please correct: Hello Sir Philibert A total of 26 scupper and overboard valves were…
- User
please correct: Hello Sir Philibert A total of 26 scupper and overboard valves were inspected and accepted by class during the partial inspection last friday, with the breakdown listed below. However, there are few scupper valves not listed on our general scope that still require reconditioning. I have informed Ronald about the additional valves, but we haven’t inspected on site as I had the survey inspection with class same day. The class was already informed for the valves that haven’t yet reconditioned. I suggest having a walkthrough tomorrow morning to identify the valves at 7:30am on board, partial list is provided below for reference.
- Assistant
Certainly! Here's a corrected and polished version of your message:
Hello Sir Philibert,
A total of 26 scupper and overboard valves were inspected and accepted by Class during the partial inspection last Friday, with the breakdown listed below. However, there are a few scupper valves not included in our general scope that still require reconditioning. I have informed Ronald about these additional valves, but we have not inspected them on site yet, as I had the survey inspection with Class on the same day. Class has already been informed about the valves that have not yet been reconditioned.
I suggest conducting a walkthrough tomorrow morning at 7:30 AM on board to identify these valves. A partial list is provided below for your reference.
Let me know if you want it more formal or casual!