The existing hardware setup covers seven sites: BHD, CTB, KCCS, MAW, NPO, SKC and VTC.…
- User
The existing hardware setup covers seven sites: BHD, CTB, KCCS, MAW, NPO, SKC and VTC. At each location, there’s a mix of server groups and terminal processors, all designed with redundancy and reliability in mind. Every piece of equipment is supported by dual power supplies and 3 Ethernet cable including dual LAN connections, a standalone iLO cables are in place, A KVM connections for direct console access. Below is a detailed breakdown of the hardware deployment across these locations:
edit the above as its not mix of server groups, instead only one type of server will be used, which is DL380 gen11
- Assistant
Certainly! Here's the revised version of your text reflecting that only one type of server, the DL380 Gen11, will be used: