No.: To, PMCS/EDFC2/L TT /2022/07756 GIL-SIL (JV) 2/2B, Bhagwan Ram Mandir Marg (First…
- User
No.: To, PMCS/EDFC2/L TT /2022/07756 GIL-SIL (JV) 2/2B, Bhagwan Ram Mandir Marg (First Floor) Civil Lines, Prayagraj - 211001, Utter Pradesh. Kind Attention: Mr. Raj Singh Tak ( Project Director) Date: 12.09.2022 Subject: Design and Construction of Civil, Structures and track works for Double line Railway involving formation in Embankments/ Cuttings, ballast on formation, track works, Bridges, Structures, Buildings, Yards, Integration with IR existing Railway System and Testing & Commissioning on Design -Build Lump Sum basis for New Karchana Station ( excluding) - New Bhaupur Station ( excluding) of Eastern Dedicated Freight Corridor. (Contract Package-202).):Reg. Issuing ofTaking Over Certificate for Rooma-Sujatpur section. Ref: CC Dear Sir,
- Contract No. HQ/EN/EC/D-B/Mughalsarai-New Bhaupur/CP-202 dated 27.05.2015.
- DFCCIL letter No. ALO (W)/EN/PMC/Pro-2/281/2852 dated 08.09.2022
- PMC letter No. PMCS/EDFG/LTT/2022/06636 dated 28.07.2022.
- GIL-SILJV letter No. GIL-SIL JV/DFCC/202/TW/2021-22/PD-10895 dated 15.03.2022.
- PMC letter No. PMCS/EDFC2/LTT/2022/01971 dated 05.03.2022.
- GIL-SIL JV letter No. GIL-SILJV/DFCC/202/TW/2021-22/PD-10829 dated 03.03.2022.
- PMC letter No. PMCS/EDFC2/LTT/2022/02656 dated 27.03.2022.
- PMC letter No. PMCS/EDFC2/LTT/2022/00765 dated 27.01.2022.
- PMC letter No. PMCS/EDFC2/LTT/2021/02076 dated 19.03.2021.
- DFCCIL letter No. ALO (W)/EN/PMC/Pro-2/281/968 dated 12.03.2021 this is the text form a scanned pdf ..their are serval pdf of this foramt...take a single pdf as path and write pytho script for string in csv ....No. , To, FRom , Sub, Ref, from is like in ths No. PMCS/EDFC2/L TT /2022/07756 from is PMCS ...means eevrtging before firts slash
- Assistant
- User
use ocr ..they are blur and not prperly texted ..high level ocr
- Assistant