Ah, the south end of the project linking the tunnels to the existing Parkland Walk route toward Finsbury Park is indeed much simpler and benefits from a natural progression into an already repurposed walking and cycling path. However, connecting your newly renovated tunnels to the Parkland Walk and linking it all the way back into Finsbury Park, including upgrades and a new crossing over the East Coast Main Line (ECML), still presents considerations in cost, design, and impact.
Let’s consider each aspect of the southern extension in detail:
1. Parkland Walk Route (Existing Path)
The Parkland Walk South is a much-loved pedestrian and cyclist route that runs along the former railway line southeast from Highgate to Finsbury Park. However, while functional, parts of the route may require upgrades to safely and effectively accommodate the increased traffic expected from the repurposed tunnels and its connection to this route.
Upgrades Needed:
Estimated Parkland Walk Improvements:
£500k–£1.5M (depending on the scope of upgrades).
2. Crossing the ECML (East Coast Main Line)
One of the biggest challenges along the southern route is crossing the East Coast Main Line north of Finsbury Park. While this is a separate funding issue, it’s important to integrate consideration of the cycle/pedestrian link into the broader plan. Building a new footbridge specifically for the ramp connection to Finsbury Park will require some thoughtful design.
Design Considerations for New Footbridge:
-
Preferred Bridge Type:
- A steel truss or box-girder foot/cycle bridge is the most common choice for crossing long spans like the ECML. It’s cost-effective and durable. For pedestrian and cyclist traffic, the bridge width should be at least 3m (preferably wider) to allow two-way movement.
-
Span Requirements:
- The bridge will need to span 4–6 active tracks of the ECML, plus additional space for parapets or sidings, which could require a clearance of 30–50m, depending on the exact positioning. Network Rail standards also require significant height clearance (~6.1m).
-
Accessibility Needs:
- To ensure compliance with accessibility standards, the bridge approaches must include ramps or a gradient-friendly spiral descent (see below) on the Finsbury Park side.
Approximate Cost of New Footbridge:
Costs for cycle/pedestrian bridges depend on span length and features:
- Standard spans (~30-50m): £1.5M–£3.5M
- Approaches and additional costs (ramps, railings, and supports): £500k–£1.5M.
3. Spiral Descent into Finsbury Park
Once the footbridge over the ECML is in place, a modern spiral descent on the Finsbury Park side would provide safe access to the park while being less visually intrusive than a full-length ramped viaduct.
Advantages of a Spiral Descent:
- Compact Design: Fits into the dense urban environment and reduces the spatial footprint.
- Environmental Considerations: Blends into the park without lengthy ramps cutting through green space.
- Accessibility: Provides a smooth, consistent slope for cyclists and pedestrians, conforming to the same 1:20 gradient (equal to ramps).
- Cost Efficiency: Building a spiral descent is often cheaper than a long elevated viaduct as it reduces material use and visual impact.
Spiral Descent Design Features:
Approximate Cost of Spiral Descent:
Costs for constructing a modern spiral ramp are dependent on height and materials:
- Typical spiral ramp construction cost: £750k–£1.5M.
4. Final Connection into Finsbury Park (Southern Node)
The southern terminus of the project must seamlessly connect to Finsbury Park’s existing cycle/pedestrian network, linking into the busy commuter and leisure traffic in the area.
Elements to Consider:
- Designating/signposting the new route into Finsbury Park to connect with TfL’s Cycleways (such as Cycleway 50 that passes through Finsbury Park).
- Creating new bike parking facilities or a hub for cyclists near the park entrance to serve the influx of new users.
- Collaboration with Finsbury Park operators to ensure the new infrastructure blends with existing paths.
Estimated Southern Node Costs:
£100k–£200k (depending on enhancements like bike hubs, signs, etc.).
Estimated Costs for the Southern Section
| Component | Estimated Cost (£) |
|---|
| Parkland Walk upgrades (surface, signs, etc.) | 500k–1.5M |
| New ECML footbridge | 2M–5M |
| Spiral descent on Finsbury Park side | 750k–1.5M |
| Final connections into Finsbury Park | 100k–200k |
| Total Estimated Cost (Southern Section) | £3.35M–8.2M |
Key Points and Benefits
- The southern portion is logistically simpler than the northern ramp near Highgate Wood but still requires thoughtful integration of major infrastructure (e.g., the ECML crossing) and modest upgrades to the Parkland Walk.
- A spiral descent setup at Finsbury Park’s northern end minimizes visual intrusion compared to a long elevated structure, which could disrupt the skyline and park aesthetics.
- The connection into Finsbury Park ties this project into existing public cycling/walking infrastructure, serving as a key node for active travel.
Final Thoughts
The southern section of this project flows naturally into the Parkland Walk and terminates in Finsbury Park, making it an elegant and functional extension. Upgrades to the walk and the connection over the ECML are necessary but align with broader goals of improving London’s active travel infrastructure. With proper design and funding, this section could serve as a flagship example of urban regeneration for cyclists and pedestrians.