In a PID (Proportional-Integral-Derivative) feedback loop, the value you're trying to control for is most commonly called the:
- Setpoint (SP): This is the standard, most widely used term in control engineering and industry. It's the target value you want the process variable to achieve and maintain.
Other common and valid terms include:
- Reference (Ref or R): Often used interchangeably with setpoint, especially in academic contexts or more complex control theory.
- Desired Value: A descriptive, less technical term meaning exactly what it says.
- Command Value: Emphasizes that it's the input signal commanding the system what to do.
Key distinctions:
- Setpoint/Reference/Desired Value/Command Value: This is the target you input into the controller.
- Process Variable (PV): This is the actual, measured value of the thing you're controlling (e.g., temperature, speed, level, position).
- Error (e): This is the difference between the Setpoint and the Process Variable (
e = SP - PV). The PID controller calculates its output based entirely on this error signal to drive the PV towards the SP.
Visualizing the PID Loop:
+------+ +-------+ +--------+ +---------+
SP -->| |-- e -->| | | | | | +------+
| Sum | | PID |-- u -->| Plant |-- y -->| Process |--+-->| PV |
| | |Controller| |(System)| |(Sensor)| | |(Actual|
+----| | +-------+ +--------+ +---------+ | |Value)|
| +------+ | +------+
| |
| |
+----------------------------------------------------------------------+
In this diagram:
- SP is the Setpoint (the value you're trying to control for).
- PV is the Process Variable (the actual measured value).
- e is the Error (SP - PV).
- u is the Control Output (the signal the PID calculates to drive the system).
- y is the Output of the plant/system.
So, while "desired value" or "reference" are correct, "Setpoint (SP)" is the most precise and universally recognized term in PID control contexts.