In 2014, its production represented about 7,356 tonnes of uranium (concentrate) [19][4].
Comparison:
Based on the more recent figures regarding daily ore mining rates provided by Cameco for their uranium operations [1, 9, 12, 16], the estimated annual raw ore extraction tonnage for McArthur River (54,750 to 73,000 tonnes) appears to be slightly higher than that of Cigar Lake (41,975 to 58,400 tonnes).
It is crucial to understand that these are high-grade uranium mines. This means that a relatively small amount of raw ore yields a large amount of uranium concentrate compared to mines with lower ore grades.
For context on the final product (uranium concentrate - U3O8) production, which is more consistently reported:
- Cigar Lake produced 16.9 million pounds (approx. 7,665 tonnes) of U3O8 in 2024 (on a 100% basis) [4].
- McArthur River/Key Lake produced 20.3 million pounds (approx. 9,208 tonnes) of U3O8 in 2024 (on a 100% basis) [6].
These concentrate figures show that McArthur River/Key Lake currently has a higher annual production of the final uranium product compared to Cigar Lake/McClean Lake, aligning with the estimation that it also extracts a slightly higher tonnage of raw ore based on the provided daily rates. The much higher annual ore tonnage figure mentioned in [14] for McArthur River requires caution in direct comparison with the daily rate estimates for uranium ore.