IT Project Quality Management Plan
Project Title: InHaus Project Number: F
Project Leader/Manager: Maiol Sabater Anticipated Project Start Date:
Sponsor: Business collaborators Date Prepared:
Quality Management Strategy
The goals for quality management of information technology projects at Virginia Tech are to assure:
• Project deliverables meet their stated requirements.
• Project management processes are appropriately followed.
Quality management is performed throughout the project lifecycle with special attention to:
- Quality Planning – primarily during the project planning process.
- Quality Assurance (QA) – primarily during the project execution process.
- Quality Control (QC) – primarily during the project monitoring and controlling process.
- Independent Verification and Validation (IV&V) – ideally performed in all project processes except initiation. (Note: IV&V is required for very high risk, complex projects.)
1 Quality Planning
Quality is the degree to which the project fulfills requirements. Quality management planning determines quality policies and procedures relevant to the project for both project deliverables and project processes, defines who is responsible for what, and documents compliance.
The quality management plan identifies these key components:
Objects of quality review Quality Measure Quality Evaluation Methods
Project Deliverables Deliverable Quality Standards
Customer Satisfaction Quality Control Activities
Project Processes Process Quality Standards
Stakeholder Expectations Quality Assurance Activities
The following is a brief explanation of each of the components of the quality management plan.
Project Deliverables and Project Processes The key project deliverables and processes subject to quality review.
Deliverable
Quality Standards
and
Customer Satisfaction The quality standards that are the “measures” used to determine a successful outcome for a deliverable. These standards may vary dependent on the type of information technology project.
The customer satisfaction criteria describe when each deliverable is complete and acceptable as defined by the customer. Deliverables are evaluated against these criteria.
Process
Quality Standards
and
Stakeholder Expectations The quality standards that are the “measures” used to determine if project work processes are being followed. The “Process Guidelines Checklist” on www.it.pm.vt.edu can be used as an aide.
Stakeholder expectations describe when a project process is effective as defined by the project stakeholders. An example is the review and approval of all high impact changes to the project.
Quality Control Activities The quality control activities that monitor and verify that the project deliverables meet defined quality standards.
Quality Assurance Activities The quality assurance activities that monitor and verify that the processes used to manage and create the deliverables are followed and are effective.
2 Quality Assurance
The focus of quality assurance is on the processes used in the project. Quality assurance ensures that project processes are used effectively to produce quality project deliverables. It involves following and meeting standards, continuously improving project work, and correcting project defects.
The following table identifies:
• The project processes subject to quality assurance.
• The quality standards and stakeholder expectations for that process.
• The quality assurance activity – e.g., quality audit or reviews, code review - that will be executed to monitor that project processes are properly followed.
• How often or when the quality assurance activity will be performed.
• The name of the person responsible for carrying out and reporting on the quality assurance activity.
Project Process Process Quality Standards/
Stakeholder Expectations Quality Assurance Activity Frequency/Interval
Who is Responsible
Example:
Review software development practices of software application X. Software requirements specification.
Developers have completely and accurately captured application requirements. Peer review of software requirements specification. At regular intervals during the collection of requirements and a final review at the conclusion of requirements collection. Lead developer in conjunction with other knowledgeable developers.
Furniture recommendation system Recommendations should be fit to the each user depending on the tastes
All stakeholders should have a representation in the set of the recommender system Beta trial where the user gives a rating of the recommendations
Analysis of the result to see if it’s equally representative among all businesses. An initial trial and one after the modifications if needed. Developers of the recommender system.
Space arrangement recommender system Recommendations should be fit to the each user depending on the optimal distribution given the restraints. Beta trial where the interior designers give a rating. An initial trial and one after the modifications if needed. Developers of the recommender system.
3D models of furniture The 3D models should be accurate to the object/piece in terms of size, color, texture, and general appearance overall. Test comparison of a set of furniture objects and their 3D models evaluated by the interior designers. An initial trial and one after the modifications if needed for each type of material, color, furniture objective... 3D CV engineers
3D of space The 3D models should be accurate, with good light, the corresponding materials. Test comparison of a set of rooms (all types of rooms), and their 3D model An initial trial and one after the modifications if needed. 3D CV engineers
AR features The AR features should allow the user to interact with the 3D models of the furniture and the rooms. Resize, move, rotate… Testing the functionalities of the AR features. An initial trial and one after the modifications if needed. AR engineers
3 Quality Control
The focus of quality control is on the deliverables of the project. Quality control monitors project deliverables to verify that the deliverables are of acceptable quality and the customer is satisfied.
The following table identifies:
• The major deliverables of the project that will be tested for acceptable quality level.
• The quality standards and customer satisfaction criteria established for the project deliverable. Included are any organizational standards that need to be followed.
• The quality control activities that will be executed to monitor the quality of the deliverables.
• How often or when the quality control activity will be performed.
• The name of the person responsible for carrying out and reporting on the quality control activity.
Project Deliverable Deliverable Quality Standards/
Customer Satisfaction
Quality Control Activity
Frequency/Interval
Who is Responsible
Example:
Software application X that performs some desirable function Y. X must be free from defects.
End user does not experience errors or crashes and is happy with Y. Non-developer (independent) testing of X. As released for testing by developer and before X moves between alpha, beta, and production releases. John Smith, functional office representative.
Furniture recommendation system User feels like the recommendation fits their tastes. User rating. Every 15 recommendations Developers of the recommender system.
Space arrangement recommender system Users consider the space arrangement is efficient and aligns with their needs User rating and modifications form One for every room Developers of the recommender system
3D models of furniture Real products must resemble the 3D models Business ratings One time for each business on each type of furniture CV engineers
3D of space Spaces must resemble what users have at home Users ratings One time for each house project CV engineers
AR features Users can adequately modify the furniture and there is no lag/glitches or any mistake in general User rating One time for each house project AR engineers
4 Independent Verification & Validation (IV&V)
(Required For Very High Risk, Complex Projects)
• Independent Verification & Validation (IV&V) is the evaluation of project deliverables by an independent third party outside the development organization, to confirm they meet specified requirements (verification), and meet the needs of the intended target audience (validation).
• IV&V services are required for all very high risk, complex, information technology projects.
• IV&V services should be considered for medium risk information technology projects.
• The development organization is responsible for all costs associated with IV&V service and should be included in the project budget.
5 Quality Tools
The following are examples of tools that can be used to support quality management implementation. Click a tool name for explanations and examples.
Tool Name Tool Purpose/Use
Cost-Benefit Analysis
For Quality Control. Compares the cost of the quality process to the expected benefit
Control Charts
For Quality Control. Used to determine if a process is stable or predictable, within limits
Benchmarking
For Quality Control. Compares current project processes to comparable projects
Design of Experiments
For Quality Control. A statistical method to determine influential factors on a product or process
Statistical Sampling
For Quality Control. Choosing a representative sample from a population of interest for inspection
Cost of Quality
For Quality Control. Costs incurred for quality, includes cost of conformance and cost of non-conformance
Six Sigma
For Quality Control. Improves the quality of process outputs by identifying and removing causes of errors
Quality Audits
For Quality Assurance. Compliance with policies, standards, and processes
Process Analysis
For Quality Assurance. Planned continuous improvement of processes
Others…