please correct: Hello Che, Attached is the scope of works discussed on the kickoff…
- User
please correct: Hello Che, Attached is the scope of works discussed on the kickoff meeting. Please oblige the contractors (ENN & MAP) with their manpower endorsement, equipment and tool list, and quotation to be submitted tomorrow. As agreed, they should deploy at the least same manpower they assigned before with minimum 15 men for easement on safety orientation, and they must include pressure washer and grinder to their quote, as well as safety officer and supervision. Accomplishment report and daily timesheet will be required documents for their billing. They also required to render regular overtime or weekend overtime if project advise them to do so.
Below are their scope of works. @Jetricia, please raise PR with the charging 37S018.3.2.399.
- Assistant
Hello Che,
Attached is the scope of work discussed in the kickoff meeting. Please ensure that the contractors (ENN & MAP) provide their manpower endorsement, equipment and tool list, and quotation by tomorrow. As agreed, they should deploy at least the same manpower as before, with a minimum of 15 workers for safety orientation. Additionally, they must include a pressure washer and grinder in their quote, as well as a safety officer and supervision. An accomplishment report and daily timesheet will be required documents for their billing.
They are also required to render regular overtime or weekend overtime if the project advises them to do so.
Below are the details of their scope of work. @Jetricia, please raise a PR with the charge code 37S018.3.2.399.
Thank you.