Give me everything about HTR-PM
- User
Give me everything about HTR-PM
Assistant
Other models, same or similar prompt
Responses were produced in different, uncontrolled contexts (system prompts, settings, prior turns). This is not a benchmark.
Give me everything about HTR-PM
Responses were produced in different, uncontrolled contexts (system prompts, settings, prior turns). This is not a benchmark.
The HTR-PM (High Temperature Reactor – Pebble-bed Module), also known as the Shidaowan-1, is a Generation IV nuclear reactor developed in China. It represents a significant advancement in nuclear technology due to its unique design, inherent safety features, and potential for diverse applications beyond electricity generation.
| Feature | Description |
|---|---|
| Full Name | High Temperature Reactor - Pebble Bed Module |
| Type | Very High Temperature Gas-Cooled Reactor (VHTR) |
| Developer | Tsinghua University (Institute of Nuclear and New Energy Technology) + China Huaneng Group, China National Nuclear Corporation (CNNC), Tsinghua University |
| Location | Shidaowan, Haiyang, Shandong Province, China |
| Status | Commercial operation started in 2023 |
| Fuel Type | Uranium dioxide TRISO particles embedded in graphite pebbles |
| Coolant | Helium gas |
| Thermal Output | 250 MWt per module |
| Electrical Output | ~100 MWe net (with steam turbine generator) |
| Design Life | 40 years (upgradable to 60) |
| Parameter | Value |
|---|---|
| Core Configuration | Cylindrical annular core |
| Moderator | Graphite |
| Coolant | Helium |
| Outlet Temperature | Up to 750°C |
| Fuel Form | TRISO-coated UO₂ particles in graphite pebbles |
| Enrichment Level | ~8–10% U-235 |
| Refueling | Continuous, online refueling |
| Burn-up | ~90,000 MWd/tHM |
| Neutron Spectrum | Thermal |
| Plant Efficiency | ~40% electrical (steam cycle) |
| Annual Uranium Consumption | ~1.8 tons per 200 MWe plant |
| Benefit | Description |
|---|---|
| Inherent Safety | No meltdown risk even in worst-case scenarios. |
| High Efficiency | High operating temperature improves thermal efficiency. |
| Flexible Use | Suitable for electricity, heat, and hydrogen production. |
| Low Waste | Produces less high-level waste compared to LWRs. |
| Non-Proliferation Friendly | High burn-up and coated particle fuel complicate weaponization. |
| Online Refueling | Reduces downtime and increases operational flexibility. |
| Challenge | Description |
|---|---|
| Cost Competitiveness | Higher initial capital cost compared to PWRs. |
| Fuel Fabrication Complexity | TRISO fuel manufacturing is complex and expensive. |
| Limited Operating Experience | Only one commercial-scale unit currently in operation. |
| Public Acceptance | Public concerns about new reactor technologies persist. |
| Regulatory Uncertainty | Licensing frameworks for HTGRs are still evolving globally. |
Domestic Deployment:
Export Market:
Technology Evolution:
[Graphite Sphere Fuel Pebble]
Diameter: ~6 cm
Contains ~9 g Uranium (enriched)
Coated TRISO particles (~9,000 per pebble)
[HTR-PM Reactor Module]
Power: 250 MWth / ~100 MWe
Temp: 750°C helium out
Fuel: ~420,000 pebbles in core/circulation
[Steam Turbine Hall]
Connected to two reactor modules
Net output: ~200 MWe
If you'd like a detailed technical drawing, PDF summary, or comparison with other SMRs like NuScale or ACP100, let me know!