We refer to your letter ref. 27/M-484/AMC/MSAEC/25 (1) dated 03 June 2025, we would like…
- User
We refer to your letter ref. 27/M-484/AMC/MSAEC/25 (1) dated 03 June 2025, we would like to formally clarify our position as follows: The project has encountered multiple delays that have impacted overall progress, that includes major delays in issuing the IFC drawings, delays in obtaining the Design NOCs, and a significant increase in the sewer network length, which has nearly doubled the original contract quantities and other events detailed in our EOT claim submitted via letter ref. 27/M-484/AMC/MSAEC/25 (3) dated 03 June 2025. The Contractor has taken all necessary mitigation measures and successfully reduced the impact of these delays as much practically possible, as demonstrated in the submitted delay analysis (ref. 2). Furthermore, as the Engineer is aware, the NDRC works along Al Amardi Street were not part of the original contract scope and have introduced unique challenges. These include dense underground utility congestion, high-risk working conditions, and execution within traffic-sensitive zones—resulting in a level of complexity that is significantly higher than that encountered in other NDRC lines. It should also be noted that, as discussed in the same meeting, the required NOC for the above section was to be secured by 20 June 2025—which is today—and we regret to note that it has not yet been obtained. This delay will directly impact the Contractor’s ability to meet the Employer's targeted completion date. In light of the above, and in accordance with the provisions of the Contract, the Contractor maintains its entitlement to an Extension of Time up to 31 October 2025. However, we wish to reaffirm that this entitlement does not reflect any intention to delay the works. In good faith, and in line with the discussions held with the Employer and Engineer, the Contractor remains fully committed to minimizing delays to the extent reasonably possible. In view of the above, we respectfully request the Engineer to proceed with issuing the full assessment of the submitted EOT under the cover of our letter ref. (3), in accordance with the terms and conditions of the Contract. redraft this letter with conclusion to move forward
Other models, same or similar prompt
Responses were produced in different, uncontrolled contexts (system prompts, settings, prior turns). This is not a benchmark.