We propose a DAO that requires an initial investment
to allow the entry of the renewable energy generator into
the platform, which creates new tokens and promotes quarterly sales auctions that will make available a number
of tokens to the market. We assume that the renewable energy generator
investment takes place at time 0 and that the supply of
RECs to the market (St) will occur for 8 quarters (or 2
years). Our model also assumes that the generator has
the flexibility to invest now or in one year to enter the
platform, considering the energy generated in one year
by a single typical 4MW wind turbine. This is equivalent
to the generator having a European option to defer their
investment for one year.
To understand the logic of a European call option,
which in this research is represented by the option to defer
the investment, we present in Figure 2 a simple example
of how such an option can be calculated with a binomial
tree. In this example, we assume that the investment
(US3,000)inaprojectcanbedeferred.Withthis,wecanwaitfortheuncertaintyaboutits 5,500 and low = US 226,900.25) using equation 4. Then,
in order to define the generator’s revenue, we model the
multiplicative demand shock (Ct). For this, we calculate by
numerical methods the risk premium value (ζC = 4.70% per
quarter or 20.68% per year) considering the mathematical
equivalence between the PVs shown in equation 8. We
then determine the upside and downside values of the
binomial tree (u = 1.35 and d = 0.74) and the risk-neutral
probabilities (p = 43.05% and 1 – p = 56.95%) using
equation 9.
Using the software DPL, we model the uncertainty
for the next eight quarters, incorporating the generator’s
revenue as the cash flow of the model, as shown in
Figure A.1 (Appendix). Through this binomial tree, we
find that the generator’s NPV is equal to US 239,011.22 (equation
10). Considering the option to postpone the investment
and equation 11, we find that the generator’s NPV is equal
to US$ 59,657.50. Note that the defer option is extremely
valuable, as it promoted a growth of approximately
169.40% in the generator’s NPV.