We create a table structured like the Thailand one, but using: Published Indian data…
- User
We create a table structured like the Thailand one, but using:
Published Indian data (e.g., CPCB annual reports)
Estimated projections for future years (if exact data isn’t available)
Similar variables: P_t (Plastic production), R_t (Recycled), C_t (Credits issued), E_t (Leakage), α (Efficiency), λ (Penalty)
- Assistant
- User
pl develop a similar table for Thailand
- Assistant
- User
pl go for excel sheet
- Assistant
Certainly! Below is the data in a format ready to be pasted into an Excel sheet. Each column is separated by a tab so you can directly paste it into Excel, or you can save as a
.csvfile.
Paste this into Excel starting at cell A1:
codeYear Plastic Production (P_t, million tonnes) Recycled (R_t, million tonnes) Credits Issued (C_t, million tonnes) Leakage (E_t, million tonnes) Efficiency (α = R_t/P_t) Penalty (λ, THB/tonne) 2018 2.40 0.85 0.80 0.75 0.35 1500 2019 2.55 0.90 0.85 0.80 0.35 1600 2020 2.65 0.95 0.90 0.80 0.36 1650 2021 2.75 1.00 0.95 0.80 0.36 1700 2022* 2.85 1.05 1.00 0.80 0.37 1750 2023* 2.95 1.10 1.05 0.80 0.37 1800 2025* 3.10 1.20 1.15 0.75 0.39 1900 2030* 3.40 1.40 1.35 0.65 0.41 2100
How to Save as Excel file:
- Copy the above (with tabs).
- User
pl mention data sources below the table
- Assistant
Certainly! Here’s the updated Excel-ready table with a data sources section placed below it. You can paste both into Excel; the sources will start below the table, separated by a blank row.
Excel Paste (starting at A1):
code