Portfolio P's expected return is 16%. The expected return of the market portfolio M is…
- User
Portfolio P's expected return is 16%. The expected return of the market portfolio M is 12%. Both P and M have standard deviations of 20%, their correlation is 75%, and the riskless rate is 3%. What is portfolio P's information ratio?
Group of answer choices
0.57
0.87
0.27
0.97
0.37
0.47
0.77
0.67
0.17
0.07
- Assistant
The information ratio (IR) measures a manager’s excess return relative to the benchmark per unit of “active” (tracking-error) risk.
Step 1 – Active (excess) return
E[Rp] – E[Rm] = 16 % – 12 % = 4 % (0.04)Step 2 – Tracking-error standard deviation
σ²(Rp – Rm) = σ²p + σ²m – 2 Cov(Rp,Rm)• σp = σm = 20 % ⇒ σ²p = σ²m = 0.20² = 0.04
• ρpm = 0.75 ⇒ Cov(Rp,Rm) = ρpm σp σm = 0.75 × 0.20 × 0.20 = 0.03σ²(Rp – Rm) = 0.04 + 0.04 – 2(0.03) = 0.08 – 0.06 = 0.02 Tracking error σ(Rp – Rm) = √0.02 ≈ 0.1414 (14.14 %)
Other models, same or similar prompt
Responses were produced in different, uncontrolled contexts (system prompts, settings, prior turns). This is not a benchmark.