Here are several approaches to eliminate the ATS as a single point of failure while maintaining redundancy:
Direct Connection (Simplest)
Connect each power supply directly to a different UPS line. This works if:
- Your equipment has dual power supplies that can share the load (active-active) or failover (active-passive)
- The power supplies can handle the full load independently
- Your equipment can tolerate brief power interruptions during UPS switching
Dual ATS Configuration
Install two ATS units, one for each power supply:
- ATS 1: UPS A (primary) → UPS B (backup) → Power Supply 1
- ATS 2: UPS B (primary) → UPS A (backup) → Power Supply 2
- This ensures no single ATS failure affects both supplies
- Stagger the primary sources to balance load
Redundant PDUs with ATS
Use dual PDUs with built-in automatic transfer capability:
- Each PDU connects to both UPS lines
- Power Supply 1 → PDU 1
- Power Supply 2 → PDU 2
- Many server-grade PDUs include automatic transfer functionality
Manual Transfer Panels
If automatic switching isn't critical:
- Install manual transfer switches or dual-input panels
- Allows manual selection between UPS sources
- More cost-effective but requires human intervention
Considerations:
- Verify your power supplies support the chosen configuration
- Check if they're true redundant supplies (N+1) or just load-sharing
- Ensure proper grounding and phase matching between UPS sources
- Consider adding local circuit protection (breakers) for each path
Which approach best fits your equipment specifications and uptime requirements?