Skip to content
The Chat Archive
Perplexitysonar-pro· PerplexityHugging Face LMArena Search Arena 24K

What does the Ontario building code requires when it comes to spacing between electrical…

From a Chatbot Arena battleThe same person sent this prompt to two anonymous models at once. Compare it with Perplexitysonar-reasoning’s answer.
  1. User

    What does the Ontario building code requires when it comes to spacing between electrical outlets in residential dwellings

  2. Perplexity Assistant

    Based on the Ontario Building Code requirements, here are the key points regarding electrical outlet spacing in residential dwellings:

    1. General living areas:
    • Receptacles shall be installed so that no point along the floor line of any usable wall space is more than 1.8 m (6 feet) horizontally from a receptacle[3][4].
    1. Kitchens:
    • Receptacles shall be installed so that no point along the wall line at counter work surfaces is more than 900 mm (3 feet) from a receptacle[3][5].
    • At least one receptacle must be installed at each permanently fixed island or peninsular counter space with a continuous long dimension of 600 mm (2 feet) or greater and a short dimension of 300 mm (1 foot) or greater[5].
    1. Hallways:
    • At least one receptacle shall be installed in hallways that are 3 m (10 feet) or more in length[4].
    1. Bathrooms:
    • At least one receptacle shall be installed within 1 m (3 feet) of the basin location[2].
    1. Other requirements:
    • Any wall space 900 mm (3 feet) or more in width requires a receptacle[4].
    • Receptacles are not required in wall spaces occupied by fixed appliances, sinks, ranges or countertops[3].
    1. GFCI protection:
    • All receptacles within 1.5 m (5 feet) of sinks must be GFCI-protected[2].
    1. Dedicated circuits:
    • Kitchens require at least two 20-amp circuits for counter receptacles[4].

    It's important to note that these are general guidelines, and specific requirements may vary depending on the exact layout and use of spaces. Always consult with a licensed electrical contractor or local building authority for the most up-to-date and specific requirements for your project.

Responses were produced in different, uncontrolled contexts (system prompts, settings, prior turns). This is not a benchmark.