please improve: Ship Repair Update: Seact one that was drydocked on February 10, 2025 at…
- User
please improve: Ship Repair Update: Seact one that was drydocked on February 10, 2025 at slipway for its intermediate drydocking was completed advance in schedule for only 9days. The original scope includes replating of bottom shell and replacing the propellers, but upon further inspections there are works added such as repair on transom ladder and bulwark gate, reconditioning and renewal of seachest valves, replacing worn out rubber seal of wheelhouse sliding window, replacing push botton swirthc, voltmenter, and terminal block of main switch board, and replacing cabling of smoke detectors. The vessel was not conducted for seatrial but issue on steering and rudder synchronization arises during sailout. Our commissioning team and hydraulic team gone on board inspection during the vessel is in transit for its trip to Naval, Letye to conduct diagnosis with the rudder synchronization.
- Assistant
Ship Repair Update:
The Seact, which was drydocked on February 10, 2025, at the slipway for its intermediate drydocking, has successfully completed its maintenance ahead of schedule, finishing nine days early. The original scope of work included replating the bottom shell and replacing the propellers. However, during further inspection, additional repairs were identified, including:
- Repairing the transom ladder and bulwark gate
- Reconditioning and renewing the seachest valves
- Replacing the worn rubber seals of the wheelhouse sliding windows
- Installing a new push-button switch, voltmeter, and terminal block for the main switchboard
- Upgrading the cabling for the smoke detectors
Although the vessel did not undergo a sea trial, issues related to steering and rudder synchronization arose during the sail out. Our commissioning and hydraulic teams conducted an on-board inspection while the vessel was in transit to Naval, Leyte, to diagnose the rudder synchronization issues.
- User
please improve: Ship Repair Update: MV Seacat one, which was drydocked on February 10, 2025 at slipway for its intermediate drydocking, has successfully its maintenance ahead of schedule, finished within 9days.
- Assistant
Ship Repair Update:
The MV Seacat One, which was drydocked on February 10, 2025, at the slipway for its intermediate drydocking, has successfully completed its maintenance ahead of schedule, finishing in just 9 days.
- User
please correct: Hello Paul, Please prioritize the preparation of docking and ballasting plans for MV Filipinas Nasipit as it will be drydocked first. The vessel will be arriving Tuesday next week and scheduled for drydocking on March 14, 2025. Our SCM will issue the PO within today.
As for the MV Filipinas Mindanao you can keep that work and submit the plans after completing the MV Filipinas docking and ballasting plans. We will provide the actual draft on MV Filipinas Mindanao once we confirm from Cokaliong. Do you also required actual draft for MV Filipinas Nasipit?
- Assistant
Subject: Docking and Ballasting Plans for MV Filipinas Nasipit
Hello Paul,
Please prioritize the preparation of the docking and ballasting plans for MV Filipinas Nasipit, as it will be drydocked first. The vessel is expected to arrive on Tuesday next week and is scheduled for drydocking on March 14, 2025. Our SCM will issue the Purchase Order by the end of the day.
As for MV Filipinas Mindanao, you can continue with that work and submit the plans after completing the docking and ballasting plans for MV Filipinas Nasipit. We will provide the actual draft for MV Filipinas Mindanao once we receive confirmation from Cokaliong.
Do you also require the actual draft for MV Filipinas Nasipit?
Thank you!
Best regards,
[Your Name]
[Your Position] - User
please correct: Hello Che, Apologies, I made the receipt this just now.
- Assistant
Hello Che,
I apologize for the delay; I just prepared the receipt now.
Thank you!
- User
please correct: Hello Gel, We still have variation No. 02 for final sign, and collectible for the smoke detector repairs amounting to 949,152.97 which originally part of the emergency drydocking 37S014 and we continued the work during the recent docking. However, there are 6 more smoke detectors returned to the supplier for programming and is scheduled to arrive on March 11, 2025. Installation will proceed once we receive the detectors.
- Assistant
Hello Gel,
We still have Variation No. 02 pending final signature, as well as a collectible for the smoke detector repairs amounting to 949,152.97, which was originally part of the emergency drydocking (37S014). We continued this work during the recent docking.
Additionally, six more smoke detectors have been returned to the supplier for programming and are scheduled to arrive on March 11, 2025. Installation will proceed once we receive the detectors.
Thank you!
- User
please improve: Hello Team, Following the drydocking success and main engine alignment completion of MV Filipinas Agusan del Norte, Cokaliong management have offered to us their next vessel MV Filipinas Nasipit to be docked prior to MV Filipinas Mindanao. Initial information provided, the vessel is set for intermediate drydocking and is scheduled to arrive next week, Tuesday. They have decided to send Filipinas Nasipit early as they have already 2 vessel berthed at Pier 1, Cebu Port.
We still haven’t received the scope of work and currently reaching out to their office and to their superintendent to send it through within today.
In this regards, we request for each team’s usual support for this coming drydocking project. Drydocking is set on March 14, 2025 which is one week from this day. Work prioritization expected for each team are the following:
- Docking and ballasting plan creation – PO has been issued this morning, @Alan please chase Sarangani to produce the docking and ballasting plan possible on Tuesday. @Henry, your assistance for the review and checkplot of the said plans are needed.
- Docking blocks preparation – @Franny please arrange PR for the PVV to commence the docking block preparation soon as the docking plan will be available.
- Ballast Operator and Tug Master - @Oliver Ablao please arrange advance booking with Caspi and Capt. Sepe to confirm their availability and set a meeting on Tuesday. @Ria Ann, please raise a PR for them.
- Quotation - @Gil, as discussed please finalize the quotation soon as the scope of works is confirmed.
- PEZA processing - @Shadail, letter of entry to PEZA you can proceed with the processing next week soon as the quotation and contract are signed. We will ask for the SPN from the owner as your supporting document.
- Anchorage and Mooring - @Eurel, as the vessel arrange early next week we need you to coordinate with the vessel for the anchorage location.
- Hull preservation - @Ed please arrange the PR for MAP for the surface preparation thru powertooling.
- Cost code - @Angelica, we have raise the PR for the docking & ballasting plan but charge to the contractor 70003 cost code as we still haven’t secure the cost code. For the succeeding PR for PVV, MAP, CASPI, and Capt Sepe will need cost code for this as need to secure PO, can we still use the 70003 cost code and reclass after we secure the contract and project cost code?
- Assistant
Subject: Preparation for MV Filipinas Nasipit Drydocking
Hello Team,
Following the successful drydocking and main engine alignment of the MV Filipinas Agusan del Norte, Cokaliong management has offered us their next vessel, MV Filipinas Nasipit, to be docked prior to the MV Filipinas Mindanao. The initial information indicates that the vessel is scheduled for intermediate drydocking and will arrive next Tuesday. They decided to send the Filipinas Nasipit early as they currently have two vessels berthed at Pier 1, Cebu Port.
We have yet to receive the scope of work but are actively reaching out to their office and superintendent to obtain it by the end of today.
In light of this, we request each team’s usual support for this upcoming drydocking project. The drydocking is set for March 14, 2025, which is one week from today. To facilitate preparations, we expect the following work priorities from each team:
-
Docking and Ballasting Plan Creation: A purchase order has been issued this morning. @Alan, please follow up with Sarangani to ensure the docking and ballasting plan is produced by Tuesday. @Henry, we will need your assistance with the review and check plot of these plans.
-
Docking Blocks Preparation: @Franny, please arrange a purchase request (PR) for the PVV to commence the docking block preparation as soon as the docking plan is available.
-
Ballast Operator and Tug Master: @Oliver Ablao, please make advance bookings with Caspi and Capt. Sepe to confirm their availability and set a meeting for Tuesday. @Ria Ann, please raise a PR for their services.
-
Quotation: @Gil, as discussed, please finalize the quotation as soon as the scope of work is confirmed.
-
PEZA Processing: @Shadail, you can proceed with processing the letter of entry to PEZA next week once the quotation and contract are signed. We will request the SPN from the owner to serve as supporting documentation.
-
Anchorage and Mooring: @Eurel, as the vessel arrives early next week, please coordinate with the vessel for the anchorage location.
-
Hull Preservation: @Ed, please arrange for the PR for MAP to handle surface preparation through power tooling.
-
Cost Code: @Angelica, we have raised the PR for the docking and ballasting plan, but it will be charged to contractor cost code 70003, as we have not yet secured the official cost code. For the subsequent PRs for PVV, MAP, CASPI, and Capt. Sepe, we will need a proper cost code to secure the POs. Can we continue to use the 70003 cost code and reclassify once we obtain the contract and project cost code?
Thank you for your cooperation and support. Let’s ensure we are well-prepared for this upcoming project.
Best regards,
[Your Name]
[Your Position] -
- User
please correct: 8) Cost code - @Angelica, as you have known we raised the PR for the docking & ballasting plan and charge to the contractor 70003 cost code
- Assistant
- Cost Code: @Angelica, as you know, we have raised the PR for the docking and ballasting plan, which will be charged to contractor cost code 70003.