Business Requirement Document (BRD)
Project Title: Update Due Date for Reassigned VIT/AVIT/CVIT Based on Risk Rating and Internet Facing Status
Version: 1.0
Date: [Insert Date]
Prepared By: [Your Name]
Approval: [Approver's Name]
1. Purpose
The purpose of this Business Requirement Document is to outline the requirements for updating the Due Date field when a Vulnerability Information Technology (VIT), Application Vulnerability and IT (AVIT), or Configuration Vulnerability and IT (CVIT) gets reassigned from one group to another. The Due Date will depend on the risk rating and whether the configuration item is internet-facing.
2. Background
Currently, there is no automated process for updating the Due Date for VIT/AVIT/CVIT when they are reassigned to a different group. This can lead to inconsistencies in tracking and managing vulnerabilities, particularly when considering the varying degrees of urgency based on risk ratings and exposure.
3. Scope
This document outlines the functional and non-functional requirements for the implementation of the Due Date update functionality upon reassignment of VIT/AVIT/CVIT.
4. Requirements
4.1 Functional Requirements
-
Reassignment Trigger:
- The system shall automatically trigger the Due Date update process upon reassignment of a VIT/AVIT/CVIT.
-
Risk Rating and Internet Facing Evaluation:
- The system shall evaluate the following for the VIT/AVIT/CVIT being reassigned:
- Risk Rating (Critical, High, Medium)
- Internet Facing status (Yes or No)
-
Due Date Calculation:
- Based on the evaluated criteria, the system shall apply the following rules to calculate the Due Date:
| Risk Rating | Internet Facing | Due Date (Days Added) |
|---|
| Critical | Yes | 30 |
| High | Yes | 30 |
| Medium | Yes | 60 |
| Critical | No | 60 |
| High | No | 60 |
| Medium | No | 90 |
-
Due Date Update:
- The system shall add the relevant number of days to the date of reassignment to determine the new Due Date.
- The updated Due Date shall be saved in the system and reflected in the VIT/AVIT/CVIT records.
-
Notification:
- The system shall send a notification to responsible personnel upon Due Date update, indicating the new Due Date and the reason for the change.
4.2 Non-Functional Requirements
-
Performance:
- The Due Date update process should complete within 5 seconds of the reassignment trigger.
-
Usability:
- The system shall provide a clear and understandable interface for viewing Due Dates and reassignment history.
-
Security:
- The process must adhere to organizational security protocols to ensure that only authorized personnel can perform reassignment and view Due Dates.
5. Assumptions
- It is assumed that the underlying system and database can support the additional logic required for this Due Date update functionality.
- It is assumed that the current user roles and permissions are in place to manage compliance with the notification and security requirements.
6. Dependencies
- The implementation may depend on existing systems for monitoring and logging VIT/AVIT/CVIT reassignments.
- Coordination with the IT security team will be required to validate risk rating assessments.
7. Acceptance Criteria
- The system correctly calculates and updates the Due Date based on the rules specified.
- Notifications are sent accurately following a reassignment.
- There are no significant performance lags during the Due Date update process.
8. Conclusion
This document serves as a comprehensive guide for the requirements needed to enhance the VIT/AVIT/CVIT reassignment process by implementing automatic Due Date updates based on risk ratings and internet-facing status. Compliance with the outlined requirements will help streamline vulnerability management within the organization.
End of Document
[Optional: Attach appendices or additional detailed specifications as needed.]