im trying to think of.. a way to order my project in ADO i had an epic for the entire…
- User
im trying to think of.. a way to order my project in ADO i had an epic for the entire project and scenarios below it for each part of the project, then i had deliverables inside there, each delivarable was sometimes just "Milestone 1" of the scenario
is this really the best way?
Assistant
Other models, same or similar prompt
Responses were produced in different, uncontrolled contexts (system prompts, settings, prior turns). This is not a benchmark.