Please correct: Hello Team, In observance of long weekend, we expect each team commitment to their prioritization of works align with their respective drydocking scope. This is to reiterate that work will continue even during holiday. The following activities are expected to be prioritized:
Scaffolding works
- Modification of scaffold in way of shaft and propeller removal (port & stbd)
- Erection of scaffolds for side shell replating (port & stbd)
- Erection of scaffolds at chain locker (port & stbd)
Tank Cleaning:
- Oily sludge pumping out from shaft tunnel (port & stbd)
- Oily sludge pumping out and wipe down the engine bed (stbd)
Hull Preservation:
- Power tooling of hull vertical and flat bottom (port & stbd)
Propulsion Works:
- Propeller and shaft removal
- Assistant
Certainly! Here's a corrected and refined version of your message:
Hello Team,
In observance of the long weekend, we expect each team's commitment to prioritizing their work in alignment with their respective drydocking scope. Please note that work will continue even during the holiday.
The following activities should be prioritized:
Scaffolding Works:
- Modification of scaffolding in the area of shaft and propeller removal (port & starboard)
- Erection of scaffolding for side shell replating (port & starboard)
- Erection of scaffolding at the chain locker (port & starboard)
Tank Cleaning:
- Pumping out oily sludge from the shaft tunnel (port & starboard)
- Pumping out oily sludge and wiping down the engine bed (starboard)
Hull Preservation:
- Power tooling of the hull's vertical and flat bottom surfaces (port & starboard)
Propulsion Works:
- Removal of the propeller and shaft
Thank you for your attention to these priorities.
- User
please correct: Hull Preservation:
- Power tooling of hull vertical and flat bottom (port & stbd) – Aft portion will be put onhold to give way to the mechanical team working on shaft/propeller removal.
- Assistant
Sure! Here's a corrected and refined version of your statement:
Hull Preservation:
- Power tooling of the hull's vertical and flat bottom surfaces (port & starboard) – The aft portion will be put on hold to accommodate the mechanical team working on the shaft and propeller removal.