please correct: Hello Sir Alvin, We received another request from VS grand ferries for…
- User
please correct: Hello Sir Alvin, We received another request from VS grand ferries for the replacement of16 units of injectors and gasket for Seacat oasis. Please facilitate the ordering and provide us the ETA.
@Neil Patrick, please raise a PR for the 16 units injector (Product type: 16V200M72; Serial No: 536113695) and gaskets.
- Assistant
Sure! Here's a corrected version of your message:
Subject: Request for Injector and Gasket Replacement
Hello Sir Alvin,
We have received another request from VS Grand Ferries for the replacement of 16 units of injectors and gaskets for the Seacat Oasis. Please facilitate the ordering process and provide us with the estimated time of arrival (ETA).
@Neil Patrick, please raise a purchase request (PR) for the 16 injector units (Product Type: 16V200M72; Serial No: 536113695) and the gaskets.
Thank you.
Feel free to adjust any specific terms or details as needed!
- User
please correct: Hello Ms. Ivy, Please confirm to tetra fire whether the configuration for the 6 returned smoke detectors units has been completed and provide us their report. It appears only unit with A106 address has been configured, the rest are unconfigured.
Could you also set a meeting for them tomorrow?
- Assistant
Here's a corrected version of your message:
Subject: Confirmation and Meeting Request
Hello Ms. Ivy,
Could you please confirm with Tetra Fire whether the configuration for the 6 returned smoke detector units has been completed and provide us with their report? It appears that only the unit with the A106 address has been configured; the rest remain unconfigured.
Additionally, could you arrange a meeting with them for tomorrow?
Thank you!
Feel free to make any further adjustments if necessary!
- User
please correct: • Docking blocks preparation was completed on Thursday, with the engagement of subcon, PVV, and reinforced by piping team. • Docking operation was completed in 2 days, on the first day March 14th the operation was halted due to high swell and resumed the next day. • Subcontractors for Hull preservation started on Sunday.
• Piping and mechanical team will proceed to survey today for their scope of works, March 17th. - Assistant
Here’s a corrected version of your points:
- The preparation of docking blocks was completed on Thursday, with the engagement of subcontractors, PVV, and support from the piping team.
- The docking operation was completed in 2 days. On the first day, March 14th, the operation was halted due to high swell and resumed the following day.
- Subcontractors for hull preservation started work on Sunday.
- The piping and mechanical teams will proceed with their scope of work survey today, March 17th.
Feel free to let me know if you need further adjustments!
- User
Please correct: 4. SEACAT ONE Pending Items: • FDAS – the returned 6 Units Smoke detectors that were sent to the supplier for programming had arrived March 12th. Installation proceeded on March 14. However, after installation the unconfigure error. SCM to confirm from tetra fire the program they completed.
- Assistant
Here’s a corrected version of your text:
SEACAT ONE
Pending Items:
- FDAS: The 6 returned smoke detectors that were sent to the supplier for programming arrived on March 12. Installation proceeded on March 14. However, after installation, an unconfigured error occurred. SCM needs to confirm with Tetra Fire regarding the programming they completed.
Feel free to ask for additional edits or adjustments!
- User
please correct: Hello Jill, Confirmed today from the owner’s representative the scope for fabrication which to be engaged by PVV. Please refer to the attached endorsement for the extension, I have specified March 11-April 11, 2025 for the duration.
- Assistant
Here's a corrected version of your message:
Subject: Confirmation of Fabrication Scope
Hello Jill,
I received confirmation today from the owner’s representative regarding the scope for fabrication that will be handled by PVV. Please refer to the attached endorsement for the extension; I have specified the duration as March 11 to April 11, 2025.
Thank you!
Let me know if you need any further adjustments!