| 1. Groundwater Prospects Mapping in Complex Terrains | • Objective: Prepare high-resolution (1:25,000/1:10,000) groundwater maps for water-scarce regions. • ISRO/DOS Role: Acquire/process satellite imagery, analyze geological data, and train state agencies. • Industry Role: Conduct field validation in pilot areas (e.g., Bundelkhand, Rajasthan). • Timeline: 18 months. | • Objective: Scale mapping to a national level. • ISRO/DOS Role: Develop and deploy automated groundwater assessment tools. • Industry Role: Integrate the mapping outputs with state-level water management systems. • Timeline: 4–5 years. |
| 2. Groundwater Information System (GWIS) Portal | • Objective: Develop and deploy a centralized web portal at DDWS, New Delhi for groundwater data. • ISRO/DOS Role: Design portal architecture; integrate satellite-derived groundwater data. • Industry Role: Provide UI/UX support and train DDWS personnel. • Timeline: 24 months. | • Objective: Expand the portal for statewide/district-level access. • ISRO/DOS Role: Provide real-time satellite data integration and technical support. • Industry Role: Develop mobile apps and advanced visualization tools for field users. • Timeline: 3–5 years. |
| 3. Site Suitability for Multi-Village Water Pipelines | • Objective: Identify optimal pipeline routes in 50 water-scarce villages. • ISRO/DOS Role: Provide high-resolution DEM and conduct terrain analysis. • Industry Role: Apply GIS-based route optimization methods. • Timeline: 24 months. | • Objective: Expand the route optimization to cover 500+ villages. • ISRO/DOS Role: Develop AI-driven models for route selection. • Industry Role: Support cost–benefit analyses and robust field validations. • Timeline: 5+ years. |
| 4. Salt Water Intrusion (SWI) Hotspot Mapping | • Objective: Map SWI hotspots in 10 coastal districts (e.g., Gujarat, Tamil Nadu). • ISRO/DOS Role: Utilize SAR/optical satellite data for salinity and vegetation stress detection. • Industry Role: Execute ground truthing through water sampling and data validation. • Timeline: 12 months. | • Objective: Incorporate SWI insights into coastal management plans with early warning systems. • ISRO/DOS Role: Develop and calibrate early warning protocols. • Industry Role: Build community awareness and outreach tools. • Timeline: 4 years. |
| 5. Bacteriogenic Contamination Hotspot Mapping | • Objective: Identify bacteriogenic contamination hotspots in 100 districts under the Swachh Bharat Mission. • ISRO/DOS Role: Perform geospatial analysis of water quality data. • Industry Role: Develop GIS dashboards for local government use (e.g., Gram Panchayats). • Timeline: 18 months. | • Objective: Integrate contamination data with existing sewage and wastewater management systems. • ISRO/DOS Role: Merge satellite-based data with IoT sensor networks for real-time monitoring. • Industry Role: Provide training and support for health workers on data interpretation. • Timeline: 3–5 years. |
| 6. Geo-Spatial Site Selection for Water Harvesting Structures | • Objective: Identify over 500 sites for water harvesting structures in water-stressed blocks. • ISRO/DOS Role: Generate necessary thematic layers (soil, rainfall, land use) and conduct spatial analysis. • Industry Role: Execute multi-criteria analysis and perform field validation. • Timeline: 24 months. | • Objective: Monitor the impact of these structures on water availability using satellite data. • ISRO/DOS Role: Track water table variations using advanced systems (e.g., GRACE-FO data). • Industry Role: Develop detailed assessment reports for regional authorities. • Timeline: 5+ years. |