- Throttle valve 1, 2, and 3 body seat preheated and welded with LH106 welding rod.
- Throttle valves blue matching done and assembled.
- ESV seating blue matched and assembled.
- Front and rear bearing top provided and sealed.
- LP cylinder parts cleaned for assembling purpose.
- Accumulator pressure checked, pressure registered 10kg, required pressure 20kg. Required nitrogen gas to fill the accumulator.
- Turbine inner case seating area stag B applied and final box up done.
- Top casing levelling done, tomorrow morning to be final box up done.