You are absolutely right! My apologies. The previous response provided a high-level overview of functional requirements. Let's dive into a more detailed breakdown of the functional requirements, making them more specific and actionable for a BIM-Digital Twin-OCC integration. I'll organize them by functional area for clarity.
2.3 Detailed Functional Requirements (OCC User Experience) - Expanded
This section provides a granular breakdown of the functional requirements, detailing what the system must do, how it should behave, and what the expected user experience is. Each requirement includes acceptance criteria.
I. 3D Visualization & Navigation
- FR-VIS-001: 3D Model Navigation:
- Description: The system shall allow users to navigate the 3D model using standard controls: orbit, pan, zoom, and walk-through.
- Behavior: Navigation should be smooth and responsive, with minimal lag. The camera should maintain a consistent frame rate (at least 30 FPS).
- Acceptance Criteria: Users can navigate the entire building model within 3 minutes. No noticeable lag or stuttering during navigation.
- FR-VIS-002: Discipline Isolation:
- Description: The system shall allow users to isolate specific disciplines (e.g., HVAC, Electrical, Plumbing, Structural) to focus on particular systems.
- Behavior: Users can toggle the visibility of different layers or components within the 3D model. Isolated disciplines should be visually distinct (e.g., different colors).
- Acceptance Criteria: Users can easily switch between disciplines with a single click. Isolated disciplines are clearly identifiable.
- FR-VIS-003: "X-Ray" View:
- Description: The system shall provide an "X-Ray" view allowing users to see through walls and ceilings to visualize underlying systems.
- Behavior: Users can toggle the transparency of walls and ceilings. The "X-Ray" view should be visually clear and easy to interpret.
- Acceptance Criteria: Users can easily toggle the "X-Ray" view. Underlying systems are clearly visible without obscuring the primary view.
- FR-VIS-004: Floor Plan Overlay:
- Description: The system shall allow users to overlay 2D floor plans onto the 3D model for reference.
- Behavior: Floor plans should be accurately aligned with the 3D model. Users can adjust the transparency and scale of the floor plan overlay.
- Acceptance Criteria: Floor plans are accurately aligned with the 3D model within 1 cm. Users can easily adjust the floor plan overlay.
- FR-VIS-005: Custom View Presets:
- Description: The system shall allow users to save and recall custom 3D views (e.g., a specific view for a particular incident).
- Behavior: Users can save views with descriptive names. Saved views can be recalled with a single click.
- Acceptance Criteria: Users can save and recall at least 10 custom views. Saved views are easily accessible.
II. Alarm & Event Management
- FR-ALM-001: Contextual Alarm Display:
- Description: Alarms shall be displayed visually on the 3D model, highlighting the affected asset or zone.
- Behavior: Alarms should be visually distinct (e.g., color-coded, flashing). Clicking an alarm should "fly" the user to the location of the alarm.
- Acceptance Criteria: Alarms are clearly visible on the 3D model. Clicking an alarm navigates the user to the correct location.
- FR-ALM-002: Alarm Prioritization:
- Description: Alarms shall be prioritized based on severity (e.g., critical, warning, informational).
- Behavior: Alarms should be visually differentiated based on their priority (e.g., different colors, icons).
- Acceptance Criteria: Alarms are clearly prioritized. Users can easily identify the most critical alarms.
- FR-ALM-003: Alarm Filtering:
- Description: Users shall be able to filter alarms based on various criteria (e.g., system, asset, priority, time).
- Behavior: Users can apply filters through a user-friendly interface. The 3D model and alarm list should update automatically based on the applied filters.
- Acceptance Criteria: Users can apply multiple filters simultaneously. The 3D model and alarm list update quickly after applying filters.
- FR-ALM-004: Alarm Details Panel:
- Description: Clicking an alarm should display a detailed panel with relevant information (e.g., alarm description, timestamp, affected asset, related data).
- Behavior: The details panel should be easily accessible and provide a comprehensive overview of the alarm.
- Acceptance Criteria: The details panel displays all relevant alarm information. The panel is easy to read and understand.
- FR-ALM-005: Alarm Acknowledgement & Escalation:
- Description: Users shall be able to acknowledge alarms and escalate them to other personnel.
- Behavior: Users can acknowledge alarms through the interface. Escalation should trigger notifications to designated personnel.
- Acceptance Criteria: Users can acknowledge alarms with a single click. Escalation notifications are sent to the correct personnel.
III. Asset Information & Management
- FR-ASST-001: Asset Identification & Lookup:
- Description: Users shall be able to easily identify and locate assets within the 3D model.
- Behavior: Assets should be clearly labeled with their unique identifiers. Users can search for assets by name, ID, or other criteria.
- Acceptance Criteria: Assets are clearly labeled. Users can quickly find assets using the search function.
- FR-ASST-002: Asset Data Display:
- Description: Clicking an asset should display a panel with detailed asset information (e.g., specifications, manufacturer details, maintenance history).
- Behavior: The asset data panel should be comprehensive and easy to understand.
- Acceptance Criteria: The asset data panel displays all relevant asset information. The information is presented in a clear and organized manner.
- FR-ASST-003: Maintenance History Visualization:
- Description: The system shall visualize maintenance history data associated with an asset (e.g., work orders, repair logs) within the 3D model or a dedicated panel.
- Behavior: Maintenance history should be displayed chronologically. Users should be able to filter the history by date range or type of maintenance.
- Acceptance Criteria: Maintenance history is displayed chronologically. Users can filter the history by date range and maintenance type.
- FR-ASST-004: Link to CMMS Work Orders:
- Description: Users shall be able to directly access related work orders in the CMMS from the asset data panel.
- Behavior: A link to the CMMS work order should be provided. Clicking the link should open the work order in the CMMS.
- Acceptance Criteria: A link to the CMMS work order is provided. Clicking the link opens the work order in the CMMS.
IV. Simulation & Reporting
- FR-SIM-001: Scenario Simulation:
- Description: The system shall allow users to simulate various scenarios (e.g., equipment failure, power outage, emergency evacuation) to assess their impact.
- Behavior: Users can define scenario parameters (e.g., equipment failure time, power outage duration). The system should simulate the scenario and display the results in the 3D model.
- Acceptance Criteria: Users can define scenario parameters. The system accurately simulates the scenario and displays the results.
- FR-REP-001: Custom Report Generation:
- Description: Users shall be able to generate custom reports based on various data points (e.g., alarm history, asset performance, energy consumption).
- Behavior: Users can select the data points to include in the report. The report should be generated in a user-friendly format (e.g., PDF, CSV).
- Acceptance Criteria: Users can select data points for the report. The report is generated in a user-friendly format.
Important Notes:
- User Roles & Permissions: All functional requirements must be tied to specific user roles and permissions. (e.g., only authorized personnel can acknowledge alarms, only maintenance managers can access maintenance history).
- Performance: All functional requirements must meet specified performance