Are there explorations/deliberations on satellites designed solely to collect and transmit power from orbit? I’m asking because I want to estimate how much would it cost to launch per watt.
Assistant
Yes, Space-Based Solar Power (SBSP) is an active area of research and exploration, with several projects and studies focused on satellites designed to collect solar energy in orbit and transmit it wirelessly (e.g., via microwaves or lasers) to Earth. While no operational system exists yet, significant progress is being made:
Key Initiatives & Research:
- Caltech's Space Solar Power Project (SSPP)
- Launched a prototype in 2023 to test lightweight solar collectors and wireless power transfer.
- Targets ultra-light, deployable structures to reduce mass/cost.
- European Space Agency (ESA) - SOLARIS Initiative
- Assessing technical/economic feasibility for SBSP as a clean energy source.
- Focuses on high-efficiency photovoltaics, robotics for assembly, and microwave power beaming.
- Japan Aerospace Exploration Agency (JAXA)
- Decades of R&D; demonstrated 1.8 kW wireless power transmission over 50+ meters (ground test).
- Plans for orbital demonstrations by 2030.
- UK's Space Energy Initiative
- Aims to deploy a pilot SBSP plant by 2035, targeting £50/MWh costs eventually.
- NASA & U.S. DoE Studies
- Multiple architecture studies (e.g., SPS-ALPHA, Sun Tower concepts) analyzing scalability.
Estimating Launch Cost per Watt
Calculating launch cost per watt ($/W) is highly speculative due to technology immaturity, but we can outline the key variables:
1. System Mass per Watt (kg/W)
- Current space solar panels: ~100–300 W/kg (e.g., ISS panels).
- Target for SBSP: 1,000–2,000 W/kg (via thin-film PV, concentrated solar).
- Non-solar mass (structure, transmitters, cooling) could add 2–5× the panel mass.
2. Launch Cost per kg ($/kg)
- Current: 3,000/kg (Falcon 9 / Falcon Heavy).
- Future (Starship target): <$100/kg.
3. Simplified $/W Calculation
Assume a 1 GW (1,000 MW) SBSP station:
- Mass Estimate:
- Conservative: 5,000–10,000 tonnes (5–10 kg/W).
- Advanced: 500–1,000 tonnes (0.5–1 kg/W) with next-gen tech.
- Launch Cost:
- Today: 25,000/W** (economically impossible).
- *With Starship (100/kg × 1 kg/W = $100/W.
- Optimistic future: 6/W**.
4. Realistic Projections
Studies suggest SBSP could achieve 3/W total system cost (including construction, launch, and operations) by 2050, assuming:
- Reusable heavy-lift rockets (Starship success).
- In-orbit robotic assembly.
- Ultra-light materials (e.g., Caltech's <1 kg/m² designs).
- Mass production of components.
Launch-specific costs might then fall to 0.50/W.
Challenges & Why It's Not Yet Viable
- Mass-to-Power Ratio: Must improve 10–50× over current satellites.
- Wireless Transmission Efficiency: Needs >70% end-to-end (currently ~50% in tests).
- Orbital Assembly: Requires autonomous robotics.
- Economics: Terrestrial solar + storage is already <$1/W installed.
- Regulatory/Safety: Beam intensity, spectrum allocation, space debris.
Conclusion
Short-term (2030s):
- Pilot projects (e.g., 100 kW–1 MW demonstrators) at >$100/W launch costs.
Long-term (2040+): - 3/W total system cost if technology and launch costs evolve as projected.
- Launch contribution: <$0.50/W with Starship-class vehicles and mass-optimized designs.
For meaningful estimates, track:
- Caltech/JAXA/ESA demo results.
- Starship launch cost reductions.
- Advances in thin-film PV and wireless power transmission.
SBSP remains high-risk but could become viable for baseload power by mid-century, especially for remote/defense applications. Let me know if you'd like deeper technical details! 🛰️⚡
- Caltech's Space Solar Power Project (SSPP)
- User
With starship, can’t we work “slower”? Launch parts into orbit, assemble them there, use an orbital refuelable tug to move the structure to the desired orbit. This way we don’t have to haul starship or whatever back and forth. Does this make the cost equation more compelling?
Assistant
You've hit on a critical strategy that makes SBSP economically plausible: orbital assembly + reusable tugs + propellant depots. This approach fundamentally changes the cost equation, and SpaceX's Starship is the catalyst that could make it viable. Here's how it breaks down:
Key Advantages of Your Proposed Architecture
-
Avoids Starship's GEO Penalty
- Starship can deliver ~100-150t to LEO, but only ~5-20t to GEO directly (due to high fuel demands).
- Solution: Launch payloads to LEO, assemble there, then use a low-mass, reusable tug (refueled in LEO) to ferry modules to GEO.
- Result: 5–10× more payload delivered to GEO per Starship launch.
-
Orbital Assembly Unlocks Mass Production
- Factories on Earth can mass-produce standardized SBSP components (solar tiles, trusses, transmitters).
- Robots in LEO assemble them (e.g., ESA's PROBA-3/Japan's GOSAT programs are testing this).
- No need for heavy, single-launch monolithic structures.
-
Reusable Tugs Slash Transportation Costs
- A tug with high-specific-impulse engines (e.g., solar-electric propulsion) uses 10× less propellant than chemical rockets.
- Refuel it in LEO using depots supplied by Starship.
- Example: A single tug could deliver dozens of SBSP modules to GEO over its lifetime.
Revised Cost Estimates ($/W) with This Architecture
Cost Factor Conservative (2030) Optimistic (2040+) Launch to LEO (Starship) $100/kg $20/kg System Mass (SBSP) 3 kg/W 0.3 kg/W LEO→GEO Transport Cost $50/kg $10/kg Orbital Assembly Cost $200/kg $50/kg Total Launch & Assembly $350/W $24/W Other Costs (PV, transmitters, ops) +$50/W +$6/W Total System Cost $400/W $30/W Why This Improves Viability:
- Transport to GEO drops to ~0.30/W (vs. 20/W with direct launch).
- Assembly costs dominate early on but plummet with robotics (e.g., NASA's OSAM-1 mission).
- Terrestrial comparison: Ground solar + storage is ~2/W today. SBSP needs to hit <$3/W to compete for baseload power.
- This architecture makes <$30/W possible by 2040 – still high, but within reach for niche applications (e.g., military, islands).
Challenges to Solve
- Orbital Robotics:
- Autonomous assembly of fragile solar films/transmitters isn’t proven at scale.
- Progress: Northrop Grumman’s Mission Extension Vehicle (MEV), ESA’s EROSS program.
- Propellant Depots:
- Storing cryogenic propellant (methane/oxygen) in orbit requires breakthroughs.
- Progress: SpaceX’s Starship depot plans, ULA’s ACES concept.
- Radiation Hardening:
- GEO’s harsh environment degrades electronics faster than LEO.
- Space Traffic Management:
- 10,000+ SBSP modules in LEO could exacerbate debris risks.
Path to Affordability: The Role of Starship
- Starship enables everything: Low launch costs ($/kg) + high volume (150t payloads) + depot infrastructure.
- Without it, SBSP is economically impossible. With it, $30/W by 2040 is credible if:
- Robotics cut assembly costs 10× (via machines like "SpaceFactory").
- Tugs achieve 100+ reuses (similar to aircraft).
- Solar cell efficiency exceeds 35% (e.g., multi-junction cells).
Bottom Line
Your proposed architecture absolutely makes SBSP more compelling – it’s the only way to reach sub-$50/W costs. Early pilot plants (e.g., 100 kW by 2035) will test these concepts:
- Step 1: Launch 500t of SBSP parts to LEO (4 Starship flights, ~$200M).
- Step 2: Assemble using semi-autonomous robots ($100M).
- Step 3: Tug modules to GEO with a solar-electric vehicle ($50M).
- Total for 100 kW demo: ~3,500/W). Brutal today, but costs fall 100× with scale and reuse.
By 2050, if Starship delivers 1–$3/W total system costs** become feasible. SBSP won’t replace ground solar, but could fill critical gaps (e.g., 24/7 clean power for datacenters, disaster zones, or lunar bases).
Let me know if you want to dive into tug propulsion tradeoffs (nuclear vs. solar-electric) or assembly robotics! 🚀
-