What is some information about the operations of St. Louis MetroLink light rail?
- User
What is some information about the operations of St. Louis MetroLink light rail?
Assistant
Here's an overview of St. Louis MetroLink light rail operations:
System Basics:
- Opened: July 1993
- Operator: Bi-State Development Agency (Metro Transit)
- Total Lines: 2 lines (Red and Blue)
- Track Miles: Approximately 46 miles
- Stations: 38 total stations
- Gauge: Standard (4 ft 8.5 in)
- Power: Overhead catenary, 750V DC
- Fleet: Siemens SD-400 and SD-700 light rail vehicles
Lines:
- Red Line: Runs from Lambert Airport to Shrewsbury
- Blue Line: Runs from Shrewsbury to Scott Air Force Base/Belleville, Illinois
Significant Characteristics:
- Crosses Mississippi River between Missouri and Illinois
- Serves major destinations like downtown St. Louis, airport, universities, sports venues
- Connects multiple jurisdictions (St. Louis City, St. Louis County, St. Clair County, Illinois)
Technical Details:
- Mostly at-grade and elevated alignment
- Some underground sections in downtown St. Louis
- Integrated fare system with MetroBus
- Operates 7 days a week
- Typical service hours: 4:30 AM - 12:30 AM
Other models, same or similar prompt
Responses were produced in different, uncontrolled contexts (system prompts, settings, prior turns). This is not a benchmark.