How to use kanban to visualize bottlenecks
- User
How to use kanban to visualize bottlenecks
Assistant
Okay, for an SDM, using Kanban to visualize bottlenecks is a powerful way to improve team flow and productivity, especially with multiple projects. Here's how:
1. Set Up Your Kanban Board Correctly:
- Define Workflow Stages (Columns):
- Map out the actual steps your team takes to complete work items (e.g.,
Backlog,To Do (Prioritized),In Dev,Code Review,Testing,Ready for Deploy,Deployed/Done). - Be granular enough to see where work might get stuck, but not so granular it's unmanageable.
- Map out the actual steps your team takes to complete work items (e.g.,
- Visualize All Work: Ensure all significant tasks, features, and bugs for all active projects are represented as cards on the board. Use color-coding, labels, or swimlanes (horizontal rows) to differentiate projects if needed, but be cautious not to overcomplicate the visual.
- Implement WIP (Work In Progress) Limits: This is CRITICAL for spotting bottlenecks.
- For each "active" column (e.g.,
In Dev,Code Review,Testing), set a maximum number of cards allowed in that column at any one time. - Start with a reasonable guess (e.g., 1-1.5x the number of people working in that stage). Adjust based on observation.
- WIP limits force bottlenecks to become visible.
- For each "active" column (e.g.,
2. How to Spot Bottlenecks Visually on the Board:
-
Column Consistently Hitting WIP Limit:
- What you see: A column is always full or at its WIP limit. New work cannot enter this column until something leaves it.
- Indication: This stage is struggling to process work as fast as it's receiving it. This is a classic bottleneck.
- Example:
Code Reviewcolumn has a WIP limit of 3, and it's always full. Developers finish coding but have to wait to get their PRs reviewed.
-
Piling Up of Cards Before a Stage:
- What you see: The column before a suspected bottleneck stage has many cards waiting.
- Indication: The upstream stage is producing work faster than the downstream (bottleneck) stage can consume it.
- Example:
Ready for Testingcolumn is filling up because theTestingcolumn (the bottleneck) can't pull work fast enough.
-
Starvation in Downstream Columns:
- What you see: Columns after a suspected bottleneck are frequently empty or have very few cards.
- Indication: The bottleneck is restricting the flow of work to subsequent stages.
- Example:
Ready for Deployis often empty becauseTestingis slow, holding everything up.
-
Long Wait Times / Aging Cards:
- What you see: Cards sit in a particular column for an unusually long time. Many Kanban tools can highlight "aging" cards (e.g., by changing color or showing "days in column").
- Indication: Work in this stage is taking too long, indicating a process inefficiency or resource constraint.
- Example: Cards in
In Devtake weeks, while other stages are faster. This could mean complex tasks, lack of clarity, or skill gaps.
-
Blocked Items Clustering:
- What you see: Multiple cards are marked as "Blocked" and they tend to cluster in or before a specific column.
- Indication: This stage frequently encounters external dependencies or issues that halt progress.
- Example: Many items in
In Devare blocked waiting for API access from another team.
3. Using a Cumulative Flow Diagram (CFD):
Most digital Kanban tools offer CFDs. This is the most powerful visual for identifying bottlenecks over time:
- What it is: A stacked area chart showing the quantity of work in each stage of your workflow over time. Each colored band represents a column on your Kanban board.
- How to Spot Bottlenecks on a CFD:
- Widening Band: If a particular band (e.g.,
Code Review) is consistently getting thicker over time, it means more work is entering that stage than leaving it. This is a bottleneck. The input rate is higher than the output rate for that stage. - Flattening Top Line of a Band: If the top line of a band (its output) flattens out while the top line of the band below it (its input) continues to rise, this also signals a bottleneck in that stage.
- Growing Gap: If the gap between the top of one band (e.g.,
In Dev) and the top of the next band (e.g.,Code Review) is widening, it means work is piling up in the earlier stage, waiting for the later stage. - Steep vs. Shallow Slopes: The average slope of a band indicates the throughput of that stage. A stage with a consistently shallower slope than the one before it is likely a bottleneck.
- Widening Band: If a particular band (e.g.,
4. What to Do When You Spot a Bottleneck:
- Validate: Talk to the team. Is the visual observation matching their experience?
- Investigate the Cause (The "Five Whys"):
- Is it a lack of skills/people in that stage?
- Is the process for that stage inefficient?
- Are there external dependencies?
- Is the work arriving poorly prepared?
- Are there tooling issues?
- Swarm (Temporary Fix): Can other team members temporarily help clear the bottlenecked stage? (e.g., all developers help with code reviews or testing).
- Improve the Bottleneck Stage: Address the root cause (e.g., training, process improvement, better tools, pair programming in that stage).
- Protect the Bottleneck: Ensure the bottleneck stage always has high-quality work ready for it and isn't starved.
- Adjust WIP Limits:
- Consider reducing WIP limits in columns before the bottleneck to prevent overwhelming it.
- Be cautious about increasing the WIP limit at the bottleneck unless you've increased its capacity.
- Elevate the Constraint: If it's a persistent system constraint, dedicate resources to improving its capacity (as per Theory of Constraints).
- Monitor: Bottlenecks can shift! As you improve one, another part of the system might become the new constraint. Continuous observation is key.
By making work and its flow (or lack thereof) visible, Kanban empowers you and your team to identify and address these productivity killers proactively.